Loading...
HomeMy WebLinkAbout1987 050 CC RESO1987 050 CC RESO(Ìì÷HRESOLUTION NO. 87-50 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK AMENDING RESOLUTION NO. 86-86 SETTING FEES AND CHARGED FOR ISSUANCE, PROCESSING AND FILING OF VARIOUS CITY SERVICES AND PERMITS THE CITY COUNCIL OF THE CITY OF BALWIN PARK DOES RESOLVE AS FOLLOWS: SECTION 1. That filing various city accordance with the marked Exhibit A" the cost of issuing, processing and services and permits shall be in attached Chart of Fees and Charges, SECTION 2. That Resolution 86-86 and all amendments thereto, in conflict herewith are hereby rescinded. SECTION 3. That said Chart of Fees and Charges shall become effective July 1, 1987. SECTION 4. That the City Clerk shall certify as to the adoption of this Resolution and shall cause the same to be processed in the manner required by law. APPROVED AND ADOPTED this^iTunSs 3, 1987. Mayor ATTEST: STATE OF CALIFORNIA COUNTY OF LOS ANGELES ss CITY OF BALDWIN PARK I, LINDA L. GAIR, City Clerk of the City of Baldwin Park do hereby certify that the foregoing resolution was duly and regularly passed and adopted by the City Council of the City of Baldwin Park at its regular meeting of the City Council July 3, 1987 by the following vote: AYES: COUNCILMEN NOES: COUNCILMEN ABSENT: COUNCILMEN IZELL AND MAYOR PRO TEM GIBSON NONE NONE BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷HCITY OF BALDWIN PARK EXHIBIT A" SCHEDULE OF FEES AND CHARGES RESOLUTION NO. 87-50 DESCRIPTION Special Services Municipal Code Complete Municipal Code Addendum Subscription Zoning Code Complete Zoning Code Addendum Subscription City Budget Preliminary or Final Fingerprints Applicant supplies card and forwards to DOJ for clearance) Fingerprints Department takes prints and forwards to DOJ for clearance) Administrative Fee Entertainment Permit Initial Entertainment Permit Renewal Photographs 4x5 Contract Photographs 5x7 Enlargement Photographs 8x10 Enlargement Gun Permits $10.00 forwarded to State per P.C. 12054) Police Reports Police Background Investigations Civil Business Alarm Permits Initial Hookup Strong Motion Instrumentation Fee % of construction cost) Building Plan Records Letter size Other size Governmental Reports Agenda Packet General Plan only) Technical Reports I, Map General Plan, Reports I, IV and map II, II, IV II, III $50.00 each 10.00/year 12 00/year 12.00/year 12.50 each 6.00/set 6.00 set + State Fee 9.00/set 250.00 175.00 2.00 each 3.50 each 4.50 each 13.00 each 5.00 15.00/hour 25.00 0.007% 0.10/sheet 0.35/sheet 75 1st sheet of series 10 each add'l 10.00 each 9.00 each 9.00 each report 3.00 each 40.00 complete package Appeals Filing Zoning Public and processing fee and Subdivision Appeals Nuisances Abatement costs exceeds $1/000 Abatement cost less than $1,000 50.00 each 90.00 each 50.00 each 10.00 each Fireworks Permit and processing fee Compliance Deposit Liability Insurance Returned Checks NSF and etc. 5.00 each 50.00 As Required 10.00 each Bicycle License Annual To be set by State of California) BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷HResolution No. 87-50 Page No. 2 Animal Control Dog License Set by Los Angeles County Park Facilities and Recreation Activities Building Fees Fees/per hour/rate) Less than 100 More than 100 Res, Non-Res. Res. Non-Res. Assembly Hall Meeting Room/Craft Room Kitchen/Serving Equipment Light Refreshments Light Cooking Complete Meal $8.00 $12.00 5.00 8.50 2.00 3.50 6.00 3.50 6.00 9.00 $8.50 $13.50 6.00 10.50 Same Same Same Same Same Same Pool Fees Rental Residental) $40.00/l-99/2hrs./lguard 80.00/100-l99/2hrs./2guards 120.00/200-250/2hrs./3guards Admissions, Sr. Citizens Admissions, Adults 55 and Over 0.25 each 0.50 each 0.50 each 10.00 each 18 and Over Admissions/ Youth 17 and Under Swim Classes, Residents Registration Swim Classes, Non-Residents Registration Recreational Activities 15.00 each 5.00 each 2.50 each 15.00 each 10.00 each Classes, resident adults Classes, resident children Classes, non-resident adults Classes, non-resident children Non-Resident Application In Addition to Use Charges) Processing Fee 3.50 Special Facilities 5.00/hour Facilities not scheduled to be open 5.00/hour Lighting Sports Lighting-maximum 2 1/2 hours 10.00/game Application Filing Fee For Non-Residents only) 3.00 Additional Charges for Facilities other than Civic Auditorium Fees/per hour/rate) Resident $ 6.00 When facilities are not scheduled to be open When special facilities are no fee used, i.e. technical equipment When building is not vacated on time overtime rate will be assessed. Parade and Demonstration Non-Resident $10.00 10.00 Permit filing and processing fee 25.00 each BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷HResolution No. 87-50 Page 3 Refuse Collection and Disposal Franchise Fee 10% of gross collected by 10th each month as of Jan, 1980) Residential Fees Change 2/19/86 Res. No.86 Single Family units Multiple Family per unit Non-Exlusive Franchise Fee- Commercial and Industrial Business License Transfer to new location Duplicate, lost or destroyed Bankruptcy, Fire and Close-out Sales Filing and processing fee 30 day Filing and processing fee 60 day Filing and processing fee 90 day Bingo Permits Dances Permit filing and processing fee Safety Services Handbills Permit filing and processing fee Massage Parlors Permit filing and processing fee New employee checks Taxicabs Certificate and filing and processing fee Liability Insurance Changes in vehicles, schedules, etc.- Filing and processing fee Temporary Use Permits Filing and investigation fee See Planning Fees also) Street Benches Permit filing and processing fee Bench removals by City Bench storage by City max. 60 days Public Streets Construction, Excavation, Encroachment, Moving and Load Regulations Permit filing and processing fee Moving Load or Vehicle over width, height or weight per occurance Excavations Pavement min. $5.00 Dirt min. $5.00 Restoration- by Permittee by City 6.35/month 6.35/month/ 1st unit plus 4.00 each add'l unit 750.00 5.00 each 5.00 each 50.00 each 100.00 each 150.00 each 50.00/year 50.00 each 15.00/hour each 50.00/per per 250.00 each 25.00 each 500.00 As required Deleted 115.00 10.00/bench/year 25.00 each 10.00/week/each 25.00 each 5.00 each 0.05/S.F. 0.02/S.F. 0.10/S.F. 2.50/S.F. BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷HResolution No.87-50 Page 4 Encroachments Gunite Storage Gunite Cleanup-Deposit returnable) Overhead Structures Street Construction 5.00 each 20.00 each 5.00 each 5.00 or 5% of cost estimate whichever is greater Street Banners Permit filing and processing fee Engineering Fees Subdivision Filing and Plan Check Fee Tentative Map Parcel or Tract) Vesting Tentative Map Parcel Map final map) Tract Map final map) Easement Deed* Certificate of Compliance* Street Vacation* Covenant and Agreement* Lot Line Adjustment 25.00 each 200.00 1000.00 150.00 + $15/lot 200.00 + $15/lot 120.00 140.00 350.00 140.00 115.00 *The fee for these items includes only the review of the legal description and the research associated with the particular case. However, if the City provides the legal description add $60 to the fee indicated. Improvement Plans except water & grading) Water Facility Plans Drainage Plans Grading Plans 7% of construction cost estimate 1% of construction cost estimate 150.00 1. Project less than or equal to 24,000 SF 250.00 2. Project greater than 24/000 SF but less 350.00 than 50,000 SF 3. Project greater than 50,000 SF 450.00 Reproduction Costs Blueline prints 24"xl8") Blueline prints 24"x36") Sepia any size) Final Map Blueline Copy 8 1/2" x 11" or) 8 1/2" x 14" Materials Purchase 1.00 each 1.50 each 2.50 each 1.00 each 25 each Plain Mylar 24"x36") 3.50 each Plan & Profile Mylar 24"x36") 6.00 each Pavement Restoration for Sewer Lateral Cut 2.50/SF Refundable if work performed by permitee) BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷HResolution No. 87-50 Page 5 Sewer Connection Permit Fee Rectangular lot depth, 100 ft. or less Rectangular lot depth, more than 100 ft Irregular lot, frontage 60 ft. or less Irregular lot, frontage greater than 60 feet Each existing lateral utilized by property owner(s) Planning Fees Minor Variances Zone Variance or Conditional Use Permit Zone Variance Single Family Amendment to the Zoning Code Amendment to the General Plan and Zone Change Zone Change only Development Agreement Planned Development Review Fee Categorical Exemption Negative Declaration Enviornmental Impact Report review only) 8.00/foot 8.00/foot + 0.01/S.F. over 100 feet of depth 8.00/foot or 0.08/S.F. for the first 6000 S.F., whichever is greater, + 0.01/S.F. for all areas in excess of 6000 S.F. 8.00/foot + 0.01/S.F. for all areas in excess of 6000 S.F. 175.00 60.00 425.00 325.00 575.00 800.00 combined public hearing) 575.00 Actual costs incurred by Staff 400.00 30.00 90.00* 170.00* *Plus any reasonable expenses for staff or consultant services as outlined in the City's Environmental Review Guidelines. Zoning Map copy General Plan Map copy Appeals, Zoning Appeals, Tentative Maps Temporary Use Permits Public Works Permit 5.00 each 5.00 each 90.00 90.00 115.00 Note: Permit fees are computed at 5% of the total valuation of the work to be done under the permit. The unit costs listed shall be used in calculating the total work valuation as appropriate. In no event shall the minimum permit fee be less than $30.00. The cost of removals shall be calculated at 60% of the construction cost. Curb Only Roll Curb Cross Gutter Curb and Gutter Parkway Landscaping Sidewalk 4" P.C.C.) Drive Approach 6" P.C.C.) drushed Aggregate Base Asphalt Pavement: 4" thick 4" thick 10.00/L.F. 12.00/L.F. 16.00/L.F. 16.00/L.F. 2.00/S.F. 3.50/S.F. 4.50/S.F. 1.25/S.F. 1.50/S.F. 2.50/S.F. BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷HResolution No. 87-50 Page 6 Wheelchair Ramp 4" P.C.C.) Sewer Installation: 12"4 V.C.P. 8"0 V.C.P. 6"0 V.C.P. Manhole Sewer Saddle Dye Test permittee to provide dye) 450.00 each 25.00/L.F. 22.00/L.F. 17.00/L.F. 1700.00 each 170.00 each 30.00 each Pavement Restoration for utility cut) 6.00/S.F. $5.70/S.F. Refundable if work performed by permittee) Storm Drain Construction of a new catch basin C.B., transition structure, or manhole M.H. Modification of the existing C.B. or M.H. Drain pipe/roof drain Parkway drain Storm drain mainline RCP) Storm drain lateral RCP) Traffic Striping or lane line marking Lettering/arrow Street name signs 2) & post Traffic regulatory sign Traffic signal Traffic signal Traffic signal 2 to 4 phase) 5 to 8 phase) modification Street Light Street Tree Installation Publications 3000.00 each 2000.00 each 15.00/L.F. 500.00 each 75.00/L.F. 35.00/L.F. 0.15/L.F. 15.OO/ 250.00 each 170.00 each $70/000.00 90,000.00 15,000.00 2,000.00 each 160.00 each Zoning Code Complete Zoning Code Addendum Subscription General Plan only) Technical Reports I/ II, III, IV Map General Plan/ Reports I, II, III, IV and Map Uniform Building Code AT DUPLICATION COST Building Permits and Plan Checks Fees These fees also apply to sign permits and heating, air conditioning and refrigeration permits) AEIHB & B4 OCCUPANCIES Valuation Plan Check Bidg Permit 0 to 500 501 to 600 601 to 700 701 to 800 801 to 900 901 to 1, 000 1, 100 1, 200 1, 300 1, 400 4.88 5.85 6.83 7.80 8.78 9.75 10.73 11.70 12.68 13.65 7.50 9.00 10.50 12.00 13.50 15.00 16.50 18.00 19.50 21.00 BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷HResolution No. 87-50 Page 7 AEIHB & B4 OCCUPANCIES Valuation Plan Check Bidg Permit 1,500 14.63 22.50 1,600 15.60 24.00 1/700 16.58 25.50 1,800 17.55 27.00 1,900 18.53 28.50 2/000 19.50 30.00 3,000 25.35 39.00 4/000 31.20 48.00 5/000 37.05 57.00 6/000 42.90 66.00 7/000 48.75 75.00 8,000 54.60 84.00 9/000 60.45 93.00 10,000 66.30 102.00 11/000 72.15 111.00 12/000 78.00 120.00 13/000 83.85 129.00 14,000 89.70 138.00 15,000 95.55 147.00 16,000 101.40 156.00 17/000 107.25 165.00 18/000 113.10 174.00 19,000 118.95 183.00 20,000 124.80 192.00 21/000 130.65 201.00 22,000 136.50 210.00 23/000 142.35 219.00 24/000 148.20 228.00 25,000 154.05 237.00 26,000 158.93 244.50 27/000 163.80 252.00 28/000 168.68 259.50 29,000 173.55 267.00 30/000 178.43 274.50 31/000 183.30 282.00 32,000 188.18 289.50 33/000 193.05 297.00 34/000 197.93 304.50 35/000 202.80 312.00 36,000 207.68 319.50 37,000 212.55 327.00 38/000 217.43 334.50 39,000 222.30 342.00 40,000 227.18 349.50 41/000 232.05 357.00 42/000 236.93 364.50 43,000 241.80 372.00 44,000 246.68 379.50 45,000 251.55 387.00 46,000 256.43 394.50 47/000 261.30 402.00 48/000 266.18 409.50 49,000 271.05 417.00 50,000 275.93 424.50 51/000 279.83 430.50 52,000 283.73 436.50 53/000 287.63 442.50 54/000 291.53 448.50 55/000 295.43 454.50 BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷H Resolution No. 87-50 Page 8 AEIHB & B4 OCCUPANCIES Valuation Plan Check Bidq Permit 56,000 57/000 58/000 59/000 60/000 61/000 62/000 63/000 64/000 65/000 66/000 67/000 68/000 69/000 70/000 71/000 72/000 73/000 74/000 75/000 76/000 77/000 78/000 79/000 80/000 81/000 82/000 83/000 84/000 85/000 86/000 87/000 88/000 89/000 90/000 91/000 92/000 93/000 94/000 95/000 96/000 97/000 98/000 99/000 100/000 299.33 303.23 307.13 311.03 314.93 318.83 322.73 326.63 330.53 334.43 338.33 342.23 346.13 350.03 353.93 357.83 361.73 365.63 369.53 373.43 377.33 381.23 385.13 389.03 392.93 396.83 400.73 404.63 408.53 412.43 416.33 420.23 424.13 428.03 431.93 435.83 439.73 443.63 447.53 451.43 455.33 459.23 463.13 467.03 470.93 460.50 466.50 472.50 478.50 484.50 490.50 496.50 502.50 508.50 514.50 520.50 526.50 532.50 538.50 544.50 550.50 556.50 562.50 568.50 574.50 580.50 586.50 592.50 598.50 604.50 610.50 616.50 622.50 628.50 634.50 640.50 646,50 652.50 658.50 664.50 670.50 676.50 682.50 688.50 694.50 700.50 706.50 712.50 718.50 724.50 *$725.00 for the first $100/000 + $5.00 for each additional $1/000 or fraction thereof. **Plan Check Fees: A plan check fee shall be paid at the time plans are submitted: Plan check fee shall be 65% of permit fee. EXCEPTION: No plan check fee will be charged for reroofing or air conditioning when plans are not required. Rl/ R3 & M Occupancies Valuation Plan Check Bidg Permit 0 to 500 501 to 600 601 to 700 701 to 800 801 to 900 901 to 1, 000 1, 100 1, 200 1. 300 1, 400 1, 500 1. 600 4.88 5.85 6.83 7.80 8.78 9.75 10.73 11.70 12.68 13.65 14.63 15.60 7.50 9.00 10.50 12.00 13.50 15.00 16.50 18.00 19.50 21.00 22.50 24.00 BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷H Resolution No. 87-50 Page 8-B Rl, R3 & M Occupancies Valuation Plan Check Bidg Permit Amendment to Page 8 continued 1,700 1/800 1/900 2,000 3,000 4,000 5/000 6,000 7,000 8,000 9,000 10,000 11,000 12/000 13,000 14,000 15/000 16,000 16.58 17.55 18.53 19.50 23.89 28.28 32.66 37.05 41.44 45.83 50.21 54.60 58.99 63.38 67.76 72.15 76.54 80.93 25.50 27.00 28.50 30.00 36.75 43.50 50.25 57.00 63.75 70.50 77.25 84.00 90.75 97.50 104.25 111.00 117.75 124.50 BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷H Resolution No. 87-50 Page 9 R3 & M Occupancies Valuation Plan Check Bidg Permit 17 000 85.31 131.25 18 000 89.70 138.00 19. 000 94.09 144.75 20,000 98.48 151.50 21/000 102.86 158.25 22,000 107.25 165.00 23,000 111.48 171.50 24, 000 116.03 178.50 25. 000 120.41 185.25 26, 000 124.31 191.25 27, 000 128,21 197.25 28, 000 132.11 203.25 29,000 136.01 209.25 30/000 139.91 215.25 31,000 143.81 221.25 32,000 147.71 227.25 33,000 151.61 233.25 34,000 155.51 239.25 35,000 159.41 245.25 36,000 163.31 251.25 37,000 167.21 257.25 38/000 171.11 263.25 39/000 175.01 269.25 40,000 178.91 275.25 41/000 182.81 281.25 42/000 186.71 287.25 43,000 190.61 293.25 44,000 194.51 299.25 45/000 198.41 305.25 46/000 202.31 311.25 47,000 206.21 317.25 48/000 210.11 323.25 49,000 214.01 329.25 50,000 217.91 335.25 51,000 220.60 339.38 52,000 223.28 343.50 53,000 225.96 347.63 54,000 228.64 351.75 55,000 231.32 355.88 56,000 234.00 360.00 57,000 236.68 364.13 58,000 239.36 368.25 59,000 242.05 372.38 60,000 244.73 376.50 61,000 247.41 380.63 62,000 250.09 384.75 63/000 252.77 388.88 64,000 255.45 393.00 65/000 258.13 397.13 66,000 260.81 401.25 67,000 263.50 405.38 68,000 266.18 409.50 69,000 268.86 413.63 70,000 269.59 414.75 71, 000 274.22 421.88 72,000 276.90 426.00 73,000 279.58 430.13 74,000 282.26 434.25 75,000 284.95 438.38 76,000 287.63 442.50 77,000 290.31 446.63 78/000 292.99 450.75 79, 000 295.67 454.88 80, 000 298.35 459.00 81,000 301.03 463.13 82/000 303.71 467.25 83/000 306.40 471.38 84, 000 309.08 475.50 BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷H 1987 050 CC RESO(Ìì÷H Resolution No. 87-50 Page 11 For each building sewer and each trailer park sewer Rainwater Systems per drain For each sewer connection For each private sewage disposal system For each sewer cap For each water heater and/or vent $12.00 5.00 34.50 23.00 5.00 5.00 DESCRIPTION For each gas piping system of one 1) to five 5) 5.00 outlets For each gas piping system of six 6) or more, per 1.15 outlet For each industrial waste pre-treatment 12.00 interceptor, including its trap and vent/ excepting kitchen-type grease interceptors functioning as fixture traps For installation, alteration or repair of water 7.00 piping and/or water treating equipment For repair or alteration of drainage or venting 5.00 piping For each lawn sprinkler system on any one meter 5.00 including backflow protection devices therefor For vacuum breakers or backflow protective 12,00 devices on tanks, vats/ etc,/ or for installa- tion on unprotected plumbing fixtures including necessary water piping one to five Over five, each 1.15 Plumbing Reinspection Fee $34.50 Uniform Mechanical Code Heating appliance 9.50 Relocate or replace vent 5.00 Contort Cooling Under 10,000 BTU 7.00 Over 10/000 BTU 12.00 Compressor or boiler Under 3 H.P. 9.20 Over 3 H.P. to 15 H.P. 17.25 Over 15 H.P. to 50 H.P. 12.00 Over 30 H.P. to 50 H.P. 34.50 Over 50 H.P. 57.50 Gas System 4.00 Vent Fan 5.00 Hoods 7.00 Miscellaneous 7.00 Permit Fee 7.00 Reinspection Fee 34.50 Uniform Swimming Pool Code Fees per Building Permit Fees Electrical Code 30.1 Fees New Construction and Additions Permit issuance fee $11.50 + fee for each scheduled in Section 30.4 + $.035 per ampere for each service switch 600 volts or less; $.16 per ampere for each service switch in excess of 600 volts. In addition the following fees shall apply to each type of construction: a. Gasoline service station buildings $0.10/3.F. b. Drinking or dining establishments 10/S.F. c. Power plants pumping plants 10/S.F. BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷HResolution No. 87-50 Page 12 a* Woodworking establishments, planning mills b. Steel mills, factories c. Manufacturing plants, assembly plants d. Gasoline service station open canopies e. Repair garages, aircraft repair hangar f. Ice plants, cold storage plants g. Creameries, bakeries, food processing plants h. Hotel, motel, apartment houses, lodging houses i. Dwellings j. Dry cleaning DESCRIPTION a. Office building b. Stores, markets wholesale or retail) c. Hospitals, sanitariums, convalescent hospital d. Nursing homes, child nurseries e. Schools f. Churches, assembly buildings g. Amusement park structures h. Any occupancy not listed 05/S.F. 05/S.F. 05/S.F. 05/S.F. 05/S.F. 05/S.F. 05/S.F. 05/S.F. 05/S.F. 05/S.F. $0.03/S.F. 03/S.F. 03/S.F. 03/S.F. 03/S.F. 03/S.F. 03/S.F. 03/S.F. a. Residential accessory building, attached or detached, such as private garages, carports, sheds, etc. b. Hotel, motel, and commercial parking, garages and carports c. Warehouses up to and including 5,000 sq. ft. a. Warehouses that part which is over 5,000 sq. ft. b. Storage garages where no repair work is done c. Aircraft hangars where no repair work is done 30.2 Alterations and Additions. Where no structural work is being done, or where it is impractical to use the square footage schedule 30.3 Minimum Total Fee. For any type of construction or installation 30.4 Fees. For fixed motors, transformers, generators, heating and cooking appliances, etc. Coverting all units to H.P. horse power), K.W. Kilowatt), K.V.A. Kilovolt ampere) fees shall be determined as follows: Up 1, not over 5 Over 1, not over 5 Over 5, not over 20 Over 20, not over 50 Over 50, not over 100 Over 100, not over 500 Over 500, not over 1000 Over 1000, not over..... 02/S.F. 02/S.F 02/S.F 15/S.F 15/S.F 15/S.F Use Fee Schedule 3 $12.00 minimum $4.00 7.00 9.20 14.00 18.40 27.60 41.40 57.50 30.5 a) Lighting Standards Not over 3 on a site Each additional over 3 on a site Lampholding devices, not a part of a lighting standard Festoon type) Not over 50 Over 50, not over 100 Over 100 7.00 2.00 $ 9.20 18.40 27.60 BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷HResolution No. 87-50 Page 13 30.6 Signs and Outline Lighting One sign and gas tube system 7.00 Each additional sign or gas tube system 5.00 Each transformer or ballast 2,00 Each motor or flasher 2.00 Each lampholding device in connection with a sign; from 1 to 20 inclusive, each 20 next 100 each 10 each additional 06 30.7 Temporary, Permanent or Construction Poles Temporary, underground and work-with services: Temporary underground service $23.00 Temporary work-with service residential) 13.00 Temporary work-with service commercial) 23.00 30.8 Miscellaneous Any electrical work for which a permit is 12.00 required, but no fee is herein provided 30.9 Annual Maintenance Electrician Fee for each annual Maintenance Electrician Permit. Fees for all work installed under such permit since date of last previous inspection shall be paid according to the above schedule at the time the annual permit is issued. Where plans are required and the service is over 400 amps, a plan check fee equal to 50% of the permit fee shall be paid at the time plans are submitted. Uniform Sign Code Fees Fees per Building Permit Fees House Moving Permit filing and processing fee Mileage fee for out of town inspection Subdivision Maps Filing and processing fee $ 30.00 35/per mile $150.00 + 10.00 per parcel Parcel Maps Filing and processing fee Boundary Line Adjustments Filing and processing fee Environmental Impact Preparation of the Assessment for Environmental Impact $100.00 + 10.00 per parcel 25.00 per map 75.00 for the first parce plus $25.00 for each additional parcel or $200.00 per acre, whichever is greater. Fee shall not exceed $500.00 BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 1987 050 CC RESO(Ìì÷HResolution No. 87-50 Page 13 30.6 Signs and Outline Lighting One sign and gas tube system 7 00 Each additional sign or gas tube system 5 00 Each transformer or ballast 2 00 Each motor or flasher 2 00 Each lampholding device in connection with 4 a sign; from 1 to 20 inclusive} each 20 next 100 each 10 each additional 06 30.7 Temporary, Permanent or Construction Poles Temporary, underground and vork-vith services: Temporary underground service $23.00 Temporary work-with service residential) 13.00 Temporary work-with service commercial) 23.00 30.8 Miscellaneous Any electrical work for which a permit is 12.00 required, but no fee is herein provided 30.9 Annual Maintenance Electricietn Fee for each annual Maintenance Electrician Permit. Fees for all work installed under such permit since date of last previous inspection shall be paid according to the above schedule at the time the annual permit is issued. Where plans are required and the service is over 400 amps, a plan check fee equal to 50% of the permit fee shall be paid at the time plans are submitted. Uniform Sign Code Fees Fees per Building Permit Fees House Moving Permit filing and processing fee Mileage fee for out of town inspection $ 30.00 35/per mile BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04 Resolution No. 87-50 Page 10 Rl, R3 & M Occupancies Valuation 85,000 86,000 87/000 88,000 89/000 90/000 91,000 92,000 93,000 94/000 95,000 96,000 97/000 98,000 99,000 *100,000 Plan Check 311.76 314.44 317.12 319.80 322.48 325.16 327.85 330.53 333.31 335.89 338.57 341.25 343.45 346.61 349.30 351.98 Bidg Permit 479. 483. 487. 492. 496. 500. 504. 508. 512. 516. 520. 525. 528. 533. 537. 541. 63 75 88 00 13 25 38 50 63 75 88 00 38 25 38 50 Note: When identical plans are submitted for more than one Group I and J Occupancy/ in the same development/ Plan Check Fees shall be one half the permit fee for the first building and one fourth the permit fee for all additional buildings. For the purpose of this section, identical shall mean, buildings of the same size and having floor plans of the same configuration *$542.00 of the first $100,000 + $5.00 for each additional $1/000, or fraction thereof. **Plan Checking Fees: A plan check fee shall be paid at the time plans are submitted: Plan check fee shall be 65% of the permit fee. EXCEPTION: No plan check fee will be charged for reroofing or air conditioning when plans are not required. Building Permits Reinspection Fee Certificate of Occupancy-Original Certificate of Occupancy-Subsequent Building Permits Reinspection Fee Certificate of Occupancy-Original Certificate of Occupancy-Subsequent Certificate of Occupancy-Temporary Building Regulations Variance Filing and Processing Fee Energy Conservation Regulation Plan Check and permit fee $34.50 No Charge 34.50 $34.50 No Charge 34.50 57.50 $57.50 20% of total of building permit and plan check fee Uniform Plumbing Code For issuing each permit In addition For each plumbing fixture or trap or set of fixtures on one trap including water, drainage piping and backflow protection thereof) $7.00 $5.00 BIB] 37845-U01 1987-U02 050-U02 CC-U02 RESO-U02 LI3-U03 FO2126-U03 FO20370-U03 DO20514-U03 C6-U03 RESO-U03 8/12/2003-U04 ROBIN-U04