HomeMy WebLinkAbout04.09.24 SOC Staff ReportMEASURE BP
STAKEHOLDERS OVERSIGHT
COMMITTEE
REGULAR MEETING
Chair
Betsy Lara
Vice -Chair
Pastor Elmer Jackson
Member
Jorge Hernandez
Member
Estela Mata-Carcamo
Member
Gregory Orozco
Agenda Member Sasha Rodriguez
yam
April 09, 2024, 5:00 PM Member Nghiem Van Nguyen
Welcome to your Stakeholders Oversight Committee Meeting
We welcome your interest and involvement in the City's legislative process. This agenda includes information about
topics coming before the Stakeholders Oversight Committee and the action recommended by city staff. You can read
about each topic in the staff reports, which are available on the city's website and in the Office of the City Clerk.
Please note that, in the event of a technical issue causing a disruption in the call -in option or internet-based
option, the meeting will continue unless otherwise required by law, such as when a Board Member is attending
the meeting virtually pursuant to certain provisions of the Brown Act.
Electronic devices are to be turned off during the Stakeholders Oversight Committee meetings are in session.
How to witch
The City of Baldwin Park provides two ways to watch a Stakeholders Oversight Committee meeting:
In Person
Most SOC meetings take
place at City Hall, 14403 E. Pacific
Ave., Baldwin Park, CA 91706
Online
Audio streaming will be available at
Individuals with disabilities may request an agenda packet in appropriate alternative formats as required by the
Americans with Disability Act of 1990..Reasonable accommodations and auxiliary aids will be provided to effectively
allow participation in the meeting. In compliance with the ADA, if you need special assistance for the meeting, please
contact the City Clerk's Office at (626) 960-4011 ext. 466 or squinones@baldwinpark.com. within 24 hours prior to the
meeting so the City can make reasonable arrangements to ensure accessibility.
The public is encouraged to address the City Council or any of its Agencies listed on this agenda on any matter posted on
the agenda or on any other matter within its jurisdiction. In accordance with Chapter 39 of the Baldwin Park. Municipal
Code, Speakers must address the Council as a whole and refrain from making impertinent, slanderous, or profane remarks
or disrupt the peace of the meeting. Speaker cards are available at the podium and by request with the City Clerk.
There is a three -minute speaking time limit. This is the time set aside to address the City Council. Please notify the City
Clerk if you require the services of an interpreter. No Action may be taken on a matter unless it is listed on the agenda, or
unless certain emergency or special circumstances exist. The legislative body or its staff may: 1) Briefly respond to
statements made or questions asked by persons; or 2) Direct staff to investigate and/or schedule matters for consideration
at a future meeting. [Government Code §54954.2] If you wish to comment on agenda items and are unable to physically
appear in person, please email your name, place of residence, item number or topic and a phone number where you will
be available between the hours of 7:00 PM during City Council Meetings to commentsL&baldwinpark.com.
INVOCATION
PLEDGE OF ALLEGIANCE
ROLL CALL
PUBLIC COMMUNICATIONS
NEW BUSINESS
1. Measure BP Sales Tax Financial Update
2. Stakeholders Oversight Committee (SOC) March 12, 2024 Meeting Minutes
It is recommended that the Committee approve the Minutes of the Regular Measure BP
Stakeholders Oversight Meeting held on March 12, 2024.
3. City and Community Empowerment Investment Opportunity Category- Requests for
Funding Framework
It is recommended that the SOC consider the following:
1. Discuss and develop a framework and criteria by which Requests For Funding can be
submitted by directly by residents, neighborhood groups, community organizations, church
organizations and school organizations under the City and Community Investment
Category.
2. Upon ample discussion and deliberation over perhaps several meetings, SOC will approve
the framework and criteria for the City and Community Investment Category.
4. Proposal- Request For Measure BP Funding- Improvements at Morgan Park
It is recommended that the SOC:
1. Discuss the scope of the proposed improvements at Morgan Park to further refine the extent
of the funding request.
2. Upon finalization of the scope of the improvements, approve Measure BP Funds for the
implementation of improvements at Morgan Park:
- Investment Opportunity Category: Recreation and Parks
- Subcategory: Parks
- Requester: Recreation and Community Services Department (RCS) $1,000,000
- Dollar Amount Requested: To Be Further Refined- First Estimate
Forward recommendation of approval to the City Council
STAKEHOLDERS OVERSIGHT COMMITTEE/STAFF REQUESTS &
COMMUNICATIONS
5. Next SOC Regular Meeting — Tuesday, May 14, 2024 at 5:00 p.m.
I_l11111111►1111Diem Y
CERTIFICATION
I, Shirley Quinones, Chief Deputy City Clerk of the City of Baldwin Park hereby certify that, under penalty of perjury
under the laws of the State of California that the foregoing agenda was posted on the City Hall bulletin board not less
than 72 hours prior to the meeting.
Shirley Quinones
Chief Deputy City Clerk
For further information regarding agenda items, please contact the office of the City Clerk at (626) 960-4011 ext. 466
or via e-mail at squinonesL&baldwinpark.com.
Measure BP Sales Tax (TUT)
_ .-------- __ __ _ ...
l�ee�►a�n�aee
__......
Measure BP Sales Tax
May .2023-February 2024 Remittance
$5,671,518
March 2,024 Remittance apt recent month)
04,59
Interest Income
Interest Income through October- 2023
14,207
Total Revenue Received
$6,390,316
Expenditures
11 Police new vehicles with 5-year lease approved by O on
., . ,000
0 4 & by CC on , o (committed and net yet spent)
Two -Way APX Radio System by Motorola Solutions approved by SOS
1 ,297,301
on 4 & by CC on 0 4 (committed and not yet pent
Architectural services for Concept Reports for a proposed sports
complex, ppro ed by SOC on 0 4 & by CC on 3/6/2024
$ 80,000
(committed and not fret spent
Total Expenditures Include Committed
$2,513,301
Projected Fund Balance as of March 31 2024
$318771014
TUT=Transactions & Use Taxes
ITEM NO. 2
TO: Chair and Members of the Measure BP Stakeholders
HU�OF�
Oversight Committee
saNaiE�� FROM: Shirley Quinones, Chief Deputy City Clerk
co �.VAL�EY 0,
DATE: April 9, 2024
SUBJECT: Stakeholders Oversight Committee (SOC) March 1.2, 2024
Meeting Minutes
SUMMARY
The Committee held the Regular Measure BP Stakeholders Oversight Meeting on March 12, 2024.
RECOMMENDATION
It is recommended that the Committee approve the Minutes of the Regular Measure BP Stakeholders Oversight
Meeting held on March 12, 2024.
FISCAL IMPACT
There is no fiscal impact associated with this item.
LEGAL REVIEW
This report does not require legal review.
ATTACHMENTS
1. March 12, 2024 SOC Meeting Minutes
Page l/I
MEASURE BP STAKEHOLDERS
OVERSIGHT COMMITTEE
REGULAR MEETING
Minutes
March 12, 2024, 5:00 PM
These minutes are presented in Agenda order.
Chair
Betsy Lara
Vice -Chair
Pastor Elmer Jackson
Member
Jorge Hernandez
Member
Estela Mata-Carcamo
Member
Gregory Orozco
Member
Sasha Rodriguez
Member
Nghiern Van Nguyen
CALL TO ORDER
The meeting was called to order at approximately 5:13 p.m. by Chair Lara.
INVOCATION
The invocation was given by Vice -Chair Pastor Jackson.
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Chair Lara.
ROLL CALL
Chief Deputy City Clerk Quinones:
MEMBERS
Member Jorge Hernandez (present)
Member Estela Mata Carcamo (present)
Member Gregory Orozco (present)
Member Sasha Rodriguez (present)
Member Nghiem Van Nguyen (present)
Vice -Chair Elmer Jackson (present)
Chair Betsy Lara (present)
PUBLIC COMMUNICATIONS
Chair Lara opened public communications at approximately at 5:16 p.m., the following spoke:
1) John Rios
2) Jesse Plata
Seeing no one else wishing to speak public communications was closed.
STAKEHOLDERS OVERSIGHT COMMITTEE/STAFF REQUESTS &
COMMUNICATIONS
103 113013 ILI IQ
1. Proposal- Request For Measure BP Funding- Public Works Department- Bus Stops ADA
(Americans with Disabilities Act) Upgrades - One Crew Cab Pick Up Truck- One
Backhoe
Approve Measure BP Funding for:
1. The construction upgrades of designated bus stops across the City to meet ADA Standards
at a minimum, and
SOC Meeting Minutes-03-12-2024
Page 1 of 2
2. For the Lease of One Full Size Crew Cab Pick -Up Truck, and
3. For the :Purchase of One Backhoe Loader (Kubota Tractor) for use across the Public
Works Department.
Investment Opportunity Category: Street Infrastructure
Subcategories: Bus Stops; Equipment
Requester: Public Works Department
Dollar Amount Requested: $502,076.00 (including contingency)
Forward Recommendation to City Council
MOTION: It was moved to split the request of Item 1 recommendation 2 and 3 to vote
separately and table ADA Upgrades by Besty Lara Seconded by Estela Mata-Carcamo. AYES:
HERNANDEZ, MAT-CARCAMO, OROZCO, RODRIGUEZ, VAN NGUYEN, JACKSON,
LARA. Motion Passed [7 — 0].
MOTION: It was moved to lease crew cab pick-up and purchase backhoe loader (Kubota
Tractor) by Besty Lara, Seconded by Nghiem Van Nguyen. AYES: HERNANDEZ, MAT-
CARCAMO, OROZCO, RODRIGUEZ, VAN NGUYEN, JACKSON, LARA. Motion Passed
[7 — 0].
2. Measure BP Sales Tax Financial Update
3. Stakeholders Oversight Committee (SOC) February 13, 2024 Meeting Minutes
Motion to approve the Regular Measure BP Stakeholders Oversight Meeting Minutes held on
February 13, 2024.
MOTION: It was moved to approved minutes by Besty Lara, Seconded by Gregory Orozco.
AYES: HERNANDEZ, MAT-CARCAMO, OROZCO, RODRIGUEZ, VAN NGUYEN,
JACKSON, LARA. Motion Passed [7 — 0].
ADJOURNMENT
Chair Lara motioned to adjourn the meeting at approximately 7:05 p.m.
ATTEST:
Shirley Quinones, City Clerk
APPROVED: April 9, 2024
Besty Lara, Chair
SOC Meeting Minutes-03-12-2024
Page 2 of 2
ITEM NO. 3
TO: Chair and Members of the Measure BP Stakeholders
Oversight Committee (SOC)
saNa�E�,� FROM: Enrique C. Zaldivar, City Manager
°�gDJAN�P`DATE: April 9, 2024
SUBJECT: City and Community Empowerment Investment Opportunity
Category- Requests for Funding Framework
SUMMARY
SOC adopted ten (10) investment Opportunity Categories at its meeting of February 13, 2024. Category A City
and Community Empowerment is intended to provide a direct opportunity for residents, neighborhood groups,
community organizations, school organizations, church organizations, to submit requests for funding for projects,
programs, or initiatives, that will result in a benefit to the community and its residents. This staff report initiates
the development of a framework by which such requests for funding can be considered.
It is recommended that the SOC consider the following:
1. Discuss and develop a framework and criteria by which requests for funding can be submitted by
directly by residents, neighborhood groups, community organizations, church organizations and school
organizations under the City and Community Investment Category.
2. Upon ample discussion and deliberation over perhaps several meetings, SOC may approve the
framework and criteria for the City and Community Investment Category.
FISCAL IMPACT
The cost of community requests for funding will depend on the nature of each of the requests, and will also be
based on the criteria approved by the SOC as to a cost maximum limit per request and the total allocation for this
category.
BACKGROUND
The Investment Opportunity Categories adopted by the SOC provide a clear guideline on the priorities for
investment areas for the SOC in its role as an oversight body on recommending use of Measure BP funds to the
City Council. Generally, requests for funding in most Investment Opportunity Categories would originate from a
City department thru the CEO. The City and Community Empowerment category, however, is uniquely intended
for residents and community organizations to initiate and present requests for funding thru the Office of the CEO,
to be presented for consideration by the SOC.
DISCUSSION
Being able to identify and recognize areas of needed improvement at the neighborhood level is most often more
effectively done by the residents who live in the neighborhood, or who frequently traverse any one of the city
neighborhoods on their way to work, school, to the store, on a walk, etc, Such ideas can range from a most basic
issue such as a lifted sidewalk, lack of night lighting, over -speeding zones, to more elaborate ideas that would
provide an enhancement and beautification to the community, such as tree canopy and landscaping in a given
block or an entire community; installation of pet/dog waste stations for the convenience of residents and the
Page 1 / 2
prevention of messy and polluting mishaps; conducting community clean ups which mobilize residents to further
come for their neighborhood; or even the development of a small pocket park in a neighborhood.
Community and school organizations may for example present requests for funding group field trips to museums,
science centers, zoos, government civic centers, further empowering our communities with knowledge.
Depending on the nature of the requests under this category, it is anticipated that many will be assigned to a city
department for implementation.
A through and open discussion by the SOC on this subject will lead to the establishment of a refined and clear
criteria for the proposals as well as establishing a process by which the opportunity can be more effectively
promoted and advertised to all residents and community organizations, being mindful that the process must be
accessible and simplified enough so as to not create unnecessary deterrents or barriers for residents to participate.
ALTERNATIVES
None recommended.
LEGAL REVIEW
This report has been reviewed and approved by the City Attorney as to legal form and content.
ATTACHMENTS
1. Staff Report from February 13, 2024- Investment Opportunity Categories
Page 2/2
SOC ITEM NO. 1
Im
c.i x
,.,SA �aBiE� FROM:
DATE:
-401,310141 l�
Chair and Members of the Measure BP Stakeholders
Oversight Committee (SOC)
Enrique C. Zaldivar, City Manager
February 13, 2024
Measure BP- Investment
Formulation and Prioritization
Opportunity Categories -
SUMMARY
In line with the early work of the SOC following its inaugural meeting of August 8, 2023, this staff report begins
the process of developing a framework by which the SOC can consider and review proposals for projects,
programs, and initiatives, in deciding whether to advance them as a recommendation to the City Council. The
framework will establish investment opportunity categories with a prioritization system within each
(subcategories).
RECOMMENDATION
It is recommended that the Measure BP Stakeholders Oversight Committee (SOC) adopt the following categories
as the guiding framework for considering investment opportunities proposals to be funded by Measure BP
revenue:
A. CITY AND COMMUNITY EMPOWERMENT
B. CITY WORK -FORCE DEVELOPMENT
C. ECONOMIC DEVELOPMENT
D. PUBLIC SAFETY
E. RECREATION AND PARKS
F. SENIOR COMMUNITY
G. SOPRTS DEVELOPMENT
H. STREET INFRASTRUCTURE
I. YOUTH DEVELOPMENT
J. MISCELLANEOUS
CEO Recommends approval of the Investment Opportunities Categories by the SOC.
FISCAL IMPACT
All proposals presented to the SOC, by definition, will be funding requests for Measure BP funds. The fiscal
impact will be determined based on the estimated cost of each project, program, or initiative that the SOC decides
to advance as a recommendation to the City Council.
BACKGROUND
At its meeting of August 8, 2023, the SOC considered a presentation on the development timeline of Measure BP
leading up its ultimate passage by the Baldwin Park voters on November 8, 2022. The presentation also
highlighted the primary responsibility of the SOC, which is to be the representative of the community in
prioritizing and recommending investment opportunities to the City Council. Developing a prioritization
Page 1 / 4
methodology is essential to enabling the SOC to approach its recommendation -making duty is a systematic
fashion.
DISCUSSION
Measure BP presents the City with a special opportunity to effectuate quality of life improvements for the benefit
of its residents, some of which will have a life-long and beyond lasting effect. The voters placed their trust in the
City by approving such a measure. The City Council, the SOC, and the Staff of the City are fully and
unconditionally committed to upholding the trust of the voters in ensuring that funds of Measure BP are invested
wisely, prudently, transparently, and always for the ultimate benefit of the City residents.
To that effect, a framework for establishing a prioritization system in a systematic and transparent way is herein
presented for the SOC's discussion and consideration. It is presented now in final from for adoption to be used as
a guideline in considering requests for funding from Measure BP.
The SOC has held three community engagement meetings to solicit and receive input from city residents on ideas
and priorities of the investment opportunity categories. The meetings were held as follows:
1. October 16, 2023 at the Arts & Recreation Center.
2. October 17, 2023 at Barnes Park Community Center.
3. January 18, 2024 at Foster Elementary School Auditorium.
Investment Opportunity Categories
The recommended nomenclature for organizing proposals of similar or related themes with the intent of
leveraging the maximum benefit from each proposed investment is as follows, with the categories listed in
alphabetical order:
A. CITY AND COMMUNITY EMPOWERMENT
B. CITY WORK -FORCE DEVELOPMENT
C. ECONOMIC DEVELOPMENT
D. PUBLIC SAFETY
E. RECREATION AND PARKS
F. SENIOR COMMUNITY
G. SOPRTS DEVELOPMENT
H. STREET INFRASTRUCTURE
I. YOUTH DEVELOPMENT
J. MISCELLANEOUS
In further refining more specific topics for project proposals, following is a listing of subcategories within each
category, which is where the first layer of prioritization is to be established. The population of subcategories
shown below is generic and not prioritized at this juncture. The prioritization will be established on a project by
project basis as requests for funding are being submitted.
A. City and Community Empowerment
• Neighborhood -based Improvements
• Neighborhood "Adopt a Project"
• Community Participation and Engagement
• Neighborhood Clean -Ups
• Housing Support
Page 2 / 4
B. City Workforce Development
• Recruitment and Retention of City Staff
• Special Training
• Competitive with other neighboring Cities
C. Economic Development
• Business Retention
• Business Development
• Creation of Jobs
• Beautification of Business Districts
• Business Loans
D. Public Safety
• Patrol Officers
• Equipment (e.g., Two-way Radios)
• Training
• Patrol Cars
• Community Policing
E. Recreation and Parks
• Parks
• Programs
• Specialized Programming (Dancing)
• Cultural Arts Programming
• Equipment
• Festivals and Special Events
F. Senior Community
• Programming
• Field Trips
• Senior Housing
G. Sports Development
• Youth Sports
• Adult Sports
• Sports Complex
H. Street Infrastructure
• Paving
• Signals
• Street Scapes
• Sidewalks
• Bikeways
• Parking Structures
• Localized Drainage
I. Youth Development
• Youth Employment
• Gang Prevention and Intervention
• Career Development
Page 3 / 4
J. Miscellaneous
Electric Vehicle Charging Stations
City Facilities
Events Center
ALTERNATIVES
SOC may consider other categorization and prioritization methodologies
LEGAL REVIEW
This report has been reviewed and approved by the City Attorney as to legal form and content.
ATTACHMENTS
1. Invest Opportunity Categories
Page 4 / 4
ITEM NO. 4
TO: Chair and Members of the Measure BP Stakeholders
Oversight Committee (SOC)
saNa�E�,� FROM: Enrique C. Zaldivar, City Manager
°�gDJAN�P`DATE: April 9, 2024
SUBJECT: Proposal- Request For Measure BP Funding- Improvements at
Morgan Park
SUMMARY
Parks are one of the most important assets of our community. Parks are intended to be used by our residents for
their recreation and enjoyment. Morgan Park is not only the City's flagship park, it is also used by thousands of
the city residents, precisely as intended. Morgan Park is in need of improvements to ensure that it can continue
to provide the service that residents expect and deserve.
RECOMMENDATION
It is recommended that the SOC:
1. Discuss the scope of the proposed improvements at Morgan Park to further refine the extent of the funding
request.
2. Upon finalization of the scope of the improvements, approve Measure BP Funds for the implementation
of improvements at Morgan Park:
- Investment Opportunity Category: Recreation and Parks
- Subcategory: Parks
- Requester: Recreation and Community Services Department (RCS) $1,000,000 -
- Dollar Amount Requested: To Be Further Refined- First Estimate
3. Forward recommendation of approval to the City Council
FISCAL IMPACT
RCS proposes to leverage Measure BP funds with multiple other sources of funds to make the significant
improvements needed at Morgan Park. The preliminary cost estimate for Measure BP Funds is $1 million . This
estimate may vary depending on the refinement of the scope following discussion and deliberation by the SOC.
Proposed breakdown of the complete project funding:
Funding Source
Identified Funding
Measure BP (REQUESTED)
$1,000,000'
Los Angeles County Regional Park and Open Space
District (Measure A)
$1,292,38 7
Community Development :Block Grant (CDBG)
$600,000
Estimated Total--
$2,892,387)
BACKGROUND
Page 1 / 2
As the City endeavors to increase the availability of parks space for both passive recreation and active recreation
like sports, it is crucial that we maintain and derive the highest potential of the parks already in existence. By
industry standards, the City is park -poor at 0.3 park -acres per 1000 residents compared to the industry standard
of 3.3 acres per 1000 residents. Investing in the renovation of existing parks is critical to ensure that the level and
quality of service that residents experience at our existing parks is uncompromised.
DISCUSSION
Morgan Park is the City's "Central Park", with it being located in the downtown district of the City, and being
home to so many and very active activity centers such as the Esther Snyder Community Center, the Julia McNeil
Senior Center, the Teri Muse Family Service Center, the Cesar Chavez Amphitheater which hosts the Concerts
at the Park series. Morgan Park is always vibrantly alive with residents participating in the many activities
organized by RCS. Much of the infrastructure of the park is maintained by the City's :Department of Public Works.
Members of the SOC and members of the community have expressed the need for Morgan Park to have better
lighting throughout the park and throughout the night. The proposed project will address this need.
While RCS has identified a conceptual scope of the range of improvements needed, it is best that the SOC take
up the proposal for discussion first to help further refine the scope of the project with the full and transparent
input from the members of the SOC, which may span for a few SOC meetings.
ALTERNATIVES
None recommended.
LEGAL REVIEW
This report has been reviewed and approved by the City Attorney as to legal form and content.
ATTACHMENTS
1. Staff report from RCS Department to the CEO
Page 2/2
T
F�A�D'i•�'' , TO: Enrique C. Zaldivar, P.E., Chief Executive Officer
'•,HUB OF
THE ° �P`", FROM: Manuel Carrillo Jr., Director of Recreation & Community Services
SAf BR' DATE: April 9, 2024
2co ILEY
SUBJECT: Request For Measure BP Funding for Morgan Park Improvements
SUMMARY
During the initial Community Engagement Meetings for American Recovery Project Act (ARPA) and
the Education Campaign of Measure BP, the community had expressed a desire to improve all public
facilities and add a sports park.
RECOMMENDATION
It is recommended that the SOC consider the approval of the Morgan Park Improvements.
Investment Opportunity Category: Recreation and Parks
Subcategory: Parks
Requester: Recreation & Community Services
Dollar Amount Requested: $1,000,000
Forward Recommendation to the City Council for Final Action
FISCAL IMPACT
Requested Funding will be a direct drawdown from the Measure BP Funds. As of February 2024, the
Fund balance was $5,685,725 which is sufficient to grant this request. The anticipated cost estimate
is approximately $2,892,387, listed below are the funding sources available.
Funding Source
Identified Funding
Community Development Block Grant CDBG
$600,000
Los Angeles County Regional Park and Open
Space District Measure A
$1,292,387
Measure BP REQUEST
$1,000,000
Anticipated Project Subtotal
$2,892,387
BACKGROUND
In 2010 the City completed the Morgan Park Improvements which included a revamped plaza with
playground and splash pad elements. The basketball courts were constructed well over 30 years ago.
Since then, the city has conducted numerous repairs including rubberized playground flooring, many
splash pad repairs and general maintenance floor resurfacing for the basketball courts. Additionally,
the Morgan Park Restroom Improvements are currently in plan check and will compliment this request.
DISCUSSION
According to the LA County Countywide Comprehensive Park Master Plan, Baldwin Park ranked as a
park poor community with .3 park acres per 1,000 compared to the County average of 3.3 per 1,000.
In addition, a mere 22% of the population has accessibility to walk to a park compared to the County
average of 49% being within walking distance of a park. Furthermore, Baldwin Park is rated as a very
high park need area according to the LA County's Park Metric. The city currently has a total of 4 active
parks and Morgan Park is the marquee park within its park system; thus, the usage is high when
compared to the rest of the inventory. The current playground is outdated, and the splash pad is a
recirculation system thus the features have exhausted its life expectancy.
The proposed conceptual plan proposes to expand the playground footprint to provide universal access
and significantly increase shade throughout the plaza area. Upon completion of the project, the
proposed improvements will increase accessibility for users of all abilities regardless of their mobility.
These contemporary upgrades will provide dynamic components that will enhance the play experience
for all users.
ALTERNATIVES
None being recommended.
LEGAL REVIEW
The City Attorney has reviewed the agreement and approved it as to form.
ATTACHMENT
1. Morgan Park Improvements Conceptual & Cost Estimate
I
I
I
m
I
0
I
I
a
0
I
I
CITY
PARK IMPROV M NTS
OF BALDWIN PARK
10
01
m
KEY NOTES
0 EXPANDED PLAY AREA INCLUDING NEW PLAY EQUIPMENT WITH A PORTION Of
PLAY STRUCTURE PLATFORMS ACCESSIBLE TO MOBILITY DEVICES. NEW
RUBBERIZED SURFACING DESIGN AND NEW SHADE SAIL DESIGN. NEW BACKED
BENCHES AROUND PERIMETER (12 QTY.)
EXISTING PLAY AREA: 4,500 5f
NEW PLAY AREA: G,52 I 5f
5YME30L LEGEND
0 NEW PLANTER AREAS AROUND PERIMETER Of PLAY AREA. EXISTING OLIVE TREE5
PROJECT BOUNDARIES (5 QTY.) RELOCATED TO THESE PLANTER AREA5.
30 EXPANDED SPLASH FAD AREA. EXISTING WATER FEATURES TO BE REPLACED,
AND NEW WATER FEATURES TO BE ADDED. NEW SHADE SAIL DESIGN.
EXISTING SPLASH PAD AREA: 1,777 5f
NEW SPLASH PAD AREA: 2,G84 5f
NEW CONCRETE SEAT WALL AND PORTION Of FENCING TO REPLACE EXISTING
LOW WALL AND PENCE. PORTION Of SEAT WALL TO BE A TWO-TIER TERRACE,
WITH THE UPPER PLATFORM BEING A SYNTHETIC TURF LOUNGE AREA,
TERRACED LOUNGE AREA: 334 5f
NEW SYNTHETIC TURF ON LOUNGE TERRACE
RENOVATED BASKETBALL COURT AND HOOPS WITH DECORATIVE BACKBOARDS,AT 5PLA5H PAD POLE5, AND COURT. COURT TO BE RE5URfACfD WITH A DUROCCAT
RELOCATED OLIVE TREE SURFACING DESIGN. EXISTING FENCING AND ENTRYWAY TO DE REPAINTED. NEW
SPORTS COURT LIGHTING POLES, EXISTING LIGHTING FIXTURES TO BE REUSED.
EXISTING BENCHES TO BE REPLACED WITH NEW (8 QTY.)
GO NEW CONCRETE PAD / WALKWAY.
70 PARK ENTRANCE MONUMENT TO BE REPAINTED. TILED PLANTER BOXES TO BE
REFURBISHED U51NG MATERIALS FROM DEMOLISHED PLANTER BOXE5. GREEN
SCREENS TO BE REMOVED.
NEW CIRCULAR BACKED BENCHES AROUND CENTRAL TREE.
O EXISTING CONCRETE DE51GN TO BE CLEANED, SANDBLASTED, AND RESEALED,
TYPICAL.
0 EXISTING PARKING LOT, NOT A PART
(D EXISTING COMMUNITY + SENIOR CENTER, NOT A PART
0 EXISTING OUTDOOR AMPHITHEATER, NOT A PART
(3 EXISTING OUTDOOR FITNESS CENTER, NOT A PART
0 EXISTING KE5TKOOM5, NOT A PART
2221 EAST WINSTON ROAD, SUITE A
ANAHEIM, CALIFORNIA 92806
PHONE 714-776-4340 FAx 714-776-4395
WWW.HAILANDARCH.COM LA# 17 10
Destination playground. Natural -materials theming with
rubber surfacing design. Portion of platform structures
accessible to mobility devices. Structures and colors to
be determined.
1-\40RGAN PARK: VISION BOARD
CITY OF BA DWIN PARK
MARCH 9, 0
New nature-nature-thCMCd 5PI35hifrom
Vortex.ipment to be, determined.
Mew circular enche5 around central tree.
Arti5tic 5hade, 5ail de5i6jn arc5 over the
play6yound and 5pla5hColor I
to be, determined.
Concrete
I I35h pad area with 2-tier5ynthetic
turf loun6je, terrace.
Renovated basketball court with Duracourt
Surfacing design. New basketball hoops. Color
and design to be determined.
2221 EAST WINSTON ROAD, SUITE A
ANAHEIM, CALIFORNIA 92806
PHONE 71 4-776-4340 FAx 7 1 4-776-4395
WWW.HAILANDARCH.COM LA# 17 10
City ofBaldwin Park, CA
Morgan Park
nomCEPTu
3.=, Estimate vfProbable Costs -March u9.20u4
GENERAL & SITE DEMOLITION
QTY
UNIT
COST
TOTAL
1 mvm|iz000n
1
|a
$
75.000z0
$75.000z0
u Remove Play Equipment, Footings, and Shade Sails
1
L8
$
20.000.00
*20.000.00
a Remove Rubberized Surfacing ouPlay Area
4.500
SF
$
auo
$13.500u0
4 Remove Splash Pad Equipment
1
LG
$
5.000.00
$5.008.00
n Remove Existing Low Wall and Fence noSplash Pad
1
La
$
*.non.00
$5,000.00
O Remove ExisinnTiled Planters and Green Screen, Sa|vane Handnamtedri|ea
13
sx
$
500.00
$0.500.00
7 Remove Existing Benches atBasketball Courts
n
sx
$
250.00
$2,000.00
8 Remove Existing Tree
u
EA
$
1.500.00
$3.000.00
eSvvPP&Erosion Control
1
LS
$
20,000.00
$20,000.00
10 Remove Existing Paving/Sidewalk
3.580
SF
*
5.08
*17.500.00
11 Clear and Grub
2,657
SF
$
0.70
$1.e59.90
12 Excavate, Grade, oachno&Compact
5.000
SF
$
1.74
$8.700.00
13 Tree Protection
1
LS
$
7,500.00
$7,500.00
14DEMOLITION SUBTOTAL
$185.5*9.e0
GENERAL SITE CONSTRUCTION
15 New Playground Equipment, (supp|y.shipping and installation)
1
|a
$
onn.nnoon
$800,000.00
10 New 0''x18^Concrete Play Curb
234
Lp
*
75.00
*17.550.00
17 New Rubber Surfacing otPlay Area
6.521
Sp
$
38.00
$247.798u0
18 Relocate Existing Olive Trees atPlay Area
n
EA
$
2.000.00
$10.000.00
1e Relocate Existing Benches atPlay Area
1
LS
$
3,000.00
$3,000.00
nO New Shade Sails atPlay Area and Splash Pad
1
LS
$
200.008.08
$200.808.08
21 Splash Pad Equipment Upgrade + Additional New Equipment
1
LS
$
200,000.00
$200,000.00
22 New Concrete Seat Wall, Synthetic Turf Terrace, and Fencing atSplash Pad
1
LS
$
150.000.00
$150.000.00
oo Renovation mExisting Concrete Paving and Splash Pad Concrete
1
LS
$
80,000.00
$80,000.00
24 Provide and Install 4^Thick Concrete
2.682
Sr
$
10.00
$43.072.00
xs Refinish Basketball Court with oumoounCoating Design
8.612
SF
$
10o0
$e6.120o0
oO Repaint Fencing and Entryway atBasketball Court
1
|S
$
3.000.00
$3.000.00
2/ Refurbish Existing Tiled Planters atEntry Monument, Remove omonsomnns
1
LS
$
2.000o0
$2,000.00
28 Repaint Park Entry Monument
1
|S
$
2,000.00
$2,000.00
oo Relocate Light Pole
n
sx
$
2,000.00
$6,000.00
oo Relocate Bike Rack
1
EA
$
500.00
$nOoon
o1Site Electrical
1
LS
$
75,000.00
$75,000.00
auGENERAL SITE CONSTRUCTION SUBTOTAL
$1.e26.0*0.00
SITE FURNISHINGS
aaProvide And Install Basketball Hoop and Backboard (2single, 1double)
n
ex
$
o.nnnon
$24.000u0
34 Provide And Install New Light Poles atBasketball Courts (use existing fixtures)
8
sx
$
2.000.00
$10.000.00
as Provide And Install New Backed Benches atBasketball Courts
u
sx
$
2.500.00
$20,000.00
30 Provide And Install New Curved Backed Benches atCentral Tree
9
EA
$
3.000.00
$27.000.00
or Provide and Install New Backed Benches atPlay Area
12
Ex
$
3,000.00
$36,000.00
37anE FURNISHINGS SUBTOTAL
$123.000.00
IRRIGATION
ae Modify Portion vfExisting Irrigation System
1.000
SF
$
sun
$*.noo.00
39 Provide and Install New Irrigation System
1.500
Sp
$
5.00
$7.500.00
40 Relocate Existing eaowDmwPmvvnu,,
1
LS
$
5,000.00
$5,000.00
41 Relocate Existing Irrigation Control Valves
B
sx
$
1.000.00
$8.000.00
42IRRIGATION SUBTOTAL
$25.500.00
LANDSCAPE
43 New Planter Areas
474
Sp
*
5.00
$2.370.00
44 Replace Turf Damaged During Construction
1
La
$
15.000u0
$1*.000.00
4sLANDSCAPE SUBTOTAL
$17.370.00
46 SUBTOTAL
$2.277.469.e0
47 Architecture and Engineering Design
10%
$227.74&99
48 Construction Contingency
10%
$227.746.89
49 Contractor General Cmi
r%
50 TOTAL
$2,892,386.77