Loading...
HomeMy WebLinkAbout1996 053 CC RESO1996 053 CC RESO(Ìì»zRESOLUTION NO. 96-53 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK AMENDING RESOLUTION NO. 96-18 SETTING FEES AND CHARGES FOR ISSUANCE, PROCESSING AND FILING OF VARIOUS SERVICES AND PERMITS IN THE CITY THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES RESOLVE AS FOLLOWS: SECTION 1. Resolution No. 96-18 is hereby amended by adding those fees as set forth in the attached Chart of Fees and Charges, marked Exhibit A." SECTION 2. That said Chart of Fees and Charges shall become effective immediately. SECTION 3. That the City Clerk shall certify as to the adoption of this Resolution and shall cause the same to be processed in the manner required by law. APPROVED AND ADOPTED this 3rd day of July, 1996. /A rv-r- MAYORx:=7 /CINDA LGAIR, CITY CLERK STATE OF CALIFORNIA COUNTY OF LOS ANGELES) ss. CITY OF BALDWIN PARK I. LINDA L. GAIR, City Clerk of the City of Baldwin Park do hereby certify that the foregoing resolution was duly and regularly passed and adopted by the City Council of the City of Baldwin Park at its regular meeting of the City Council July 3, 1996 by the following vote: AYES MUSE. LOZANO. LOWES. MARTINEZ. AND MAYOR VARGAS_______ NOES NONE__________________________________________ ABSENT: NONE ABSTAIN: NONE BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zCITY OF BALDWIN PARK EXHIBIT A" SCHEDULE OF FEES AND CHARGES RESOLUTION 96-53 SPECIAL SERVICES Government Reports Municipal Code Complete $ 75.00 Municipal Code Addendum Subscription 20.00 Zoning Code Complete COST TO Zoning Code Addendum Subscription DUPLICATE) City Budget 20.00 General Reports 1st sheet of series 1.00 each additional 15 Police Reports 15.00 Police Background Investigation Civil 15.00 hour Citation Verification Equipment Violations 10.00 Agenda Packet 25.00 General Plan only) 55.00 OR COST TO DUPLICATE) Zoning Map 8.00 General Plan Map 5.00 Building Plan Records Letter Size 10 sheet Other Size 35 sheet Photographs 10.00 All Sizes Miscellaneous Permits Entertainment Permit Initial Entertainment Permit Renewal Gun Permit Application Business Alarm Permits Initial Hookup Strong Motion Instrumentation Fee Booking Fees City Jail) Fingerprints Applicant supplies card and forwards to DOJ for clearance Department takes prints and forwards to DOJ for clearance Administrative Fee 250.00 175.00 3.00 25.00 0.007% % of construction cost) 75.00 10.00/set + State Fee 10.00/set+ State Fee 9.00/set BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES Impounds Impound/Stored Vehicles Release Driving Under Influence DUI)/Stored Vehicle Vendor Carts Human Powered) Vendor Merchandise After Court Disposition) Shopping Cart Retrieval per cart) Appeals Filing and Processing Fee Zoning and Subdivision Appeals Public Nuisances Abatement Costs Exceeds $1.000 Abatement Costs less than $1.000 PAGE 2 $ 40.00 230.00 108.00 40.00 3.00 $ 50.00 ea 300.00 50.00 ea 10.00ea Fireworks Permit and Processing Fee No Charge Compliance Deposit & Inspection Fee Non-Refundable 50.00 Liability Insurance As Required Returned Checks NSF/etc 25.00 Bicycle License Annual Fee Set by State Animal Control Dog License Fee Set by County Parade Permit and/or Demonstrations 25.00 Refuse Collection and Disposal Set by Council Resolution Temporary Waste Bins Public Right-of Way Only 20.00 ea Barricades and Reflective Tape)) two week period Non-Exclusive Franchise Fee Commercial/Industrial 750.00 Business License Transfer to New Location 25.00 ea Duplicate Certificate Lost or Destroyed 5.00 ea Processing and Inspections Fee New License) One Time Fee Commercial License 75.00 Home Occupation 25.00 Bankruptcy. Fire and Close-Out Sales Filing and Processing Fee 30 Days 50.00 ea 60 Days 100.00 ea 90 Days 150.00ea Complete Business License Address Computer Print-Out 75.00 ea Bingo Permits 50.00 year BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 3 Court Referral Program 1 120 Hours 121 Hours Pius Worker's Compensation Fee Dances Permit Filing and Processing Fee Safety Services Handbills Permit Filing and Processing Massage Parlors Permit Filing and Processing Fee New Employee Checks Taxicabs Certificate of Convenience and Necessity Annual Renewal of Certificate Liability Insurance Changes in Drivers. Vehicles, Etc. Temporary Use Permits Filing and Investigation Fee Street Benches Permit Filing and Processing fee Bench Removals by City Bench Storage by City max. 60 days Street Banners Permit Filing and Processing Fee 20.00 25.00 20.00 50.00 ea Set by P.D. 50.00 ea 250.00 25.00 500.00 350.00 As required As required 115.00 ea 10.00/bench/yr 25.00 ea 10.00/week/ea 50.00 ea Yard Sales Only Allowed 1st weekend of March, June, September and No Fee December Motorized Vending Catering/Ice Cream/Produce Trucks) Background Check 100.00 Fingerprints and/or Palm Prints 50.00 Seller's Permit Owner) 50.00 Truck Inspection 35.00 Reinspection 17.00 Vendor's Permit Per Driver) 15.00 BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE COMMUNITY CENTER/RECREATION Park Facilities and Recreation Activities Facility Building) Fees Fees/per hour/rate) Less than 100 Res. Non-Res. More than 100 Res. Non-Res. Assembly Half Meeting Room/ Craft Room Kitchen/Serving equipment Kitchen Deposit Gymnasium Equipment/Supplies TV/VCR & P.A. System Slide Projector & Screen Tablecloth Coffee Tables Deposit per table per chair $10.00 $15.00 $15.00 $20.00 7.00 12.50 7.50 15.00 15.00 25.00 50.00 flat per day 25.00 35.00 50.00 75.00 25.00 flat per day 15.00 flat per day 2.50 per tablecloth 10.00 50 or less) 15.00 50 or more) 50.00 flat 2.00 25 Weightroom/Boxing Gym RESIDENTS 8-17 Years 18 yrs & over NON-RESIDENTS 8-17 Years 18 yrs & over Pool Fees Rental Residential) ANNUAL$ 30.00 $100.00 MONTHY$3.00 $10.00 D$ $ AY.25 2.00 $ 60.00 $200.00 $6.00 $20.00 $ 50 $4.00 1-99/2 hrs/1 guard 100-199/2 hrs/2 guards $80.00 $160.00= Admissions Youth-0-17 Adults- 18-54 Sr. Citizens 55 and Older RESIDENTS 25 50 Free NON-RESIDENTS 1.00 1.50 50 BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 5 Pool Fees con't) Swim Classes Youth Registration Adult Registration Recreational Activities Youth Adult RESIDENTS 5.00 10.00 RESIDENTS 5.00 7.50 NON-RESIDENTS 20.00 25.00 NON-RESIDENTS 20.00 25.00 Non-Resident Application In Addition to Use Charges) Processing Fee Special Facilities Facilities Not Scheduled to be Open RESIDENTS Sports Field 25.00 hour 10.00 10.00 hour 7.50 hour NON-RESIDENTS 35.00 hour Lighting Sports Lighting Maximum 2 1/2 hours Reservation of Covered picnic Areas 16.00 game 8.00 per team 7.50 per hour COMMUNITY CENTER Meeting Room Double Size) Cleaning/Damage Security Gymnasium * Security * Cleaning/Damage Security Game Room *Cleaning/Damage Security AQUATIC FACILITY Pool 1 50) 51 100) 101 150) NON-RESIDENT RESIDENTS $ 10.00/hr. 20.00/hr 50.00 $ 15.00/hr 30.00/hr 50.00 25.00/hr 15.00/hr 150.00 35.00/hr 15.00/hr 150.00 20.00/hr 100.00 25.00/hr 100.00 50.00/hr 62.00/hr 80.00/hr 35.00/hr 42.00/hr 52.00/hr BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 6 SENIOR CITIZENS CENTER Assembly Hall 1 100) 101+) Decorating Fee * Security 1-100) 101+) * Cleaning/Dam age Security Classroom No Kitchen) Decorating Fee Security Cleaning/Damage Security BALLFIELD Softball Field * Cleaning/Damage Security ANNEX BUILDING General Hall/Kitchen Decorating Fee Security Cleaning/Damage Security PICNIC FACILITIES Shelter RESIDENTS NON-RESIDENTS $ 60.00/hr 80.00/hr 20.00/hr 15.00/hr 30.00/hr 250.00 20.00/hr 20.00/hr 15.00/hr 150.00 25.00/hr 50.00 20.00/hr 20.00/hr 15.00/hr 150.00 20.00 flat fee $ 70.00/hr 90.00/hr 20.00/hr 15.00/hr 30.00/hr 250.00 30.00/hr 20.00/hr 15.00/hr 150.00 35.00/hr 50.00 30.00/hr 20.00/hr 15.00/hr 150.00 20.00 flat fee WALNUT CREEK PARK Outdoor Assembly Shelter Security Cleaning/Damage Security 20.00/hr 15.00/hr 150.00 35.00/hr 15.00/hr 150.00 Security and Cleaning/Damage Fees imposed at the discretion of the Recreation and Community Services Director or his designee BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 7 ENGINEERING FEES Encroachment, Moving and Load Regulations Permit Filing and Processing Fee for Moving Load or Vehicle 15.00 ea Over Width, Height or Weight Per Occurance Encroachments Gunite Storage 25.00 ea Gunite Cleanup-Deposit returnable) 20.00 ea Overhead Structures 300.00 ea The fee for other encroachment permits not listed will be determined by the Director of Public Works Pavement Restoration Utility Cuts 4.00 s.f. $3.70 s.f. Refundable if work performed by permittee) Engineering Fees Expedite Map/Plan Check 1 1/2 times the fee For items not covered in the Fee schedule a minimum of one 1) hour will be charged at the minimum hourly rate of $ 50.00 Subdivision Filing and Plan Check Fee Tentative Parcel Map 1500.00 Tentative Tract Map 2000.00 First Ten Lots or Units) Parcel Map Final Map) Tract Map Final Map) Easement Deed* Easement Checking* Monument Inspection + 45.00/Lot or Unit Lots or Units 11-25) + 25.00/Lot or Unit Lots or Units 26-50) 2400.00 + $60/Parcel 2400.00 + $60/Lot 450.00 400.00 425.00 ea Parcel Map 800.00 ea Tract Map Verification that City Map is consistent with conditions of tentative approval 300.00 BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»z SCHEDULE OF FEES AND CHARGES PAGE 8 Verification that City Grant of Waiver and Certificate of Compliance are consistent with conditions of tentative approval 300.00 Agreement and/or Improvement Security 300.00 ea Extension of Time for Improvement Agreement 250.00 per letter Fourth Submittal of Originals and/or Prints 450.00 Sixth Submittal of Originals and/or Prints 1250.00 Eighth Submittal of Originals and/or Prints and each Subsequent Submittal 1500.00 Extension of Time for Final Map Six Months One Year Ftecordation Fees First Sheet Second Sheet and All Subsequent Sheets Certification of Correction Certificate of Compliance* 1000.00 Street Vacation* Covenant and Agreement* Lot Line Adjustment Miscellaneous Documents 250.00 500.00 6.00 2.00 ea 500.00 1000.00 600.00 1500.00 600.00 *The fee for these items includes only the review of the legal description and the research associated with the particular case. However, if the City provides the legal description add $150 to the fee indicated. Improvement Plans A fee shall be charged at the time of plan submittal in the amount set forth below. 1. Plan Check: Improvement Valuation $ 0-999 $ 1,000-9.999 $ 10.000-49.999 $ 50.000 99,999 $ 100.000-999.999 100.000) $ 1,000,000 and over Fee $ 150.00 $ 150 + 11% x Valuation 1.000) $1.140 + 8% x Valuation 10,000) $4.340 + 4% X Valuation 50,000) $6,340 + 2% x Valuation $24.340 + 1.5% x Valuation 1.000,000) BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»z SCHEDULE OF FEES AND CHARGES PAGE 9 2. Inspection: Inspection fee shall be 100% of the plan check fee. Drainage Plans One 1) lot to three(3) lots Four 4) lots or more Erosion Plan Inspection Fees Less than One Acre One Acre but Less Than 5 Acres 120.00 500.00 50.00 200.00 GRADING AND EXCAVATION Plan Check Yardage 50 to 100 $f 101to 1.000CY 1,001 to 10.000 CY 10.001 to 100.000 CY Over 100.000 CY Base Amount 140 minimum $ 140+ 60 per $ 700+ 70 per $ 1.330+ 80 per $ 2.050+ 50 per Vol in CY or Fraction of 100 1,000 10.000 10,000 Exceeding CYof 100 1.000 10,000 10.000 Inspection Permit Issuance Yardage Base Amount Vol in CY or Fraction of 100 1.000 10.000 10.000 50 to 100 CY $ 280 minimum 101 to 1,000 CY $ 280+ 70 per 1,00010 10.000 CY 10,00010 100,000 CY Over 100,000 CY $ 910+ 100 per $ 1.810+ 200 per $3.610+ 100 per Fourth Submittal and each Subsequent Submittal for Grading. Drainage and Improvement Plan Checks Reproduction Costs Blueline prints 24-x 18") Blueline prints 24- x 36") Sepia any size) Final Map Blueline Copy 8 1/2" x 11- or 8 1/2" x 14") Materials Purchase Plain Mylar 24" x 36") Plan & Profile Mylar 24" x 36") Exceeding CYof 100 1.000 10.000 100,000 25% of original plan check fee 5.00/ First & 3.00/each additional print 25 ea 5.00 ea 6.00 ea BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»z SCHEDULE OF FEES AND CHARGES PAGE 10 Sewer Connection Permit Fee Residential Commercial & Industrial Rectangular lot depth. 100 ft or less Rectangular lot depth, more than 100 ft Irregular lot, frontage 60 ft or less Irregular lot. frontage greater than 60 ft Each existing lateral utilized by property owner(s) 50.00/per dwelling unit 20.00 dwelling unit if more than 10 units 100.00 per unit 50.00 per unit if more than 10 units 8.00ft 8.00 ft + 0.01 s.f. over 100 ft of depth 8.00 ft or 0.08 s.f. for first 6000 s.f., whichever is greater, + 0.01 s.f. for all areas in excess of 6000 s.f. 8.00 ft + 0.01 s.f. for all areas in excess of 6000 s.f. 175.00 Public Works Permit Note: Permit fees are computed at 5% of the total valuation of the work to be done under the permit. The unit costs listed shall be used in calculating the total work valuation as appropriate. In no event shall the minimum permittee be less than $100.00. Hie cost of removals shall be calculated at 60% of the construction cost. Curb Only 10.00 l.f. Roll Curb 12.00 f. Cross Gutter 16.00 l.f. Curb and Gutter 16.00 l.f. Parkway Landscaping 2.00 s.f. Sidewalk 4- P.C.C.) 3.50 s.f. Drive Approach 6" P.C.C.) 4.50 s.f. Crushed Aggregate Base 1.25 s.f. Asphalt Pavement: 4" thick 1.50 s.f. 4" thick 2.50 s.f. Wheelchair Ramp 4" P.C.C.) 450.00 ea BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»z 1996 053 CC RESO(Ìì»z SCHEDULE OF FEES AND CHARGES Traffic Striping or Lane Line Marking Lettering/Arrow Street Name Signs 2) & Post Traffic Regulatory Sign Traffic Signal 2 to 4 phase) Traffic Signal 5 to 8 phase) Traffic Signal Modification Street Light Street Tree Installation ea Reinspection Fee 3rd and Each Subsequent Inspection 65.00 Site Review Plans Room Addition More than $10,000 PAGE 12 0.15 l.f. 15.00 ea 250.00 ea 170.00 ea $70,000.00 90.000.00 15.000.00 2,000.00 ea 175.00 25.00 Street Name Change Application Fees 1.000.00 Cost of signs, upon approval of street name change, determined by the Director of Public Works TEMPORARY USE PUBLIC WORKS PERMIT FEES INCLUDES UTILITIES Lane Closure No Street Cuts Per Occurance Monthly Permit Annual Permit Approved Road Closure If Public Convenience Dictates 100.00 350.00 3.000.00 500.00 day All utility permits for excavation or street cuts in the City's right-of-way or in the City's future right-of-way as determined by the City's General Plan shall be issued to utility companies. BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 13 PENALTY WORK COMMENCED PRIOR If any work is commenced on public right-of-way without a permit, the Permittee must obtain an after-the-fact permit. If it is determined that the work was an emergency in nature and it is approved by the Director of Public Works then the after-the-fact permit fee will be charged as a regular permit fee. After-the-Fact Permit Issuance Double the Total Fees BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 14 PLANNING FEES Planning Fees Administrative Adjustment 500.00 Zone Variance or Conditional Use Permit 1,000.00 Zone Variance Single Family Single Lot) 325.00 Amendment to the Zoning Code or the General Plan 2.500.00 Zone Change Only 1.800.00 Development Agreement Actual Costs Incurred by Staff Development Plan 1.500.00 Environmental Review Categorical Exemption 60.00 Negative Declaration 180.00* Environmental Impact Report review only) 70.00 hr* Environmental Impact Report preparation) Actual costs incurred Combined Public Hearings 100% of highest and 50% of any additional *Plus any reasonable expenses for staff or consultant services. Zoning Map Copy 8.00 ea General Plan Map Copy 8.00 ea Appeals, Zoning To Planning Commission or City Council) 300.00 Appeals. Tentative Maps 300.00 Time Extension 400.00 Sign Permit 50.00 Plan Review/Design Review CommerciaI/lndustrial/Office Residential Maximum Commercial/ New Construction Square Feet 1 1.000 1.001 3,000 3.001 6.000 6,001 10.000 10,000- 15.000 15,001 20.000 Dwelling Office/Industrial Units Remodel Value FEE $100,000 $200.00 2-4 200.000 325.00 5-6 400.000 475.00 7-10 700,000 625.00 11-15 1.000,000 900.00 16-20 1.500.000 1.100.00 CONTINUED NEXT PAGE) BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 15 20,001 27,001 35,001 45.001 60.001 100,00 Over 27,000 35,000 45,000 60,000 100,000 150,000 150,000 21-25 26-35 36-45 46-60 61-100 101-150 over 150 OVER 1.500.000 1.300.00 1,500.00 1,750.00 2.000.00 2.300.00 2.600.00 3,000.00 **The initial plan review/design fee shall cover initial review of the plans plus review of up to two revised plans. Further review shall be charged at 33.3 percent of the base fee rounded to the nearest $5.00) for each revision. Publications Zoning Code Complete Zoning Code addendum Subscription General Plan only) AT DUPLICATION COST BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 16 BUILDING FEES Building Fees AEIHP & B4 Occupancies*) 1. Permit Fee: Valuation fees see BUILDING ATTACHMENT I) 2. Plan Check Fees: * Plan check fee is 85% of the building permit fee. with a minimum t $82.00. * Handicapped plan check tee is 5% of the building permit fee. * Plan check fees will not be charged for reroofing or air conditioning when plans are not required. * For R1. R3 & M Occupancies, use 80% of the fees tables above. Building Permits Reinspection Fee 65.00 Certificate of Occupancy Original No Charge Certificate of Occupancy Subsequent 40.00 Certificate of Occupancy Temporary 57.50 Request for Address Change 750.00 Building Regulations Variance Filing and Processing Fee 65.00 Energy Conservation Regulation Plan Check and Permit Fee 20% of total of building permit and plan check fee Uniform Plumbing Code For Issuing Each Permit 28.00 In Addition: For each plumbing fixture or trap or set of fixtures on one trap 12.00 including water, drainage, piping and backflow protection thereof) For each building sewer and each trailer park sewer 15.00 Rainwater Systems per drain 12.00 For each sewer connection 40.00 For each private sewage disposal system 30.00 For each sewer cap 12.00 For each water heater and/or vent 12.00 BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 17 Description For each gas piping system of one 1) to five 5) outlets 12.00 For each gas piping system of six 6) or more, per outlet 3.00 For each industrial waste pre-treatment interceptor, including 15.00 its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps. For installation, alteration or repair of water piping and/or water 15.00 treating equipment For repair or alteration of drainage or venting piping 12.00 For each lawn sprinkler system or any one meter including 12.00 backflow protection devices therefor For vacuum breakers or backflow protective devices on tanks. 15.00 vats. etc., or for installation on unprotected plumbing fixtures including necessary water piping one to five Over five. each 3.00 Plumbing Reinspection Fee 65.00 Uniform Mechanical Code Heating Appliance 15.00 Relocate or Replace Vent 12.00 Contort Cooling Under 10,000 BTU 15.00 Over 10.000 BTU 20.00 Compressor or Boiler Under 3 H.P. 15.00 Compressor or Boiler Over 3 H.P. to 15 H.P. 18.00 Over 15 H.P. to 30 H.P. 35.00 Over 30 H.P. to 50 H.P. 62.00 Over 50 H.P. 95.00 Gas System 12.00 Vent Fan 15.00 Hoods 15.00 Miscellaneous 15.00 Permit Fee 28.00 Reinspection Fee 65.00 Uniform Swimming Code Fees Per Building Permit Fee BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 18 Electrical Code 30.01 Fees New Construction and Additions Permit Issuance Fee $28 + fee for each scheduled in Section 30.4 + $ 05 per ampere for each service switch 600 volts or less; $ 02 per ampere for each additional service switch in excess of 600 volts. In addition the following fees shall apply to each type of construction: a. Gasoline Service Station Buildings b. Drinking or Dining Establishments c. Power Plants Pumping Plants a. Woodworking Establishments, Planning Mills b. Steel Mills, Factories c. Manufacturing Rants, Assembly Plants d. Gasoline Service Station Open Canopies e. Repair Garages. Aircraft Repair Hangar f. Ice Plants, Cold Storage Plants g. Creameries. Bakeries, Food Processing Plants h. Hotel. Motel, Apartment Houses. Lodging Houses i. Dwellings j. Dry Cleaning Description a. Office Building b. Stores. Markets wholesale or retail) c. Hospitals, Sanitariums, Convalescent Hospital d. Nursing Homes. Child Nurseries e. Schools s.f. f. Churches, Assembly Buildings g. Amusement Park Structures h. Any Occupancy Not Listed $0.15 s.f. 15 s.f. 15 s.f. $ 0.07 s.f. 07 s.f. 07 s.f. 07 s.f. 07 s.f. 07 s.f. 07 s.f. 07 s.f. 07 s.f. 07 s.f. $ 0.05 s.f. 05 s.f. 05 s.f. 05 s.f. 05 05 s.f. 05 s.f. 05 s.f. a. Residential Accessory Building, Attached or Detached. Such As $ 0.03 s.f. Private Garages, Carports, Sheds, etc. b. Hotel. Motel, and Commercial Parking. Garages and Carports 03 s.f. c. Warehouses Up To and Including 5,000 s.f. 03 s.f. a. Warehouses Ttiat Part Which is Over 5.000 s.f $ 0.02 s.f. b. Storage Garages Where Work No Repair is Done 02 s.f. c. Aircraft Hangars Where No Repair Work Is Done 02 s.f. BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 19 30.2 Alterations and Additions. Where no structural work is being done. or where it is impractical to use the square footage schedule. $5.00 per circuit 30-3 Minimum Total Fee. $15.00 minimum For Any Type of Construction or Installation. 30.4 Fees. For Rxed Motors. Transformers. Generators. Heating and Cooking Appliances. etc. Converting all units to H.P. horse power), K.W. Kilowatt). K.V.A. Kilovolt ampere) fees shall be determined as follow: 1 Over 1. not over 5 9.00 Over 5. not over 20 Over 20. not over 50 Over 50. not over 100 Over 100, not over 500 Over 500. not over 1000 over 1000. not over... $ 6.00 11.00 17.00 21.00 32.00 45.00 62.00 30.5 a) Lighting Standards Less than 3 on a site 10.00 Each additional over 3 on a site 3.00 Lampholding devices, not a part of a lighting standard Festoon Type) Not over 50 12.00 Over 50. not over 100 22.00 Over 100 32.00 30.6 Signs and Outline Lighting One Sign and Gas Tube System Each Additional Sign or Gas Tube System Each Transformer or Ballast Each Motor or Flasher Each Lampholding Device in Connection with a Sign from 1 to 20 inclusive. next 100 each additional 10.00 7.00 3.00 3.00 30ea 15ea 08 ea BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 20 30.7 Temporary, Permanent or Construction Poles Tamporary, Underground and Work-With Services: Temporary Underground Services Temporary Work-With Service Residential) Temporary Work-With Service Commercial) 28.00 16.00 28.00 30.8 Miscellaneous Any electrical work for which a permit is required, but no fee is 15.00 herein provided 30.9 Annual Maintenance Electrician Fee for each annual Maintenance Permit. Fees for all work installed under such permit since date of last previous inspection shall be paid according to the above schedule at the time the annual permit is issued. Where plans are required and the service is over 400 amps, a plan check fee equal to 50% of the permit fee shall be paid at the time plans are submitted. Uniform Sign Code Fees Fees per Building Permit Fees BUILDING ATTACHMENT I Building Valuation Data SEE FOLLOWING PAGE INSERT Fees as Current BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 21 POLICE Processing Time By Section Processing Time by Patrol Officer: 40 minutes Steps Involved in Handling CHP 180: Request registration/Stolen Information Via Radio Inventory Vehicle/Complete CHP 180 Report Deliver Report to Police Station Log Report Into Report Ledger Attach Computer Printout to Report Processing Time In Communications: 4 minutes Steps Involved in Handling CHP 180: Run a Registration/Stolen Check Relay Registration Information to Held Officer Complete Log Card Telephone Tow Agency Complete Tow Ledger Processing Time by Watch Supervisor Sgt.): 5 minutes Steps Involved in Handling CHP 180: Review Report for Accuracy/Completeness Log report as Approved" in report ledger Assist Records/Approve Release of Vehicle Processing Time in Records Section: 46 minutes Steps Involved in Handling CHP 180: Processing: 5 minutes Accepting Report and Pull Case Folder Run 28/29 to Verify Information Notification: 10 minutes Complete Notification Form And Mail to R/0, UO and Storage Company File With Case Entry of Report: 10 minutes Enter Case and R/0 Into Computer System BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 22 Release: 10 minutes Check JDIC or Case Ledger for Case Number Verify R/0 Information and License Status Get Detective Approval for Release if Not Indicated by Patrol Complete Form for R/0 Signature Make Copy of Release for R/0 to Present to Storage Company Directions to Storage Company Refile Report Paperwork Not Current: 3 minutes Send New R/0 to DMV for Registration Update Send R/0 to DMV to Pay Expired Registration, Upon Return Perform Release' Again Phone Contact: 5 minutes Obtain License Number From R/0 Check JDIC or Case Ledger for Case Number Pull Case and Determine Cause of Storage Call OSJ Agency, for a Recovered Vehicle, for OK to Release Tell R/0 What is Necessary to Obtain Release Refile Case Notice of Impound Returned: 3 minutes Pull Case to Determine if Vehicle Has Been Released Mark Notification Form of Non-Release and Send Copy to DOJ Attach Returned Envelope to Original Storage Form Refile Case COMPENSATION RATES Position Police Officer Dispatcher Police Sergeant Records Clerk Hourly Rate* $ 15.93 11.30 19.38 9.36 Benefits** $8.44 3.96 10.27 3.28 Total $ 24.37 15.26 29.65 12.64 * 3rd Step Employee ** Sworn at 53%/Non-Sworn at 35% BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 23 Position Police Officer Dispatcher Police Sergeant Records Clerk TIME AND MOTION RATES Time Pay Rate Cost 40 minutes $ 24.37 $ 16.40 4 minutes 15.26 1.00 5 minutes 29.65 2.45 46 minutes 12.64 9.66 Total Cost $ 29.51 BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 1996 053 CC RESO(Ìì»zSCHEDULE OF FEES AND CHARGES PAGE 24 1N&EX Topic Page General Fees Community Center/Recreation Fees Engineering Fees Planning Fees Building Fees Police Fees 1 3 4-6 7-13 14- 15 16-20 + attachment 20- 23 BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04 SCHEDULE OF FEES AND CHARGES Sewer Installation: 12-0 V.C.P. 8-0 V.C.P. 6"0 V.C.P. Manhole Sewer Saddle Dye Test permittee to provide dye) PAGE 11 55.00 l.f 50.00 l.f. 45.00 l.f. 2000.00 ea 200.00 ea 150.00 ea UTILITY PERM ITS Trench Length Plan Check Fee Issuance and Inspection Fee Up to 50' Minimum $ 25 *Min. $ 75 City does A.C. Min. $ 100 Util. Co. does A.C. when directed 51'to 250' $25 + $.25 l.f 50' $100+ $ 50 l.f. 50' 251' to 1000' $50 + $ 15 l.f. 250' $200+ $ 40 l.f. 250' Over 1000' $165+ $ 05 l.f. 1000 $400+ $ 30 l.f. 1000 *Up to 200 s.f. add additional $4.00 s.f. for paving to be performed by the City. City to perform the paving unless otherwise directed by the Director of Public Works. NOTE: Fees applicable to work performed by both open trench and/or boring methods of installation. Non-Trench Work Plan Check Fee Issuance and Inspection Fee Up to 100 s.f. Minimum $25 Min. $75 City does A.C. Min. $125 Util. Co. does A.C. when directed Over 100 s.f. $25+ $ 30 s.f. 100 s.f. $12&4- $1.00s.f.> 100 s.f. Storm Drain Construction of New Catch Basin C.B.. Transition Structure. or Manhole M.H. Modification of the existing C.B. or M.H. Drain Pipe/Roof Drain Parkway Drain Storm Drain Mainline RCP) Storm Drain Lateral RCP) 3500.00 ea 2500.00 ea 20.00 l.f. 600.00 ea 130.00 l.f. 90.00 l.f. BIB] 37650-U01 1996-U02 053-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1166-U03 DO9340-U03 C6-U03 RESO-U03 1/28/2003-U04 ROBIN-U04