Loading...
HomeMy WebLinkAbout1994 036 CC RESO1994 036 CC RESO(Ìì¹ RESOLUTION NO.94-36 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK AMENDING RESOLUTION NO. 93-6 AND RESOLUTION NO.93-7 SETTING FEES AND CHARGES FOR ISSUANCE, PROCESSING AND FILING OF VARIOUS SERVICES AND PERMITS Related TO HUMAN SERVICES, AND PUBLIC WORKS SERVICES THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES RESOLVE AS FOLLOWS: SECTION 1. That the cost of issuing, processing and filing various city services and permits shall be in accordance with the attached Chart of Fees and Charges, marked Exhibit A" and B." SECTION 2. That Resolution No.93-6 and Resolution No.93-7 and all amendments thereto, in conflict herewith are hereby rescinded. SECTION 3. That said Chart of Fees and Charges shall become effective immediately except for the Monument Inspection which will become effective sixty 60) days from adoption of this resolution. SECTION 4. That the City Clerk shall certify as to the adoption of this Resolution and shall cause the same to become processed in the manner required by law. APPROVED AND ADOPTED this April 20, 1994. Z BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ FEE SCHEDULE INDEX GENERAL FEES................................PAGES 1-2 COMMUNITY CENTER/RECREATION.................PAGE 3 ENGINEERING.................................PAGES 4-8 PLANNING....................................PAGE 9 BUILDING....................................PAGES 10-13 POLICE ATTACHMENTS..........................FINAL PAGES BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ CITY OF BALDWIN PARK EXHIBIT A" SCHEDULE OF FEES AND CHARGES RESOLUTION NO. 94-36 DESCRIPTION Special Services Municipal Code Complete $75.00 Municipal Code Addendum Subscription 20.00 Zoning Code Complete COST TO Zoning Code Addendum Subscription DUPLICATE} City Budget Preliminary or Final 20.00 Fingerprints 10.00/set Applicant supplies card and forwards to DOJ for clearance) Fingerprints 10.00 set + Department takes prints and forwards State Fee to DOJ for clearance) Administrative Fee 9.00/set Entertainment Permit Initial 250.00 Entertainment Permit Renewal 175.00 Photographs 4x5 Contract 2.00 each Photographs 5x7 Enlargement 3.50 each Photographs 8x10 Enlargement 4.50 each Gun Permits $10.00 forwarded to State 13.00 each per P.C. 12054) Police Reports 15.00 Police Background Investigations Civil 15.00/hour Impound/Stored Vehicles Release of 40.00 Business Alarm Permits Initial Hookup 25.00 Strong Motion Instrumentation Fee 0.007% % of construction cost) Building Plan Records Letter size 0.10/sheet Other size 0.35/sheet Governmental Reports 1st sheet) 1.00 of series) each add'l 15 Agenda Packet 25.00 each General Plan only) 55.00 OR COST TO DUPLICATE) Zoning Map 8.00 General Plan Map 5.00 Appeals Filing and processing fee 50.00 each Zoning and Subdivision Appeals 300.00 each Public Nuisances Abatement costs exceeds 50.00 each $1,000 Including Map Abatement cost less than 10.00 each $1,000 Fireworks Permit and processing fee No Charge Compliance Deposit & Inspections Fee 50.00 non-refundable Liability Insurance As Required Returned Checks NSF and etc. 25.00 Bicycle License Annual To be set by State of California) Animal Control Dog License Set by Los Angeles County BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ PAGE TWO Parade and Demonstration Permit filing and processing fee $25.00 each Refuse Collection and Disposal Franchise Fee 10% of gross collected by 10th each month as of Jan, 1980) Single Family units 10.01/month Multiple Family per unit 10. 01/month/ 1st unit plus REFUSE FEES SET BY A RESOLUTION OF THE 6.90 each add'l CITY COUNCIL ANNUALLY" unit Temporary Waste Bins Public Right-of-Way $20.00 ea two Only) Barricades & week period reflective tape) Non-Exclusive Franchise Fee- Commercial 750.00 and Industrial Business License Transfer to new location 25.00 each Duplicate, lost or destroyed 5.00 each Bankruptcy, Fire and Close-out Sales Filing and processing fee 30 day 50.00 each Filing and processing fee 60 day 100.00 each Filing and processing fee 90 day 150.00 each Bingo Permits 50.00/year Dances Permit filing and processing fee 50.00 each Safety Services 15.00/hour each Handbills Permit filing and processing fee 50.00/per Massage Parlors Permit filing and processing fee 250.00 each New employee checks 25.00 each Taxicabs Certificate of Convenience nad Necessity 500.00 Annual Renewal of Certificate 350.00 Liability Insurance As required Changes in vehicles, drivers, etc. Temporary Use Permits Filing and investigation fee 115.00 Street Benches Permit filing and processing fee 10.00/bench/year Bench removals by City 25.00 each Bench storage by City max. 60 days 10.00/week/each Street Banners Permit filing and processing fee 50.00 each Yard Sales 5.00 ea. BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ PAGE THREE COMMUNITY CENTER/RECREATION Park Facilities and Recreation Activities Building Fees Fees/per hour/rate) Less than 100 More than 100 Res. Non-Res. Res. Non-Res. Assembly Hall $10.00 $15.00 $15.00 $20.00 Meeting Room/Craft Room 7.00 12.50 Kitchen/serving Equipment 7.50 15.00 15.00 25.00 Kitchen Deposit 50.00 flat per day TV/VCR & P.A. System 25.00 flat per day Slide Projector & Screen 15.00 flat per day Tablecloth 2.50 per Coffee 10.00 50 or less 15.00 50 or more Tables Deposit 50.00 flat Per table 2.00 Per chair 25 Gymnasium 25.00 35.00 50.00 75.00 Pool Fees Rental Residential) $80. 00/1-99/2hrs./1 guard $160. 00/100-199/2hrs./2guards RESIDENTS NON-RESIDENTS Admissions, Youth 0-17 25 1.00 Admissions, Adults 18-54) 50 1.50 Admissions, Sr. Citizens 55 and Older) Free 50 Swim Classes, Resident Youth Registration 5.00 each Swim Classes, Resident Adult Registration 10.00 each Swim Classes, Non-Resident-Youth Registration 20.00 each Swim Classes, Non-Resident-Adult Registration 25.00 each Recreational Activities Classes, residents Youth 5.00 each Classes, resident Adult 7.50 each Classes, non-resident Youth 20.00 each Classes, non-resident Adult 25.00 each Non-Resident Application In Addition to Use Charges) Processing Fee 10.00 Special Facilities 10.00/hour Facilities not scheduled to be open 7.50/hour Sports Field Resident 25.00/hour Non-Resident 35.00/hour Lighting Sports Lighting-maximum 2 1/2 hours 16.00/game 8.00 per team BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ ENGINEERING FEES PAGE FOUR Encroachment, Moving and Load Regulations Permit filing and processing fee for 15.00 each Moving Load or Vehicle over width, height or weight per occurrence Encroachments Gunite Storage 25.00 each Gunite Cleanup-Deposit returnable) 20.00 each Overhead Structures 300.00 each The fee for other encroachment permits not listed will be determined by the Director of Public Works Pavement Restoration Utility Cuts 4.00/S.F. $3.70/S.F. Refundable if work performed by permitee) Engineering Fees Expedite Map/Plan Check 1 1/2 Times the Fee For items not covered in the Fee Schedule a minimum of one 1) hour will be charged at the minimum hourly rate of $50.00 Subdivision Filing and Plan Check Fee Tentative Parcel Map 1500.00 Tenative Tract Map 2000.00 First 10 Lots or Units) + 45.00/Lot or Unit Lots or Units 11-25) + 25.00/Lot or Unit Lots or Units 26-50) Parcel Map final map) 2400.00 + $60/Parcel Tract Map final map) 2400.00 + $60/Lot Easement Deed* 450.00 Easement Checking* 400.00 Monument Inspection 425.00 each Parcel Map 800.00 each Tract Map Verification that City Map is consistant with conditions of tentative approval 300.00 Verification that City Grant of Waiver and Certificate of Compliance are consistant with conditions of tentative approval 300.00 Agreement and/or Improvement Security 300.00 each Extension of time for Improvement Agreement 250.00 per letter Fourth Submittal of originals and/or prints 450.00 Sixth Submittal of originals and/or prints 1250.00 Eighth Submittal of originals and/or prints and each subsequent submittal 1500.00 Extension of time for final map for six months 250.00 for one year 500.00 Recordation fees: First sheet $6.00 Second sheet and all subsequent sheets 2.00 each Certificate of Compliance* 1000.00 Street Vacation* 1000.00 Covenant and Agreement* 600.00 Lot Line Adjustment 1500.00 Miscellaneous Documents 600.00 *The fee for these items includes only the review of the legal description and the research associated with the particular case. However, if the City provides the legal description add $150 to the fee indicated. BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ PAGE FIVE ENGINEERING FEES CON'T) Improvement Plans A fee shall be charged at the time of plan submittal in the amount set forth below. 1. Plan Check: Improvement Valuation Fee $ 0 999 $150.00 $ 1,000 9,999 $150 +11% x Valuation 1,000) $ 10,000 49,999 $1,140 + 8% x Valuation 10,000) $ 50,000 99,999 $4,340 + 4% x Valuation 50,000) $ 100,000 999,999 $6,340 + 2% x Valuation 100,000) $ 1,000,000 and over $24,340 + 1.5% x Valuation 1,000,000) 2. Inspection: Inspection fee shall be 100% of the plan check fee. Drainage Plans One lot 1) to three 3) lots 120.00 Four 4) lots or more 500.00 GRADING AND EXCAVATION Vol. in CY or Exceeding Plan Check Yardage Base Amount Fraction of CY of 50 to 100 CY $ 140 Minimum 101 to 1,000 CY $ 140+ 60 per 100 100 1,001 to 10,000 CY $ 700+ 70 per 1,000 1,000 10,001 to 100,000 CY $ 1,330+ 80 per 10,000 10,000 Over 100,000 CY $ 2,050+ 50 per 10,000 10,000 Inspection/ Permit Issuance Vol. in CY or Exceeding Yardage Base Amount Fraction CY of 50 to 100 CY $ 280 Minimum 101 to 1,000 CY $ 280+ 70 per 100 100 1,000 to 10,000 CY $ 910+ 100 per 1,000 1,000 10,000 to 100,000 CY $ 1,810+ 200 per 10,000 10,000 Over 100,000 CY $ 3,610+ 100 per 10,000 100,000 Fourth Submittal and each subsequent 25% of submittal for grading, drainage and original plan improvement plan checks check fee Reproduction Costs Blueline prints 24"x18") $5.00/First & Blueline prints 24"x36") $3.00/each Sepia any size) additional Final Map Blueline print) Copy 8 1/2" x 11" or) 8 1/2" x 14" 25 each Materials Purchase Plain Mylar 24"x36") 5.00 each Plan & Profile Mylar 24"x36") 6.00 each Sewer Connection Permit Fee Residential $ 50/per dwelling unit $ 20/dwelling unit if more then 10 unit BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ PAGE SIX ENGINEERING FEES CON'T) Commercial & Industrial $100 per unit 50 per unit if more than 10 units Sewer Connection Permit Fee Continued Rectangular lot depth, 100 ft. or less 8.00/foot Rectangular lot depth, more than 100 ft. 8.00/foot + 0.01/S.F. over 100 feet of depth Irregular lot, frontage 60 ft. or less 8.00/foot or 0.08/S.F. for the first 6000 S.F., whichever is greater, + 0.01/S.F. for all areas in excess of 6000 S.F. Irregular lot, frontage greater than 60 feet 8.00/foot + 0.01/S.F. for all areas in excess of 6000 S.F. Each existing lateral utilized by property 175.00 owner(s) Public Works Permit Note: Permit fees are computed at 5% of the total valuation of the work to be done under the permit. The unit costs listed shall be used in calculating the total work valuation as appropriate. In no event shall the minimum permit fee be less than $100.00. The cost of removals shall be calculated at 60% of the construction cost. Curb only 10. 00/L.F. Roll Curb 12. 00/L.F. Cross Gutter 16. 00/L.F. Curb and Gutter 16. 00/L.F. Parkway Landscaping 2.00/S.F. Sidewalk 4" P.C.c.) 3.50/S.F. Drive Approach 6" F.C.C.) 4.50/S.F. Crushed Aggregate Base 1.25/S.F. Asphalt Pavement: 4" thick 1.50/S.F. 4" thick 2.50/S.F. Wheelchair Ramp 4" P.C.C.) 450.00 each Sewer Installation: 12"0 V.C.P. 55. 00/L.F. 8"O V.C.P. 50.00/L.F. 6"O V.C.P. 45. 00/L.F. Manhole 2000.00 each Sewer Saddle 200.00 each Dye Test permittee to provide dye) 50.00 each BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ ENGINEERING FEES CON'T) PAGE SEVEN UTILITY PERMITS Issuance and Trench Length Plan Check Fee Inspection Fee Up to 50' Mm. $25 *Min. $75 City does A.C.) Mm. $100 Util. does A.C. when directed 51' to 250' $25+ $.25/LF 50' $100+ $.50/LF 50' 251' to 1000' $50+ $.15/LF 250' $200+ $.40/LF 250' Over 1000' $165+ $.05/LF 1000' $400+ $.30/LF 1000' *Up to 200 S.F. add additional $6.00/S.F. for paving to be performed by the City. City to perform the paving unless otherwise directed by the Director of Public Works. Note: Fees applicable to work performed by both open trench and/or boring methods of installation. Issuance and Non-Trench Work Plan Check Fee Inspection Fee Up to 100 SF Mm $25 *Min. $75 City does A.C.) Mm. $125 Util. does A.C. when directed) Over 100 SF $25+ $.30/SF 100 SF $125+ $1.00/SF> 100 SF Storm Drain Construction of a new catch basin 3500.00 each C.B., transition structure, or manhole N.H. Modification of the existing 2500.00 each C.B. or N.H. Drain pipe/roof drain 20. 00/L.F. Parkway drain 600.00 each Storm drain mainline RCP) 130.00/L.F. Storm drain lateral RCP) 90. 00/L.F. Traffic Striping or lane line marking 0.15/L.F. Lettering/arrow 15.00 each Street name signs 2) & post 250.00 each Traffic regulatory sign 170.00 each Traffic signal 2 to 4 phase) $70,000.00 Traffic signal 5 to 8 phase) 90,000.00 Traffic signal modification 15,000.00 Street Light 2,000.00 each Street Tree Installation 175.00 each Reinspection Fee 3rd and each subsequent inspection) 65.00 Site Review Plans for Room Addition 25.00 more than $10,000 Street Name Change Application fees 1,000.00 Cost of signs upon approval of street name change will be determined by the Director of Public Works. BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹  PAGE EIGHT ENGINEERING FEES CON'T) TEMPORARY USE PUBLIC WORKS PERMIT FEES INCLUDES UTILITIES Lane Closure No Street Cuts Per Occurrence 100.00 Monthly Permit 350.00 Annual Permit 31000.00 Approved Road Closure 500/day If public convenience dictates All utility permits for excavation or street cuts in the City's right-of- way or in the City's future right-of-way as determined by the City's General Plan shall be issued to utility companies. PENALTY WORK COMMENCED PRIOR If any work is commenced on public right-of-way without a permit, the Permitee must obtain an after-the-fact permit. If it is determined that the work was an emergency in nature and it is approved by the Director of Public Works then the after-the-fact permit fee will be charged as a regular permit fee. After-The-Fact Permit Issuance Double the Total Fees BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹  PAGE NINE PLANNING FEES Planning Fees Minor Variances 500.00 Zone Variance or Conditional Use Permit 1,000.00 Zone Variance Single Family Single Lot) 25.00 Amendment to the Zoning Code or 2,500.00 the General Plan Zone Change only 1,800.00 Development Agreement Actual costs incurred by Staff Development Plan 1,500.00 Environmental Review: Categorical Exemption 60.00 Negative Declaration 180.00* Environmental Impact Report review only) 70.00/hr.* Environmental Impact Report preparation) Actual costs incurred Combined public hearings 100% of highest and 50% of any additional *Plus any reasonable expenses for staff or consultant services. Zoning Map copy 8.00 each General Plan Map copy 8.00 each Appeals, Zoning 300.00 To Planning Commission or City Council) Appeals, Tentative Maps 300.00 Time Extension 400.00 Sign Permit 50.00 Plan Review/Design Review Commercial, Industrial or Maximum Office, New Commercial Office Construction Residential or Industrial Remodel Square feet Dwelling Units Value FEE 1 1,000 $ 100,000 $ 200.00 1,001 3,000 2-4 200,000 325.00 3,001 6,000 5-6 400,000 475.00 6,001 10,000 7-10 700,000 625.00 10,000 15,000 11-15 1,000,000 900.00 15,001 20,000 16-20 1,500,000 1,100.00 Over 20,001 27,000 21-25 1,500,000 1,300.00 27,001 35,000 26-35 1,500.00 35,001 45,000 36-45 1,750.00 45,001 60,000 46-60 2,000.00 60,001 100,000 61-100 2,300.00 100,001 150,000 101-150 2,600.00 Over 150,000 Over 150 3,000.00 **The initial plan review/design fee shall cover initial review of the plans plus review of up to two revised plans. Further review shall be charged at 33.3 percent of the base fee rounded to the nearest $5.00) for each revision. Publications Zoning Code Complete AT Zoning Code Addendum Subscription DUPLICATION General Plan only) COST BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ 1994 036 CC RESO(Ìì¹  PAGE ELEVEN BUILDING FEES CON'T) For each lawn sprinkler system on any one meter 12.00 including backflow protection devices therefor For vacuum breakers or backflow protective 15.00 devices on tanks, vats etc., or for installa- tion on unprotected plumbing fixtures including necessary water piping one to five Over five, each 3.00 Plumbing Reinspection Fee $65.00 Uniform Mechanical Code Heating appliance 15.00 Relocate or replace vent 12.00 Confort Cooling Under 10,000 BTU 15.00 Over 10,000 BTU 20.00 Compressor or boiler Under 3 H.P. 15.00 Over 3 H.P. to 15 H.P. 18.00 Over 15 H.P. to 30 H.P. 35.00 Over 30 H.P. to 50 H.P. 62.00 Over 50 H.P. 95.00 Gas System 12.00 Vent Fan 15.00 Hoods 15.00 Miscellaneous 15.00 Permit Fee 28.00 Reinspection Fee 65.00 Uniform Swimming Pool Code Fees per Building Permit Fees Electrical Code 30.1 Fees New Construction and Additions Permit issuance fee $28.00 + fee for each scheduled in Section 30.4 + $.05 per ampere for each service switch 600 volts or less; $.20 per ampere for each service switch in excess of 600 volts. In addition the following fees shall apply to each type of construction: a. Gasoline service station buildings $0.15/S.F. b. Drinking or dining establishments 15/S.F. c. Power plants pumping plants 15/S.F. a. Woodworking establishments, planning mills 07/S.F. b. Steel mills, factories 07/S.F. C. Manufacturing plants, assembly plants 07/S.F. a. Gasoline service station open canopies 07/S.F. e. Repair garages, aircraft repair hangar 07/S.F. f. Ice plants, cold storage plants 07/S.F. g. Creameries, bakeries, food processing plants 07/S.F. h. Hotel, motel, apartment houses, lodging houses 07/S.F. 1. Dwellings 07/S.F. j. Dry cleaning 07/S.F. DESCRIPTION a. Office building $0.05/S.F. b. Stores, markets wholesale or retail) 05/S.F. c. Hospitals, sanitariums, convalescent hospital 05/S.F. d. Nursing homes, child nurseries 05/S.F. e. Schools 05/S.F. f. Churches, assembly buildings 05/S.F. g. Amusement park structures 05/S.F. h. Any occupancy not listed 05/S.F. a. Residential accessory building, attached or 03/S.F. detached, such as private garages, carports, sheds, etc. BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ PAGE TWELVE BUILDING FEES CON'T) b. Hotel, motel, and commercial parking, garages 03/S.F and carports C. Warehouses up to and including 5,000 sq. ft. 03/S.F a. Warehouses that part which is over 5,000 sq. ft. 02/S.F b. Storage garages where no repair work is done 02/S.F c. Aircraft hangars where no repair work is done 02/S.F 30.2 Alterations and Additions. Where no structural $5.00 work is being done, or where it is impractical per to use the square footage schedule. circuit 30.3 Minimum Total Fee. For any type of construction $15.00 or installation minimum 30.4 Fees. For fixed motors, transformers, generators, heating and cooking appliances, etc. Converting all units to H.P. horse power), K.W. Kilowatt), K.V.A. Kilovolt ampere) fees shall be determined as follows: 1 $ 6.00 Over 1, not over 5 9.00 Over 5, not over 20 11.00 Over 20, not over 50 17.00 Over 50, not over 100 21.00 Over 100, not over 500 32.00 Over 500, not over 1000 45.00 Over 1000, not over................................62.00 30.5 a) Lighting Standards Less than 3 on a site 10.00 Each additional over 3 on a site 3.00 Lampholding devices, not a part of a lighting standard Festoon type) Not over 50 12.00 Over 50, not over 100 22.00 Over 100 32.00 30.6 Signs and Outline Lighting One sign and gas tube system 10.00 Each additional sign or gas tube system 7.00 Each transformer or ballast 3.00 Each motor or flasher 3.00 Each lampholding device in connection with a sign; from 1 to 20 inclusive, each 30 next 100 each 15 each additional 08 30.7 Temporary, Permanent or Construction Poles Temporary, underground and work-with services: Temporary underground service $26.00 Temporary work-with service residential) 16.00 Temporary work-with service commercial) 28.00 30.8 Miscellaneous Any electrical work for which a permit is 15.00 required, but no fee is herein provided 30.9 Annual Maintenance Electrician Fee for each annual Maintenance Electrician Permit. Fees for all work installed under such permit since date of last previous inspection shall be paid according to the above schedule at the time the annual permit is issued. Where plans are required and the service is over 400 amps, a plan check fee equal to 50% of the permit fee shall be paid at the time plans are submitted. BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ PAGE THIRTEEN BUILDING FEES CON'T) Uniform Sign Code Fees Fees per Building Permit Fees BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ POLICE ATTACHMENT II Processing Time by Section Processing Time by Patrol Officer: 40 minutes Steps involved in handling CHP 180: Request registration/stolen information via radio Inventory vehicle/complete CHP 180 report Deliver report to police station Log report into report ledger Attach computer printout to report Processing time in Communications: 4 minutes Steps involved in handling CHP 180: Run a registration/stolen check Relay registration information to field officer Complete log card Telephone tow agency Complete tow ledger Processing Time by Watch Supervisor Sgt.): 5 minutes Steps involved in handling CHP 180: Review report for accuracy/completeness Log report as approved" in report ledger Assist Records/approve release of vehicle Processing Time in Records Section: 46 minutes Steps involved in handling CHP 180: Processing 5 minutes Accepting report and pull case folder Run 28/29 to verify information Notification 10 minutes Complete notification form and mail to RIO, L/O and storage company File with case Entry of report 10 minutes Enter case and R/O into computer system Release 10 minutes Check JDIC or case ledger for case number verify R/O information and license status Get detective approval for release if not indicated by patrol Complete form for R/O signature Make copy of release for R/O to present to storage company Directions to storage company Refile report Paperwork not current 3 minutes Send new R/O to DMV for registration update Send R/O to DMV to pay expired registration upon return perform Release" again BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05 1994 036 CC RESO(Ìì¹ATTACHMENT II CON'T) Phone contact 5 minutes Obtain license number from R/O Check JDIC or case ledger for case number Pull case and determine cause of storage Call OSJ agency if a recovered vehicle for OK to release Tell R/O what is necessary to obtain release Refile case Notice of impound returned 3 minutes Pull case to determine if vehicle has been released Mark notification form of non-release and send copy to DOJ Attach returned envelope to original storage form Refile case POLICE ATTACHMENT III Compensation Rates Position Hourly) * Rate ** Benefits Total Police Officer $15.93 $ 8.44 $24.37 Dispatcher 11.30 3.96 15.26 Police sergeant 19.38 10.27 29.65 Records Clerk 9.36 3.28 12.64 * 3rd step employee ** sworn at 53%/non-sworn at 35% Time and Motion Rates Position Time Pay Rate Cost Police Officer 40 mm. $24.37 $16.40 Dispatcher 4 mm. 15.26 1.00 Police Sergeant 5 mm. 29.65 2.45 Records Clerk 46 mm. 12.64 9.66 Total Cost $29.51 BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05  PAGE TEN BUILDING FEES Building Fees AEIHB & B4 Occupancies*) 1. Permit Fee: Valuation Fees See BUILDING ATTACHMENT I) 2. Plan Check Fees: * Plan check fee is 85% of the building permit fee, with a minimum of $82.00. * Handicapped plan check fee is 5% of the building permit fee. * Plan check fees will not be charged for reroofing or air conditioning when plans are not required. * For RI, R3 & M Occupancies, use 80% of the fees tabled above. Building Permits Reinspection Fee 65.00 Certificate of Occupancy-Original No Charge Certificate of Occupancy-Subsequent 40.00 Certificate of Occupancy-Temporary 57.50 Request for Address Change 750.00 Building Regulations Variance Filing and Processing Fee 65.00 Energy Conservation Regulation Plan Check and permit fee 20% of total of building permit and plan check fee Uniform Plumbing Code For issuing each permit 28.00 In addition For each plumbing fixture or trap or set of 12.00 fixtures on one trap including water, drainage piping and backflow protection thereof) For each building sewer and each trailer park 15.00 sewer Rainwater Systems per drain 12.00 For each sewer connection 40.00 For each private sewage disposal system 30.00 For each sewer cap 12.00 For each water heater and/or vent 12.00 DESCRIPTION For each gas piping system of one 1) to five 5) 12.00 outlets For each gas piping system of six 6) or More, per 3.00 outlet For each industrial waste pre-treatment 15.00 interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps For installation, alteration or repair of water 15.00 piping and/or water treating equipment For repair or alteration of drainage or venting 12.00 piping BIB] 37650-U01 1994-U02 036-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1577-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-36-U05 APR-U05 20-U05 1994-U05