Loading...
HomeMy WebLinkAbout1994 057 CC RESO1994 057 CC RESO(Ìì¸þ RESOLUTION NO. 94- 57 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK, CALIFORNIA APPROVING THE ENGINEER' S REPORT FOR CERTAIN LANDSCAPING AND LIGHTING MAINTENANCE IN A LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT IN THE CITY OF BALDWIN PARK WHEREAS, pursuant to the Provisions of Division 15, Part 2, of the Streets and Highways Code of the State of California, being known as the Landscaping and Lighting Act of 1972" an Engineer's Report has been prepared consisting of Plans and Specifications, an Estimate of the Cost" a Diagram of the Maintenance District, and as Assessment relating to what is now know and designated as CITY OF BALDWIN PARK CITYWIDE LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT hereinafter referred to as the District")' and WHEREAS, there now has been presented to this City Council the Report as required by Division 15 of the Streets and Highways Code and as previously directed by Resolution; and WHEREAS, this City Council has now carefully examined and reviewed the Report as presented, and is satisfied with each and all of the items and documents as set forth therein and is satisfied that the assessments, on a preliminary basis, have been spread in accordance with the benefits received from the maintenance to be performed as set forth in said Report. NOW, THEREFORE IT IS HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF BALDWIN PARK, CALIFORNIA, as follows: SECTION 1. That the above recitals are all true and correct. SECTION 2. That the Report as presented, consisting of the following: a. Plans and Specifications; b. Estimate of the Cost; c. Diagram of the Maintenance District; d. Assessment of the Estimated Cost; is hereby approved on a preliminary basis, and is ordered to be filed in the office of the Director of Public Works as a permanent record and to remain open for public inspection. SECTION 3. That the City Clerk shall certify to the passage and adoption of the Resolution and the Minutes of this meeting shall so reflect the presentation of the Engineer's Report. APPROVED AND ADOPTED on June 1, 1994. MAYOR Z:L.IR,CI4CLERK BIB] 37650-U01 1994-U02 057-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1553-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-57-U05 JUN-U05 1-U05 1994-U05 1994 057 CC RESO(Ìì¸þ Resolution No. 94-57 Page Two STATE OF CALIFORNIA COUNTY OF LOS ANGELES SS: CITY OF BALDWIN PARK I, LINDA L. GAIR, City Clerk of the City of Baldwin Park, do hereby certify that the foregoing Resolution was duly and regularly approved and adopted by the City Council of the City of Baldwin Park at its regular meeting of the City Council on June 1, 1994 by the following vote: AYES: COUNCILMEMBERS GALLEGOS LOWES,MUSE,MAYOR PRO TEM MARTINEZ NOES: COUNCILMEMBERS NONE ABSENT: COUNCILMEMBERS MAYOR VARGAS ABSTAIN: COUNCILMEMBERS NONE CITY CLERK BIB] 37650-U01 1994-U02 057-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1553-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-57-U05 JUN-U05 1-U05 1994-U05 1994 057 CC RESO(Ìì¸þ ENGINEER'S REPORT FOR THE CITYWIDE LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT IN THE CITY OF BALDWIN PARK FISCAL YEAR 1994-1995) June 1, 1994 Sid Jalal Mousavi Director of Public Works DEPARTMENT OF PUBLIC WORKS BIB] 37650-U01 1994-U02 057-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1553-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-57-U05 JUN-U05 1-U05 1994-U05 1994 057 CC RESO(Ìì¸þ A CITY OF BALDWIN PARK ENGINEER'S REPORT FOR THE CITYWIDE LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT FISCAL YEAR 1994-95) SECTION I AUTHORITY FOR REPORT This report is prepared pursuant to the requirements of Article 4, Chapter 1, Landscaping and Lighting Act of 1972, being Part 2, Division 15, of the Streets and Highways Code. The report covers the period from July 1, 1994.through June 30, 1995. SECTION II PLANS The plans showing size and location of street lights are incorporated herein by reference. Plans showing the general location of landscaping to be maintained are incorporated herein by reference. All of the above mentioned items are on file in the office of the City Engineer. SECTION III SPECIFICATIONS FOR MAINTENANCE The Lighting system shall be maintained to provide adequate illumination. Maintenance shall include but not be limited to removal, repair, replacement or relocation of light standards, poles, bulbs, fixtures, circuits and all appurtenances. The traffic signal system shall be maintained for proper operation. Maintenance shall include but not be limited to removal, repair, replacement or relocation of traffic signal poles, mast-arms, controllers, cabinets, conduit, conductor, bulbs and all appurtenances. Power for lights and traffic signals shall be furnished by the Southern California Edison Company or its successors and it shall be adequate for the intended purpose. Rates for power shall be those authorized by the Public Utilities Commission, State of California. Landscaping maintenance shall consist of installing, cutting, pruning, trimming, fertilizing and treating plants, shrubs, trees, ground cover and soil to provide a pleasing and attractive landscape within the public right-of-way and publicly-owned grounds. Dead plants, shrubs, trees and ground cover shall be replaced with new items as soon as practical. The irrigation system shall be operated and maintained to provide adequate watering of all plants, shrubs, trees and ground cover. Irrigation systems shall be installed as deemed appropriate by the Maintenance Superintendent. Costs associated with the vehicle replacement amortization program for those vehicles used in conjunction with Landscape Maintenance are included within the projected expenditures for the District. BIB] 37650-U01 1994-U02 057-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1553-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-57-U05 JUN-U05 1-U05 1994-U05 1994 057 CC RESO(Ìì¸þSECTION IV PROJECTED REVENUE AND EXPENDITURES FY 94-95 BEGINNING FUND BALANCE $ 48,000 FY 94-95 PROJECTED REVENUE Lighting and Landscape District 1,303,744 County Advalorem Tax 350,000 Total Resource $1,701,744 FY 94-95 PROJECTED EXPENDITURES Landscaping Lighting & Traffic Signals $1,104,629 473,600 Barn Street Park Renovation 40,000 Engineering Support Personnel 31,872 District Consultant 7,000 Administrative Overhead and Reserves 44 000 $L,701;l0l PROJECTED FUND BALANCE June 30, 1994) FY 94-95 Revenue $1,701,744 FY 94-95 Expenditure 1,701,101 Assessment District Reserves $ 643 SECTION V DIAGRAM A diagram showing the assessment parcel number and the dimensions of each lot or parcel of land within the District is on file in the office of the City Engineer. SECTION VI ASSESSMENT The landscaping, lighting and traffic signals are for the benefit and enjoyment of all properties within the District and all parcels benefit from the maintenance of the improvements. The assessment of cost upon each parcel was apportioned in accordance with the estimated benefit received. Traffic signal maintenance costs are assessed throughout the district on a per parcel basis. The criteria used for the assessment spread of lighting and landscaping is as follows: 1. Rectangular lots street frontage 2. Irregular lots a) width of lot at set back line b) average of front and rear lot line lengths or C) street frontage, whichever is most representative of benefit 3. Flag lots one-half of total footage to each of the two lots 4. Corner lots The narrowest frontage BIB] 37650-U01 1994-U02 057-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1553-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-57-U05 JUN-U05 1-U05 1994-U05 1994 057 CC RESO(Ìì¸þThe District is divided into four assessment zones. Zone 1 includes all residential parcels and Zone 2 includes all commercial and industrial parcels that were assessed for street lighting and traffic signal maintenance. Zone 3 includes all commercial industrial and residential parcels in the District that were assessed for landscaping maintenance. Zone 4 includes the West Ramona Residential Redevelopment Project Tracts Nos. 39090, 39635, 40746, 42828 and 41956) that was assessed for landscaping, lighting and traffic signal maintenance The proposed assessment for fiscal year 1994-1995 is derived by apportioning a part of the total cost shown in Section IV, among the assessable parcels in proportion to the estimated benefits. A portion of the Assessment District Revenues is derived from Countywide Property Taxes or the Ad Valorem Tax. The City receives as part of its tax apportionment and percentage for lighting and landscape purposes. Front Frontage Proposed Assessment Description Parcel Count Assessment Revenues Zone 1 & 2 Street Lighting) Commercial/ Industrial 104,752 L.F. $ 77/L.F. $ 80,659.40 Residential 631,474 L.F. 39/L.F. 246,274.86 Zone 3 Landscaping) All Parcels 736,226 L.F. 1.06/L.F. 780,399.56 excluding Zone 4) Zone 4 Lighting & Landscaping) Tract Nos. 39090,39635, 40746, 42828 and 41956 160 Lots 258.04/Lot 41,286.40 14 Lots 72.00/Lot 1,008.00 Zone 2 Traffic Signals) Commercial/ Industrial 1,214 Parcels 16.49/Parcel 20,018.86 Zone 1 & 4 Traffic Signals) All Parcels 12,894 Parcels 10.40/Parcel 134,097.60 $1,303,744.32 The assessment number and the amount of assessment upon each lot or parcel are shown on the assessment roll. Upon confirmation by the Council this data will be submitted to the County Auditor-Controller for the inclusion on the 1994- 1995 tax roll. BIB] 37650-U01 1994-U02 057-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1461-U03 DO1553-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 94-57-U05 JUN-U05 1-U05 1994-U05