Loading...
HomeMy WebLinkAbout1984 046 CC RESO1984 046 CC RESO(ÌìêRESOLUTION NO. 84-46 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK AMENDING RESOLUTION NO. 79-110 SETTING FEES AND CHARGES FOR ISSUANCE, PROCESSING AND FILING OF VARIOUS CITY SERVICES AND PERMITS. THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES RESOLVE AS FOLLOWS: SECTION 1. That the cost of issuing, processing and filing various city services and permits shall be in accordance with the attached Chart of Fees and Charges, marked Exhibit A". SECTION 2. That Resolution No. 79-110 and a11 amendments thereto, in conflict herewith are hereby rescinded. SECTION 3. That said Chart of Fees and Charges shall become effective July 1, 1984. SECTION 4. That the City Clerk shall certify as to the adoption of this Resolution and shall cuase the same to be processed in the manner required by law. APPROVED AND ADOPTED this 20th day of-iJune, 1984. Mayor ATTEST: LINDA L. GAI^CITY CLERK STATE OF CALIFORNIA COUNTY OF LOS ANGELES) SS: CITY OF BALDWIN PARK I, LINDA L. GAIR, City Clerk of the City of Baldwin Park do hereby certify that the foregoing resolution was duly and regularly passed and adopted by the City Council of the City of Baldwin Park at its regular adjourned meeting of the City Council on the 20th day of June, 1984 by the following vote: AYES: NOES: COUNCILMEN KING, GIBSCN, IZELL, McNEILL AND MAYOR WHITE COUNCILMEN NONE ABSENT: COUNCILMEN NONE BIB] 37673-U01 1984-U02 046-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO10091-U03 DO10261-U03 C6-U03 RESO-U03 2/20/2003-U04 ROBIN-U04 1984 046 CC RESO(ÌìêResolution No. 84-46 Exhibit A" 6-20-84 Page 1 of 5 CITY OF BALDWIN PARK EXHIBIT A" SCHEDULE OF FEES AND CHARGES DESCRIPTION AMOUNT Engineering Subdivision Fees Fi- ing and Plan Check Fee Tentative Map Parcel Map Tract Map Easement Deed Certificate of Compliance Street Vacation Covenant and Agreement Lot Line Adjustment Improvement Plans except water & grading) Water Facility Plans Grading Plans $125 $115 + $10/1ot $175 + $10/1ot $115 $115 $350 $115 $115 7% of Construction cost estimate. 2% of Construction cost estimate. $230 for 1,000 c.y. or less, plus $30 for ea. add'1 1,000 c.y, or part thereof. Reproduction Costs Blueline prints 24" x 36") Sepia 24" x 36") Final Map btueline Materials Purchase Plain Mylar 24" x 36") Printed Mylar 24" x 36") Pavement Restoration for Sewer Lateral Cut Refundable if work performed by permitee) Sewer Saddle $1.00 ea. $2.00 ea. $1.00 ea. $3.00 ea. $6.00 ea. $2.50/s.f. $ 50 ea. Planning Fees Minor Variances Zone Variance or Conditional Use Permit Amendment to the Zoning Code Amendment to the General Plan and Zone Change Zone Change only Development Agreement Categori cat Exempt!on Negative Declaration Environmental Impact Report $ 60 $290 $575 $800 combined public hearings) $575 Actual costs incurred by Staff. $ 30 $ 90* $170* * Plus any reasonable expenses for staff or consultant services as outlined in the City's Environmental Review Guidelines. in Zoning Map Copy General Plan Map Copy Appeals, Zoning Appeals, Subdivision Temporary Use Permits $3.00 ea $3.00 ea $ 90.00 $ 90.00 $115.00 BIB] 37673-U01 1984-U02 046-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO10091-U03 DO10261-U03 C6-U03 RESO-U03 2/20/2003-U04 ROBIN-U04 1984 046 CC RESO(ÌìêResolution No. 84-46 Exhibit A" 6-20-84 Page 2 of 5 DESCRIPTION AMOUNT Public Works Permit Fees Note: Permit fees are computed at 5% of the total valuation of the work to be done under the permit. The unit values listed shall be used in calculating the total work valuation as appropriate. Curb and Gutter Sidewalk 4" P.C.C.) Drive Approach 6" P.C.C.) Crushed aggregate base Asphalt pavement: 2" thick 4" thick 6" thick Wheelchair ramp 4" P.C.C.) Street Tree Installation Sewer Installation: 8"0 V.C.P. 6"0 V.C.P. Manhole $15.00/L.F. $ 3.00/S.F. $ 4.50/S.F. $ 1.00/S.F. $ 1.00/S.F. $ 1.50/S.F. $ 2.00/S.F. $400.00 ea. $130.00 ea. $ 20.00/L.F, $ 15.00/L.F, $1,500.00 ea. Publications Zoning Code Complete Zoning Code Addendum Subscription General Plan only) Technical Reports I, II, III, IV Map General Plan, Reports I, II, III, IV and Map $ 12.00 ea. $ 12.00/year $ 9.00 ea. $ 9.00 each report $ 3.00 each $ 40.00 complete package Building Permits Reinspection fee Certificate of Occupancy-Original Certificate of Occupancy-Subsequent Certificate of Occupancy-Temporary Building Regulations Variance Filing and Processing Fee Energy Conservation Regulation Plan Check and permit fee $34.50 No Charge $34.50 $57.50 $57.50 20% of total of building permit and plan check fee Uniform Plumbing Code For issuing each permit In addition For each plumbing fixture or trap or set of fixtures on one trap including water, drainage piping and backflow protection therefor) For each building sewer and each trailer park sewer Rainwater systems per drain For each sewer connection For each private sewage disposal system $ 7.00 $ 5.00 $12.00 $ 5.00 $34.50 $23.00 BIB] 37673-U01 1984-U02 046-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO10091-U03 DO10261-U03 C6-U03 RESO-U03 2/20/2003-U04 ROBIN-U04 1984 046 CC RESO(ÌìêResolution No. 84-46 6-20-84 Exhibit A" Page 3 of 5 DESCRIPTION AMOUNT For each sewer cap $ 5.00 For each water heater and/or vent $ 5.00 For each gas piping system of one 1) to five 5) outlets $ 5.00 For each gas piping system of six 6) or more, per outlet $ 1.15 For each industrial waste pre-treatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps $12.00 For installation, alteration or repair of water piping and/or water treating equipment $ 7.00 For repair or alteration of drainage or vent piping $ 5.00 For each lawn sprinkler system on any one meter including backflow protection devices therefor $ 5.00 For vacuum breakers or backflow protective devices on tanks, vats, etc., or for installation on unprotected plumbing fixtures including necessary water piping one to five $12.00 Over five, each $ 1.15 Plumbing Reinspection Fee $34.50 Uniform Mechanical Code Heating appliance $ 9.20 Relocate or replace vent $ 5.00 Contort Cooling Under 10,000 BTU $ 7.00 Over 10,000 BTU $12.00 Compressor or boiler Under 3 H.P. $ 9.20 Over 3 H.P. to 15 H.P. $17.25 Over 15 H.P. to 30 H.P. $12.00 Over 30 H.P. to 50 H.P. $34.50 Over 50 H.P. $57.50 Gas System $ 4.00 Vent Fan $ 5.00 Hoods $ 7.00 Miscellaneous $ 7.00 Permit Fee $ 7.00 Reinspection Fee $34.50 Electrical Code 30.1 Fees New Construction and Additions Permit issuance fee $11.50 + fee for each scheduled in Section 30.4 + $.035 per ampere for each service switch 600 folts or less; $.16 per ampere for each service switch in excess of 600 volts. In addition the following fees shall apply to each type of construction: a. Gasoline service station buildings $0.10/S.F b. Drinking or dining establishments $0.10/S.F c. Power plants pumping plants $0.10/S.F BIB] 37673-U01 1984-U02 046-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO10091-U03 DO10261-U03 C6-U03 RESO-U03 2/20/2003-U04 ROBIN-U04 1984 046 CC RESO(ÌìêResolution No. 84-46 Exhibit A" 6-20-84 Page 4 of 5 DESCRIPTION AMOUNT a. Woodworking establishments, planning mills $ 05/S.F. b. Steel mills, factories $ 05/S.F. c. Manufacturing plants, assembly plants $ 05/S.F. d. Gasoline service station open canopies $ 05/S.F. e. Repair garages, aircraft repair hangar $ 05/S.F. f. Ice plants, cold storage plants $ 05/S.F. g. Creameries, bakeries, food processing plants $ 05/S.F. h. Hotels, motels, apartment houses, lodging houses $ 05/S.F. i. Dwellings $ 05/S.F. j. Dry cleaning plants $ 05/S.F. a. Office buildings $ 03/S.F. b. Stores, markets wholesale or retail) $ 03/S.F. c. Hospitals, sanitariums, convalescent hospitals $ 03/S.F. d. Nursing homes, child nurseries $ 03/S.F. e. Schools $ 03/S.F. f. Churches, assembly buildings $ 03/S.F. g. Amusement park structures $ 03/S.F. h. Any occupancy not listed $ 03/S.F. a. Residential accessory building, attached or detached, such as private garages, carpots, sheds, etc. $ 02/S.F. b. Hotel, motel, and commercial parking garages and carports $ 02/S.F. c. Warehouses up to and including 5,000 sq. ft. $ 02/S.F. a. Warehouses that part which is over 5,000 sq. ft. b. Storage garages where no repair work is done c. Aircraft hangars where no repair work is done 30.2 Alterations and Additions. Where no structural work is being done, or where it is impractical to use the square footage schedule 30.3 Minimum Total Fee. For any type of construction or installation 30.4 Fees. For fixed motors, transformers, generators, heating and cooking appliances, etc. Converting all units to H.P. horse power), K.W. Kilowatt), K.V.A. Kilovolt ampere) fees shall be determined as follows: Up to and including 1 Over 1, not over 5 Over 5, not over 20 Over 20, not over 50 Over 50, not over 100 Over 100, not over 500 Over 500, not over 1000 Over 1000, not over.... $ 015/S.F. $ 015/S.F. $ 015/S.F. Use Fee Schedule 30.4 $12.00 minimum $ 4.00 $ 7.00 $ 9.20 $14.00 $18.40 $27.60 $41.40 $57.50 BIB] 37673-U01 1984-U02 046-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO10091-U03 DO10261-U03 C6-U03 RESO-U03 2/20/2003-U04 ROBIN-U04 1984 046 CC RESO(ÌìêResolution No. 84-46 Exhibit A" 6-20-84 Page 5 of 5 DESCRIPTION 30.5 a) Lighting Standards Not over 3 on a site Each additional over 3 on a site Lampholding devices, not a part of a lighting standard festoon type) Not over 50 Over 50, not over 100 Over 100 30.6 Signs and Outline Lighting One sign and gas tube system Each additional sign or gas tube system Each transformer or ballast Each motor or flasher Each tamphotding device in connection with a sign: from 1 to 20 inclusive, each next 100 each each additional 30.7 Temporary, Permanent or Construction Poles Temporary, underground and work-with services: Temporary underground service Temporary work-with service residential) Temporary work-with service commercial) 30.8 Miscellaneous Any electrical work for which a permit is required, but no fee is herein provided 30.9 Annual Maintenance Electrician Fee for each annual Maintenance Electrician Permit. Fees for all work installed under such permit since date of last previous inspection shall be paid according to the above schedule at the time the annual permit is issued. Where plans are required and the service is over 400 amps, a plan check fee equal to 50% of the permit fee shall be paid at the time plans are submitted. Uniform Sign Code Fees Fees per Building Permit Fees House Moving Permit filing and processing fee House Moving AMOUNT $ 7.00 $ 2.00 $ 9.20 $18.40 $27.60 $ 7.00 $ 7.00 $ 5.00 $ 2.00 $ 2.00 $ 20 $ 10 $ 06 $23.00 $13.00 $23.00 $12.00 $260.00 Mileage fee for out of town inspection $ 35/per mile BIB] 37673-U01 1984-U02 046-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO10091-U03 DO10261-U03 C6-U03 RESO-U03 2/20/2003-U04 ROBIN-U04