HomeMy WebLinkAbout2024-023 CC Reso FY 24-25 SB114 F1.112,1161".30 'all 011 T'T • would not have otherwise been possible without SIB 1; and WHEREAS, the City has undergone a robust public process to ensure WHEREAS, the City used a Pavement Management System to develop and cost-effective projects that also meet the communities priorities for transportation investment; and SoIrces'1111IMM"F7=11131 lullaffiltdit-L-Alb ^I lye UT-rs--&-UTIIn f street Which runs parallel to the 1-10, improve eight (8) various street segments in the City, install a new traffic. signal at one intersection, and complete a citywide comprehensive sidewalk repair project, and Resolution No. 2024-023 FY 24-25 S131 Page 2 of 12 WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment found that the City streets and roads are in an "at lower risk" condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a "excellent" condition; and WHEREAS, cit�ies and counties own and operate more than 81 percent iWi6i Ai upon a safe, reliable local transportation network; and WHEREAS, miodernizing the local street and road system provides weill-paying construction jobs and boosts local economies-, and WHEREAS, police, fire, and emergency medical services all need safe reliable roads to react quickly to emergency calls and a few minutes of delay can be a matter of life and death; and Nmms it air quality and greenhouse gas emissions reductions goa s, and WHEREAS, restoring roads before they fail also reduces construction time which results in less air pollution from heavy equipment and less water pollution from site run-off; and M zimmi NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BAILDIMPM1. PARK HEREBY RESOLVES AS FOLLOWS: 111101 mis, MTMMI��MMM3��� Section 2. The following list of newly proposed projects will funded in -part or solely with Fiscal Year 2024-25 Road Maintenance and Rehabilitation Account reve't ues, I I IM FY 24-25 SBI Page 3 of 12 1. City Wide Sidewalk Repair Project. The city is launching -a- comprehensive sidewalk repair project, which includes removing and replacing non-comipliant concrete sidewalks and curb ramps, as well as making improvements in Community Development Block Grant (CDBG) areas. These enhancements a M to mprove the pedestrian path of travel and connectivity within the City Right of Way. Other improvements include curb and gutter repairs and bringing existing driveways to ADA compliance. Locations specified in Attachment 1. • The project is estimated to start construction; in January 2025 and be completed by June 2025. • The estimated project useful life is 22 years. 2. Root and Puente Traffic Signal and Street Improvements. Work includes construction of Traffic Signals at intersection of Root St and Puente Ave. Street improvement limits will be between Puente Ave at Root St to northeast city limit�. The construction will also include enhancements to existing crosswalks, ADA ramps, concrete sidewalk, and curb and gutter repairs. The work also includes paving improvements including 2" AC cold mill and overlay • The project is estimated to start preconstruction in October 2024, Construction in April 2025 and be completed by April 2026. • The estimated project usefull life is over 25 years. 3. Los Angeles St. Project. Work includes preparation of plans, specifications and estimates for the maintenance and rehabilitation of Los Angeles Street from City limit to city limit. The Asphalt Concrete (AC) pavement work includes grind and overlay of existing AC sections, removal and replacement of curbs and/or gutters, sidewalks, curb ramps, and cross gutters. Other improvements include the installation of detectable warning surfaces, installation of pruning tree roots and installing root barriers. Related work includes surveying, adjusting manhole covers and utility covers to finished grade, and traffic control. FY 24-25 S131 Page 4 of 11 October 2024, Construction in April 2025 and be completed by March 2026. The estimated project useful life is over 25 years. S e gt i �on 3. The following previously proposed and adopted projects may 21so utilize FiscQ]-Ye,-.r Rehabilitation Account revenues in their delivery. With the the City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues: 4. Various Streets Improvement Project. Work includes preparation of plans, specifications and estimates for the maintenance and rehabilitation of various streets throughout the city that were considered to have a low pavement management index as determined by the 2021 Pavement Management Report. The improvements include reconstruction of portions of the street structural section including sub -surface preparation, subgrade and constructing aggregate base and asphalt concrete (AC) pavement sections, construction of sidewalk and driveways, construction of accessible pedestrian ramps and major curb/gutter repairs. Locations specified in Attachment 2. The project is estimated currently in preconstruction, Construction to begin February 2025 and be completed by September 2025. a The estimated project useful life is 25 years. ATTEST: STATE OF CALIFORNIA G W 0 M 0 1 . I WMTOMMUNW."AMIYA FY 24-25 SBI Page 5 of 12 -e� EMMANUE'(XI DA MAYOR 1, Christopher Saenz, City Clerk of the City of Baldwin Park do hereby certify that the foregoing Resolution No. 2024-023 was duly adopted by the City Council of the City Baldwin Park at a regular meeting thereof held on June 5, 2024 and that the same w adopted by the following vote to wit- I AVILA, DAMIAN, GARCIA, AYALA, ESTRADA AYES, NOES: t-A //-\ CHkr.eT'OPHER SAENZ CITY CLERK rY 24.25 SBI Page 6 of 12 SB1 — Road Repair and Accountability Act Fiscal Year 2024-2025 Prlo'ect List 00� Location Schedule Useful No Project Life Description City Wide Sidewalk Repair Project. The city is launching a comprehensive sidewalk repair project, which Includes removing and replacing non -compliant concrete sidewalks and curb ramps, as well as making improvements in Community Development Block Grant (CDBG) areas. These enhancements aim to January improve the pedestrian path of travel and connectivity 2025 within the City Right of Way, Other improvemen s v�'a curb and itter re�s:airs and b tinv riveways to ADA compliance, Specific locations listed in Attachment 1. April MI A ld��Jll'and ov rlay Los Angeles St. Project: Work includes preparation� of plans, specifications and estimates for thd, Pre - maintenance and rehabilitation of Los Angeles Stree from City limit to city limit, The Asphalt Concrete (AC), Los October 1 pavement work includes grind and overlay of existin Angeles St AC sections, removal and replacement of curbs and/orl 2024 from Little gutters, sidewalks, curb ramps, and cross gutters. John to Other improvements include the installation of I Park Ave detectable warning surfaces, installation of pruning tree roots and installing root barriers. Related work April includes surveying, adjusting manhole covers andl 2025 utility covers to finished grade, and traffic control. Resolution No. 2024-023 FY 24-25 SBI Page 7 of 12 id Section 3 - Previously Proposed and Approved Projects for PY22-23 Funding Ell arious Streets Improvement Project. Work include of plans, specifications and estimates for tl idex as determined by the 2021 Pavement Manageme ,eport. The improvements include reconstruction of portions it -&&et W84, Agrade and constructing aggregate base and asph: #ncrete (AC) pavement sections, construction of sidewalk at riveways, construction of accessible pedestrian ramps at or curbIgutter repairs. Street segments are included ,ttachment 2, Pre - Construction Various In progress 25 Locations Construction years February 2025 Resolution No. 2024-023 FY 24-25 SBI Page 8 of 12 illilllilillill if!I1111 I r�11111111 aim= rl FY 24-25 SB1 Page 9 of 12 mm� wwm1��W :1"1101111 Resolutiono2024-023 FY 24-25 SBI Page 11 of 12 luml • 121TOWAIM mul FY 24-25 SB1 Page 12 of 12 qIplillirlig