Loading...
HomeMy WebLinkAbout1995 052 CC RESO1995 052 CC RESO(Ìì·— RESOLUTION NO.95-52 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK AMENDING RESOLUTION NO. 95-24 SETTING FEES AND CHARGES FOR ISSUANCE, PROCESSING, AND FILING OF VARIOUS CITY SERVICES AND PERMITS IN THE CITY Court Referral Program) THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES RESOLVE AS FOLLOWS: SECTION 1. That the cost of issuing, processing and filing various city services and permits shall be in accordance with the attached Chart of Fees and Charges, marked Exhibit A." SECTION 2. That Resolution No.95-24 and all amendments hereto, in conflict herewith are hereby rescinded. SECTION 3. That said Chart of Fees and Charges shall become effective immediately. SECTION 4. That the City Clerk shall certify as to the adoption of this Resolution and shall cause the same to be processed in the manner required by law. APPROVED AND ADOPTED this July 19,1995. MAYOR LINDA L GAIR, CITY CLERK STATE OF CALIFORNIA COUNTY OZ LOS ANGELES) ss CITY OF BALDWIN PARK I, LINDA L. GAIR, City Clerk of the City of Baldwin Park do hereby certify that the foregoing resolution was duly and regularly passed and adopted by the City Council of the City of Baldwin Park at its regular meeting of the City Council on July 19,1995 by the following vote: AYES MARTINEZ, MUSE, LOWES, LOZANO NOES NONE ABSENT MAYOR VARGAS ABSTAIN NONE CITY CLERK BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES INDEX Topic Page General Fees 1-3 Community CenteriRecreation Fees 4-5 Engineering Fees 6 12 Planning Fees 13- 14 Building Fees 15- 19 + attachment Police Fees 20 21 BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·— CITY OF BALDWIN PARK EXHIBIT Z SCHEDULE OF FEES AND CHARGES RESOLUTION 95-23 SPECIAL SERVICES Government Reports Municipal Code Complete $75.00 Municipal Code Addendum Subscription 20.00 Zoning Code Complete COST TO Zoning Code Addendum Subscription DUPLICATE) City Budget 20.00 General Reports 1st sheet of series 1.00 each additional 15 Police Reports 15.00 Police Background Investigation Civil 15.00 hour Agenda Packet 25.00 General Plan only) 55.00 OR COST TO DUPLICATE) Zoning Map 8.00 General Plan Map 5.00 Building Plan Records LefterSize 10 sheets Other Size 35 sheet Photographs 10.00 All Sizes Miscellaneous Permits Entertainment Permit Initial 250.00 Entertainment Permit Renewal 175.00 Gun Permits $10.00 forwarded to State P.C. 12054]) 13.00 ea. Business Alarm Permits Initial Hookup 25.00 Strong Motion Instrumentation Fee 0.007% % of construction cost) Fingerprints Applicant supplies card and forwards to DOJ for 10.00/set + clearance State Fee Department takes prints and forwards to DOJ for 10.00/set + clearance State Fee Administrative Fee 9.00/set BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 2 Impounds Impound/Stored Vehicles Release $ 40.00 Driving Under Influence DUI)/Stored Vehicle 230.00 Vendor Carts 108.00 Appeals Filing and Processing Fee $ 50.00 ea Zoning and Subdivision Appeals 300.00 Public Nuisances Abatement Costs Exceeds $1,000 50.00 ea Abatement Costs less than $1,000 10.00 ea Fireworks Permit and Processing Fee No Charge Compliance Deposit & Inspection Fee Non-Refundable 50.00 Liability Insurance As Required Returned Checks NSFIetc 25.00 Bicycle License Annual Fee Set by State Animal Control Dog License Fee Set by County Parade Permit and/or Demonstrations 25.00 Refuse Collection and Disposal Set by Council Resolution Temporary Waste Bins Public Right-of Way Only 20.00 ea Barricades and Reflective Tape)) two week period Non-Exclusive Franchise Fee Commercial/Industry 750.00 Business License Transfer to New Location 25.00 ea Duplicate Certificate Lost or Destroyed 5.00 ea Bankruptcy, Fire and Close-Out Sales Filing and Processing Fee 30 Days 50.00 ea 60 Days 100.00 ea 90 Days 150.00 ea Complete Business License Address Computer Print-Out 75.00 ea Bingo Permits 50.00 year BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAï»daø' 3 Court Referral Program 1 120 Hours Ò¸baø' 20.00 121 Hours Plus 25.00 W7H6$ª s Compensation Fee 20.00 Dances Permit FiÒþ1&øfnd Processing Fee 50.00 ea Safety Services ø)}aø' ! Set by P.D. Handbills Permit Filing and Processing ˆ.gaø' 50.00 ea Massage Parlors Permit Filing and ProcessoÂ.ažbe 250.00 New Employee Checks X*kaø' 25.00 Taxicabs Certificate of Convenience and Necessity "Diaø' 500.00 Annual Renewal of Certificate 350.00 än.#±kity Insurance ! As required Changes in Drivers, ²'"(»kes, Etc. As required Temporary Use Permits Filing andÄ $7½ttigation Fee 115.00 ea Street Benches PermitŒ‡-±ig and Processing fee 1 0.00/bench/yr Bench Removals by City "DYaø' 25.00 ea Bench Storage by City max. 60 days Äâ[aø' 10.00/week/ea Street Banners Permit Filing and Procdssing Fee ~Taø' 50.00 ea Yard Sales Only Allowed 1st weekend of March, June, ™„5½jber and No Fee December Motorized Vending Catering/Ice Cream/ Produce –3­dks) Background Check 100.00 FingerÆR%/¬t and/or Palm Prints 50.00 Seller's Permit Owner) ZCtaø' 50.00 Truck Inspection º:qaø' 35.00 Reinspection 17.00 Venþu#f«'Permit Per Driver) 15.00 BIB] 37650-ÃÕaLÒ6995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 Cœqë RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 4 COMMUNITY CENTERIRECREATION Park Facilities and Recreation Activities Facility Building) Fees Fees/per hour/rate) Less than 100 More than 100 Res. Non-Res. Res. Non-Res. Assembly Hall $10.00 $15.00 $15.00 $20.00 Meeting Room Craft Room 7.00 12.50 Kitchen/Serving equipment 7.50 15.00 15.00 25.00 Kitchen Deposit 50.00 flat per day Gymnasium 25.00 35.00 50.00 75.00 Equipments/Supplies TV/VCR & P.A. System 25.00 flat per day Slide Projector & Screen 15.00 flat per day Tablecloth 2.50 per tablecloth Coffee 10.00 50 or less) 15.00 50 or more) Tables Deposit 50.00 flat per table 2.00 per chair 25 Weightroom/Boxing Gym RESIDENTS ANNUAL MONTHLY DAY 8-17 Years $ 30.00 $ 3.00 $ 25 18 yrs & over $100.00 $10.00 $ 2.00 NON-RESIDENTS 8-17 Years $ 60.00 $ 6.00 $ 50 18 yrs & over $200.00 $20.00 $ 4.00 Pool Fees Rental Residential) $ 80.00 1-99/2 hrs/1 guard $160.00 100-199/2 hrs/2 guards Admissions RESIDENTS NON-RESIDENTS Youth 0-17 25 1.00 Adults 18-54 50 1.50 Sr. Citizens 55 and Older Free 50 BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 5 Pool Fees con't) Swim Classes RESIDENTS NON-RESIDENTS Youth Registration 5.00 20.00 Adult Registration 10.00 25.OQ Recreational Activities RESIDENTS NON-RESIDENTS Youth 5.00 20.00 Adult 7.50 25.00 Non-Resident Application In Addition to Use Charges) Processing Fee 10.00 Special Facilities 10.00 hour Facilities Not Scheduled to be Open 7.50 hour Sports Field RESIDENTS NON-RESIDENTS 25.00 hour 35.00 hour Lighting Sports Lighting Maximum 2 1/2 hours 16.00 game 8.00 per team Reservation of Covered picnic Areas 7.50 per hour BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 6 ENGINEERING FEES Encroachment, Moving and Load Regulations Permit Filing and Processing Fee for Moving Load or Vehicle 15.00 ea Over Width, Height or Weight Per Occurrence Encroachments Gunite Storage 25.00 ea Gunite Cleanup-Deposit returnable) 20.00 ea Overhead Structures 300.00 ea The fee for other encroachment permits not listed will be determined by the Director of Public Works Pavement Restoration Utility Cuts 4.00 s.f. $3.70 s.f. Refundable if work performed by permittee) Engineering Fees Expedite Map/Plan Check 11/2 times the fee For items not covered in the Fee schedule a minimum of one 1) hour will be charged at the minimum hourly rate of $ 50.00 Subdivision Filing and Plan Check Fee Tentative Parcel Map 1500.00 Tentative Tract Map 2000.00 First Ten Lots or Units) + 45.00/Lot or Unit Lots or Units 11-25) + 25.00/Lot or Unit Lots or Units 26-50) Parcel Map Final Map) 2400.00 + $60/Parcel Tract Map Final Map) 2400.00 + $60/Lot Easement Deed* 450.00 Easement Checking* 400.00 Monument Inspection 425.00 ea Parcel Map 800.00 ea Tract Map Verification that City Map is consistent with conditions of tentative approval 300.00 BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·— SCHEDULE OF FEES AND CHARGES PAGE 7 Verification that City Grant of Waiver and Certificate of Compliance are consistent with conditions of tentative approval 300.00 Agreement and/or Improvement Security 300.00 ea Extension of Time for Improvement Agreement 250.00 per letter Fourth Submittal of Originals and/or Prints 450.00 Sixth Submittal of Originals and/or Prints 1250.00 Eighth Submittal of Originals and/or Prints and each Subsequent Submittal 1500.00 Extension of Time for Final Map Six Months 250.00 One Year 500.00 Recordation Fees First Sheet 6.00 Second Sheet and All Subsequent Sheets 2.00 ea Certification of Correction 500.00 Certificate of Compliance* 1000.00 Street Vacation* 1000.00 Covenant and Z 600.00 Lot Line Adjustment 1500.00 Miscellaneous Documents 600.00 *The fee for these items includes only the review of the legal description and the research associated with the particular case. However, if the City provides the legal description add $150 to the fee indicated. Improvement Plans A fee shall be charged at the time of plan submittal in the amount set forth below. 1. Plan Check: Improvement Valuation Fee $ 0 999 $ 150.00 $ 1,000-9,999 $150 +11% x Valuation 1,000) $ 10,000 49,999 $1,140 + 8% x Valuation 10,000) $ 50,000 99,999 $4,340 + 4% X Valuation 50,000) $ 100,000 999,999 $6,340 + 2% x Valuation 100,000) $ 1,000,000 and over $24,340 + 1.5% x Valuation 1,000,000) BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—  SCHEDULE OF FEES AND CHARGES PAGE 8 2. Inspection: Inspection fee shall be 100% of the plan check fee. Drainage Plans One 1) lot to three(3) lots 120.00 Four 4) lots or more 500.00 Erosion Plan Inspection Fees Less than One Acre 50.00 One Acre but Less Than 5 Acres 200.00 GRADING AND EXCAVATION Plan Check Yardage Base Amount Vol in CY or Exceeding Fraction of CY of 50 to 100 CY $ 140 minimum 101 to 1,000 CY $ 140+ 60 per 100 100 1,001 to 10,000 CY $ 700+ 70 per 1,000 1,000 10,001 to 100,000 CY $ 1,330+ 80 per 10,000 10,000 Over 100,000 CY $ 2,050+ 50 per 10,000 10,000 Inspection Permit Issuance Base Amount Vol in CY or Exceeding Yardage Fraction of CY of 50 to 100 CY $ 280 minimum 101 to 1,000 CY $ 280+ 70 per 100 100 1,1,000 to 10,000 CY $ 910+100 per 1,000 1,000 10,000 to 100,000 CY $ 1,810+200 per 10,000 10,000 Over 100,000 CY $ 3,610+100 per 10,000 100,000 Fourth Submittal and each Subsequent Submittal for 25% of Grading, Drainage and Improvement Plan Checks original plan check fee Reproduction Costs Blueline prints 24" x 18") 5.00 First & Blueline prints 24" x 36") 3.00 Sepia any size) additional print Final Map Blueline Copy 8 1/2" x 11" or 8 112" x 14") 25 ea Materials Purchase Plain Mylar 24" x 36") 5.00 ea Plan & Profile Mylar 24" x 36") 6.00 ea BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·— SCHEDULE OF FEES AND CHARGES PAGE 9 Sewer Connection Permit Fee Residential 50.00/per dwelling unit 20.00 dwelling unit if more than 10 units Commercial & Industrial 100.00 per unit 50.00 per unit if more than 10 units Rectangular lot depth, 100 ft or less 8.00 ft Rectangular lot depth, more than 100 ft 8.00 ft + 0.01 s.f. over 100 ft of depth Irregular lot, frontage 60 ft or less 8.00 ft or 0.08 s.f. for first 6000 s.f., whichever is greater, + 0.01 s.f. for all areas in excess of 6000 s.f. Irregular lot, frontage greater than 60 ft 8.00 ft + 0.01 s.f. for all areas in excess of 6000 s.f. Each existing lateral utilized by property owner(s) 175.00 Public Works Permit Note: Permit fees are computed at 5% of the total valuation of the work to be done under the permit. The unit costs listed shall be used in calculating the total work valuation as appropriate. In no event shall the minimum permit fee be less than $100.00. The cost of removals shall be calculated at 60% of the construction cost. Curb Only 10.00 l.f. Roll Curb 12.00 l.f. Cross Gutter 16.00 l.f. Curb and Gutter 16.00 l.f. Parkway Landscaping 2.00 s.f. Sidewalk 4" P.C.C.) 3.50 s.f. Drive Approach 6" P.C.C.) 4.50 s.f. Crushed Aggregate Base 1.25 s.f. Asphalt Pavement: 4" thick 1.50 s.f. 4" thick 2.50 s.f. Wheelchair Ramp 4" P.C.C.) 450.00 ea BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·— 1995 052 CC RESO(Ìì·— SCHEDULE OF FEES AND CHARGES PAGE 11 Traffic Striping or Lane Line Marking 0.15 l.f. Lettering/Arrow 15.00 ea Street Name Signs 2) & Post 250.00 ea Traffic Regulatory Sign 170.00 ea Traffic Signal 2 to 4 phase) $70,000.00 Traffic Signal 5 to 8 phase) 90,000.00 Traffic Signal Modification 15,000.00 Street Light 2,2,000.00 Street Tree Installation 175.00 ea Reinspection Fee 3rd and Each Subsequent Inspection 65.00 Site Review Plans Room Addition More than $10,000 25.00 Street Name Change Application Fees 1,000.00 Cost of signs, upon approval of street name change, determined by the Director of Public Works TEMPORARY USE PUBLIC WORKS PERMIT FEES INCLUDES UTILITIES Lane Closure No Street Cuts Per Occurrence 100.00 Monthly Permit 350.00 Annual Permit 3,000.00 Approved Road Closure 500.00 day If Public Convenience Dictates All utility permits for excavation or street cuts in the City's right-of-way or in the City's future right-of-way as determined by the City's General Plan shall be issued to utility companies. BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 12 PENALTY WORK COMMENCED PRIOR If any work is commenced on public right-of-way without a permit, the Permittee must obtain an after-the-fact permit. If it is determined that the work was an emergency in nature and it is approved by the Director of Public Works then the after-the-fact permit fee will be charged as a regular permit fee. After-the-Fact Permit Issuance Double the Total Fees BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 13 PLANNING FEES Planning Fees Administrative Adjustment 500.00 Zone Variance or Conditional Use Permit 1,000.00 Zone Variance Single Family Single Lot) 325.00 Amendment to the Zoning Code or the General Plan 2,500.00 Zone Change Only 1,800.00 Development Agreement Actual Costs Incurred by Staff Development Plan 1,500.00 Environmental Review Categorical Exemption 60.00 Negative Declaration 180.00* Environmental Impact Report review only) 70.00 hr* Environmental Impact Report preparation) Actual costs incurred Combined Public Hearings 100% of highest and 50% of any additional *Plus any reasonable expenses for staff or consultant services. Zoning Map Copy 8.00 ea General Plan Map Copy 8.00 ea Appeals, Zoning To Planning Commission or City Council) 300.00 Appeals, Tentative Maps 300.00 Time Extension 400.00 Sign Permit 50.00 Plan Reviews/Design Review Commercial/Industrial/Office Residential Maximum Commercial New Construction Dwelling Office/Industrial Square Feet Units Remodel Value FEE 1 1,000 $100,000 $200.00 1,001 3,000 2-4 200.000 325.00 3,001 6,000 5-6 400,000 475.00 6,001 10,000 7-10 700,000 625.00 10,000 15,000 11-15 1,000,000 900.00 15,001 20,000 16-20 1,500,000 1,100,00 CONTINUED NEXT PAGE) BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 14 20,001 27,000 21-25 OVER 1,500,000 1,300.00 27,001 35,000 26-35 1,500.00 35,001 45,000 36-45 1,750.00 45,001 60,000 46-60 2,000.00 60,001 100,000 61-100 2,300.00 100,00 150,000 101-150 2,600.00 Over 150,000 over 150 3,000.00 **The initial plan review/design fee shall cover initial review of the plans plus review of up to two revised plans. Further review shall be charged at 33.3 percent of the base fee rounded to the nearest $5.00) for each revision. Publications Zoning Code Complete AT Zoning Code addendum Subscription DUPLICATION General Plan only) COST BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 15 BUILDING FEES Building Fees AEIHB & B4 Occupancies*) 1. Permit Fee: Valuation fees see BUILDING ATTACHMENT I) 2. Plan Check Fees: * Plan check fee is 85% of the building permit fee, with a minimum t $82.00. * Handicapped plan check fee is 5% of the building permit fee. * Plan check fees will not be charged for reroofing or air conditioning when plans are not required. * For RI, R3 & M Occupancies, use 80% of the fees tables above. Building Permits Reinspection Fee 65.00 Certificate of Occupancy Original No Charge Certificate of Occupancy Subsequent 40.00 Certificate of Occupancy Temporary 57.50 Request for Address Change 750.00 Building Regulations Variance Filing and Processing Fee 65.00 Energy Conservation Regulation Plan Check and Permit Fee 20% of total of building permit and plan check fee Uniform Plumbing Code For Issuing Each Permit 28.00 In Addition: For each plumbing fixture or trap or set of fixtures on one trap 12.00 including water, drainage, piping and backflow protection thereof) For each building sewer and each trailer park sewer 15.00 Rainwater Systems per drain 12.00 For each sewer connection 40.00 For each private sewage disposal system 30.00 For each sewer cap 12.00 For each water heater and/or vent 12.00 BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 16 Description For each gas piping system of one 1) to five 5) outlets 12.00 For each gas piping system of six 6) or more, per outlet 3.00 For each industrial waste pre-treatment interceptor, including 15.00 its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps. For installation, alteration or repair of water piping and/or water 15.00 treating equipment For repair or alteration of drainage or venting piping 12.00 For each lawn sprinkler system or any one meter including 12.00 backflow protection devices therefor For vacuum breakers or backflow protective devices on tanks, 15.00 vats, etc., or for installation on unprotected plumbing fixtures including necessary water piping one to five Over five, each 3.00 Plumbing Reinspection Fee 65.00 Uniform Mechanical Code Heating Appliance 15.00 Relocate or Replace Vent 12.00 Confort Cooling Under 10,000 BTU 15.00 Over 10,000 BTU 20.00 Compressor or Boiler Under 3 H.P. 15.00 Compressor or Boiler Over 3 H.P. to 15 H.P. 18.00 Over 15 H.P. to 30 H.P. 35.00 Over 30 H.P. to 50 H.P. 62.00 Over 50 H.P. 95.00 Gas System 12.00 Vent Fan 15.00 Hoods 15.00 Miscellaneous 15.00 Permit Fee 28.00 Reinspection Fee 65.00 Uniform Swimming Code Fees Per Building Permit Fee BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 17 Electrical Code 30.01 Fees New Construction and Additions Permit Issuance Fee $28 + fee for each scheduled in Section 30.4 + $ 05 per ampere for each service switch 600 volts or less; $ 02 per ampere for each additional service switch in excess of 600 volts. In addition the following fees shall apply to each type of construction: a. Gasoline Service Station Buildings $ 0.15 s.f. b. Drinking or Dining Establishments 15 s.f. c. Power Plants Pumping Plants 15 s.f. a. Woodworking Establishments, Planning Mills $ 0.07 s.f. b. Steel Mills, Factories 07 s.f. c. Manufacturing Plants, Assembly Plants 07 s.f. d. Gasoline Service Station Open Canopies 07 s.f. e. Repair Garages, Aircraft Repair Hangar 07 s.f. f. Ice Plants, Cold Storage Plants 07 s.f. g. Creameries, Bakeries, Food Processing Plants 07 s.f. h. Hotel, Motel, Apartment Houses, Lodging Houses 07 s.f. I. Dwellings 07 s.f. j. Dry Cleaning 07 s.f. Description a. Office Building $ 0.05 s.f. b. Stores, Markets wholesale or retail) 05 s.f. c. Hospitals, Sanitariums, Convalescent Hospital 05 s.f. d. Nursing Homes, Child Nurseries 05 s.f. e. Schools 05 s.f. f. Churches, Assembly Buildings 05 s.f. g. Amusement Park Structures 05 s.f. h. Any Occupancy Not Listed 05 s.f. a. Residential Accessory Building, Attached or Detached, Such As $ 0.03 s.f. Private Garages, Carports, Sheds, etc. b. Hotel, Motel, and Commercial Parking, Garages and Carports 03 s.f. c. Warehouses Up To and Including 5,000 s.f. 03 s.f. a. Warehouses That Part Which is Over 5,000 s.f $ 0.02 s.f. b. Storage Garages Where Work No Repair is Done 02 s.f. c. Aircraft Hangars Where No Repair Work Is Done 02 s.f. 30.2 Alterations and Additions. $5.00 per circuit Where no structural work is being done, or where it is impractical to use the square footage schedule. BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 18 30.3 Minimum Total Fee. $15.00 minimum For Any Type of Construction or Installation. 30.4 Fees. For Fixed Motors, Transformers, Generators, Heating and Cooking Appliances, etc. Converting all units to H.P. horse power), K.W. Kilowatt), K.V.A. Kilovolt ampere) fees shall be determined as follow: 1 $ 6.00 Over 1, not over 5 9.00 Over 5, not over 20 11.00 Over 20, not over 50 17.00 Over 50, not over 100 21.00 Over 100, not over 500 32.00 Over 500, not over 1000 45.00 over 1000, not over... 62.00 30.5 a) Lighting Standards Less than 3 on a site 10.00 Each additional over 3 on a site 3.00 Lampholding devices, not a part of a lighting standard Festoon Type) Not over 50 12.00 Over 50, not over 100 22.00 Over 100 32.00 30.6 Signs and Outline Lighting One Sign and Gas Tube System 10.00 Each Additional Sign or Gas Tube System 7.00 Each Transformer or Ballast 3.00 Each Motor or Flasher 3.00 Each Lampholding Device in Connection with a Sign from I to 20 inclusive, 30 ea next 100 15 ea each additional 08 ea 30.7 Temporary, Permanent or Construction Poles Temporary, Underground and Work-With Services: Temporary Underground Services 28.00 Temporary Work-With Service Residential) 16.00 Temporary Work-With Service Commercial) 28.00 BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 19 30.8 Miscellaneous Any electrical work for which a permit is required, but no fee is 15.00 herein provided 30.9 Annual Maintenance Electrician Fee for each annual Maintenance Permit. Fees for all work installed under such permit since date of last previous inspection shall be paid according to the above schedule at the time the annual permit is issued. Where plans are required and the service is over 400 amps, a plan check fee equal to 50% of the permit fee shall be paid at the time plans are submitted. Uniform Sign Code Fees Fees per Building Permit Fees BUILDING ATTACHMENT I Building Valuation Data SEE FOLLOWING PAGE INSERT Fees as Current BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·— SEE ORIGINAL FOR BETTER COPY BUILDING VALUATION D•Ý' At the request of numerous building offiZials, BuddinZ Standards offers the following butôƒ$=¹` valuation data representing averaZe cosZ for most ZcauZ residential buildings are the moù\e~¸iimon for many cit ics two general clisses are conSidered or these. one for average construé\,r¹'and the othZr trr Zood. ZdIustment5 Should he made tZr ZZial archttectural Of structural àœi¢ues and tke location of the proleet. Higher Of lower unit costs may often rtZtllt The uôQ9=”HSts are intended to comply with the deflnitioO of valuation in SectiZn 423 ot the Åçy,÷R,tit()rrtt Bu,ld,nZ Corfe1Z and thus include architectural, oructural. electrical. plunibç =¶id meehani(-,1l work. eZcept as specificalty listed helow The Znit costZ-il'Zo inctZ(le thet¹.s£uactors tirofil, which should not he On)itted- Tlwdetermin-ition of plan Ch((k fees t.ròš|mhjects reviewed bythe International Cnnferen(e 0 Auilding O(ficiZlZ will lie hisedon valuat‰á4=´hmputed from these figurZ. which were established in April 1994. ªe=´ riter coorer cetre, ¾Ie=÷' Squart foot Square Foot. s-ar, Fool. ª8o=÷' Square Foot. Z T orZrrr Z TZ Zª8o=¶] Z Z 1yZ APARTMENT hOUSES: 7 DWEZ[lNGS # ¦?c=÷' 13. JAILS.- Type Ill-N.............26.70 Type or......òWo3ù)......7250 ype a nry 60.80 Type br II FR..........130.00 TypeV-1.houü“3ù)......27.10 Good) $Z.00 Good) $7800 Type Ill£aU¸rr...... 116.90 20. RESTAURANTS: Type VZasonry Z ºI=÷' 54.30 TypeV-I-Hour...........88.00 Type Ill-I-Hour........78.80 or Type Ill)............5880 Z # 14. T.rtr: Type Ill-N.............16-20 BaseriientZ Type I or II FR........95.40 Type V-i Hour.........72.00 ratne 51.6 Semi Finished...16.20 Type Il-i-Hour.........68.90 Type V-N...............69.10 Good) $18.50 Type Il-N..............65.50 21.SCHOOLS: Type Zaternettt Garage 30.80 Unfinisked......12.20 Type Ill-i-Hour........72.70 TypelorIl FR...........90.90 2.AUOITORIUMS: Good) $14.30 TypelIlZ...............69.20 TypelI-1-Hour..........61.20 Type I cr11 FR............85.80 8. FIRE STATIONS: Type V-i hour.........68.20 Type Ill-i Hour.......65.70 Type ll-l41our............61.50 TypeIorIlF.R................92.80 TypeV-N................65.20 Type Ill-N.............62.30 TypeIZ....................58.80 Tysell-idlour...............60.50 15.MEDICALOFFICES: TypeV-1Zour Z.. 61.20 Type llZ1-Zour............64.60 Type lIZ....................57.50 Type I or It FR.'......97.40 Type VZ................58.40 Type lIIZ.................61.70 Type Ill-i-hour.............66.70 Type li-i-Hour.........74.60 22.SERVICESTATIONS: TypeV-1-Hour..............61.40 Type llIZZ..................63.80 Type tIZ...............71.20 Type Il-N..............54.40 TypeVZ....................58.50 #Type V-i-hour...............62.20 Type Ill-i-Hour........78.60 Type Ill-i-Hour........56.60 3. BANKS: lypeVZ......................59.20 Type Ill-N.............75.70 Type V-I-Hour..........48.10 TypelorlI FR.'............121.40 9. HOMES IOR THE ELDERLY: Type V-ldlour..........-72.90 Canopies...............22.60 Type Il-i-Hour............88.20 Type I Of II F.R............85.00 Type V-N...............70.00 23. STORES: Type llZN.................85.60# Type Il-I-Hour..............68.40 16. OFFICESZZ: Type I or II FR........67.40 Type ltZl4four............97.70 Type IlZ....................65.20 Type I or Il FR.'......87.20 Type Il-I Zour.........40.60 TypellZ...................94.30 Type Ill-i-Hour.............71.20 Type ll-1Zour..........57.80 Type Il-N..............39£o 1ZpeV-144our..............87.90 Type lllZ...................6820 Type lIZN..............-5520 Type IlZi-Hoijr........49.60 85.00 Type V-l44our...............68.60 Type llZ144our.........62.40 Type IIZ...............46.80 4. WOWUNG ALLEYS: 41.10 Type V-I'l..................65.70 Type ilI-'i............59.60 Type V-i 4(0ur.........41.60 ZZIl-i44our......................10. HOSPITALS: Type V-l44oii(.........57.80 TypeVZ.................38.40 Type lZ...................3830 Type I or II FJL'...........133.50 T VZ.................54.90 4. ThEATERS: 1Zpelll-144oiv............44.90 Type llZ1+Iar...............109.40 ZI Typel or II FR.........89£O Type 114-N................41.90 Type V-144our...............10330 Z F 4.. 19.60 Z lll-i44our.........`4.60 Type V-14Zour.............3030 ii HOTELS AND MOTELS: L CKLIRtCES: Type I or II F.FL'..........8220 Carports lb 13. Type V-i 4iour.........60.40 Z lorN Fit................8120 Type Ill-i 44our............71 i)o iZ PUBUC 8UILO NGS: Type V-lsl.............57.40 1Zpell-IZZ................6020 TypeUt-l'l..................67.60 iZpZIorlIF.R.'.........101.40 Z.WAREHZSEiiZ': 1ZIi-II...................5720 Type V-144our...............62.90 iZpZ I)-l44our.........80.90 Type lorlI FZ..........40.40 Z flZ14tOLW...............6530 T V-Il...........59.90 Type ll-'l.............77.60 Type II 23.60 Z ill-Il..................62.50 RIAL PlANTS: Type llZiZoZ...........83.80 Type II or V-Il........2220 Typev-144oue..............60.80 Type Icr....................46.60 Type llt-'l............81.10 Type IIZ1Zour..........27.10 Type V-Il.................58.00 Type Il-i Zour Z. 32.10 Type V-i+lotitr........76.70 TypeIZ.............25.00 C()ZZAL£SCENT HOSPITALS: Type Il-IlZ'ZZZ Z.£: Type V-Il..............73.80 REGIONAL MODIFIERS The Z6IZowirg modifiers are recomrnen.ded tor use in conjunction with the building valuation data. In add itiort, certun local condititneis may tequiteZ further niodZtcaticrs. lb tsse these modifiers, merely multiply the listed cost per square Z by the appropriate regional modifier. For example, to adjust tleZcost of a Type Ill G..ZlZZir hotel building of average constniCtIon for the Iowa area. select Regional Modifier 0.80 and unit Cost frorn valuation data, $71.00: 0.80 x 71.00 $56.80 adjusted cost per square 00tl Easlem U3. Morlif'ter Ilartern US. cont.) Modifier Cientral US. COnL} Modifier Western US. Modifier Ccrtret:ticut..............0.95 Pennsylvania Kentucky.................0.77 Alaska...................1.30 0.84 Philadelphia.....0.96 Loijtsiara...............0.78 Arizona..................0.82 District of Coltirnbia.....0.87 Cther............0.83 Michigan.................0.84 California Florida....................0.74 Rhode Island.................0.94 Minnesota................0.86 Los Angeles............1.00 Georgia....................0.68 Sarth Carolina...............0.70 Mississippi..............0.71 San Francisco..........1.13 Maine......................0.81 Verniont.....................0.80 Missouri.................0.78 Other..................0.94 Maryland...................0.79 VIrginia.....................0.73 Neoraska.................0.75 Colorado.................0.81 Massachusetts..............0.94 West Virginia................0.82 North Dakota.............0.80 Hawaii...................1.14 New Hampshire..............0.82 Central U.S. Ohio.....................0.80 Idaho....................0.80 Neavlersey.................0.91 Alabama......................0.72 Oklahorna................0.7) Montana..................0.79 New York Arkansas.....................0.70 South Dakota.............0.78 Nevada...................0.89 New York City.............1.16 Illinois.....................0.87 Tennessee................0.72 New Mexico...............0.76 Other.....................0.87 Indiana......................0.82 Texas....................0.74 Oregon...................0.83 North Carolina.............0.70 loZva........................0Z80 Zisconsin................0Z8S Utah.....................0.75 \W-iZllington............0.88 0.74 \r'yZtrnZng 0.80 lttJlZ DING STANDARDZ/l.Zitn,ZiZ-f 5'l)1Zi.1 \ I 47 BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·— SCHEDULE OF FEES AND CHARGES PAGE 20 POLICE Processing Time By Section Processing Time by Patrol Officer: 40 minutes Steps Involved in Handling CHP 180: Request registration/Stolen Information Via Radio Inventory Vehicle/Complete CHP 180 Report Deliver Report to Police Station Log Report Into Report Ledger Attach Computer Printout to Report Processing Time In Communications: 4 minutes Steps Involved in Handling CHP 180: Run a Registration/Stolen Check Relay Registration Information to Field Officer Complete Log Card Telephone Tow Agency Complete Tow Ledger Processing Time by Watch Supervisor Sgt.): 5 minutes Steps Involved in Handling CHP 180: Review Report for Accuracy/Completeness Log report as Approved" in report ledger Assist Records/Approve Release of Vehicle Processing Time in Records Section: 46 minutes Steps Involved in Handling CHP 180: Processing: 5 minutes Accepting Report and Pull Case Folder Run 28/29 to Verify Information Notification: 10 minutes Complete Notification Form And Mail to R/O, L/O and Storage Company File With Case Entry of Report: 10 minutes Enter Case and R/O Into Computer System BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·— SCHEDULE OF FEES AND CHARGES PAGE 21 Release: 10 minutes Check JDIC or Case Ledger for Case Number Verify RIO Information and License Status Get Detective Approval for Release if Not Indicated by Patrol Complete Form for RIO Signature Make Copy of Release for RIO to Present to Storage Company Directions to Storage Company Refile Report Paperwork Not Current: 3 minutes Send New RIO to DMV for Registration Update Send RIO to DMV to Pay Expired Registration, Upon Return Perform Release"' Again Phone Contact: 5 minutes Obtain License Number From RIO Check JDIC or Case Ledger for Case Number Pull Case and Determine Cause of Storage Call OSJ Agency, for a Recovered Vehicle, for OK to Release Tell RIO What is Necessary to Obtain Release Refile Case Notice of Impound Returned: 3 minutes Pull Case to Determine if Vehicle Has Been Released Mark Notification Form of Non-Release and Send Copy to DOJ Attach Returned Envelope to Original Storage Form Refile Case COMPENSATION RATES Position Hourly Rate* Benefits** Total Police Officer $ 15.93 $ 8.44 $ 24.37 Dispatcher 11.30 3.96 15.26 Police Sergeant 19.38 10.27 29.65 Records Clerk 9.36 3.28 12.64 * 3rd Step Employee ** Sworn at 53%INon-Sworn at 35% BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 1995 052 CC RESO(Ìì·—SCHEDULE OF FEES AND CHARGES PAGE 22 TIME AND MOTION RATES Position Time Pay Rate Cost Police Officer 40 minutes $ 24.37 $ 16.40 Dispatcher 4 minutes 15.26 1.00 Police Sergeant 5 minutes 29.65 2.45 Records Clerk 46 minutes 12.64 9.66 Total Cost $ 29.51 BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05 SCHEDULE OF FEES AND CHARGES PAGE 10 Sewer Installation: 12"0 V.C.P. 55.00 I.f 80 V.C.P. 50.00 l.f. 6"0 V.C.P. 45.00 I.f. Manhole 2000.00 Sewer Saddle 200.00 ea Dye Test permittee to provide dye) 150.00 ea UTILITY PERMITS Trench Length Plan Check Fee Issuance and Inspection Fee Up to 50' Minimum $ 25 Mm. $ 75 City does A.C. Mm. $ 100 Util. Co. does A.C. when directed 51' to 250' $25 + $ 25 I.f> 50' $1 00+ $ 50 I.f. 50' 251' to 1000' $50 + $ 15 If. 250' $200+ $ 40 If. 250' Over 1000' $165+ $ 05 I.f. 1000 $400+ $ 30 I.f. 1000 *UP to 200 s.f. add additional $6.00 s.f. for paving to be performed by the City. City to perform the paving unless otherwise directed by the Director of Public Works. NOTE: Fees applicable to work performed by both open trench and/or boring methods of installation. Non-Trench Work Plan Check Fee Issuance and Inspection Fee Up to 100 s.f. Minimum $25 *Min. $75 City does A.C. Mm. $125 Util. Co. does A.C. when directed Over 100 s.f. $25+ $ 30 s.f. 100 s.f. $125+ $1.00 s.f.> 100 s.f. Storm Drain Construction of New Catch Basin C.B., Transition Structure, 3500.00 ea or Manhole M.H. Modification of the existing C.B. or M.H. 2500.00 ea Drain Pipe/Roof Drain 20.00 l.f. Parkway Drain 600.00 ea Storm Drain Mainline RCP) 130.00 I.f. Storm Drain Lateral RCP) 90.00 I.f. BIB] 37650-U01 1995-U02 052-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1366-U03 DO1404-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 95-52-U05 JUL-U05 19-U05 1995-U05