Loading...
HomeMy WebLinkAbout1999 080 CC RESO1999 080 CC RESO ×PÿÖ˜öRESO 99-80 OCT 6 1999[H%d8 RESOLUTION NO.99-80 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK, CALIFORNIA, AMENDING RESOLUTION NO. 98-86 SETTING FEES AND CHARGES FOR ISSUANCE, PROCESSING, AND FILING OF VARIOUS CITY SERVICES AND PERMITS IN THE CITY THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES RESOLVE AS FOLLOWS: SECTION 1. That Resolution No. 98-86 and all amendments hereto, in conflict herewith are hereby rescinded. SECTION 2. That the cost of issuing, processing and filing various city services and permits shall be in accordance with the attached Chart of Fees and Charges, marked Exhibit A", specifically those relating to the 1999 Building Valuation Table. SECTION 3. That said Chart of Fees and Charges shall become effective immediately. SECTION 4. That the City Clerk shall certify to the adoption of this Resolution and shall cause the same to be processed in the manner required by law. PASSED, APPROVED AND ADOPTED on this 6th day of October, 1999. ATTEST: STATE OF CALIFORNIA COUNTY OF LOS ANGELES 55. CITY OF BALDWIN PARK I, Rosemary M. Ramirez, Deputy City Clerk of the City of Baldwin Park, do hereby certify that the foregoing Resolution was duly and regularly approved and adopted by the City Council of the City of Baldwin Park at its regular meeting of the City Council held on October 6, 1999, by the following vote of the Council: AYES: COUNCILMEMBERS: Pacheco, Gair and Mayor Lozano NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: Van Cleave ABSTAIN: COUNCILMEMBERS: None BIB] 39038-U01 1999-U02 080-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1996-U03 DO2338-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 99-80-U05 OCT-U05 6-U05 1999-U05 1999 080 CC RESO ×PÿÖ˜ö Qq•go I RUILP.ING VALUATION O%ATA b• A I At the request of numerous building officials, ouilding Standards'" offers the following building valuation data representing average costs for 1: post buildings. Because residential buildings are the most common for many cities, two general classes are considered for these, one for average" construction and the other for good." Adjustments should be made for special architectural or suuctural features and the location of the project. Higher or lower unit costs may often result. The unit costs are intended to comply with the definition of valuation" in Section 223 of the 1997 Uniform Building Code'" and r thus include architectural, structural, electrical, plumbing and mechanical work, except as specifically listed below. The unit costs also include the contractor's profit, which should not be omitted. The determination of plan check fees for projects reviewed by the International Conference of Building Officials will be based on valuation I computed from these figures, which were established in April 1999. I Cost per Square Cost per S occupancy and Type Foot, Average Cost Per Square Occupancy and Type Foot, Average Occupancy and Typo Foot. Average occupancy and Type A"-+& L APARTMENT HOUSES: T. DWELLINGS: 13. JAILS: 20. RESUWRANTS: Type I or 11 FR. $82.20 Type V--Masonry $70.00 Type I or 11 FR. $147.10 Type III-1-Hour......... $90.20 Goad) $101.00 Good) $89.70 Type 111-1-Hour......... 134.40 Type III---N 87.10 Type V-Masonry Type V-Wood Frame.. 62.30 Type V-1-Hour.......... 100.90 Type V-1-Hour.......... 82.50 or Type 111)............. 67.20 Good) $85.50 Good) $82.10 Basements- 14. LIBRARIES: or 11 Type V--N.................. 79.40 Type V--Wood Frame.. 59.00 Semi-Finished 18.60 Type I or II FR. 107.70 2]. SCHOOLS: Good) $75.90 Good) $21.50 Type It--l-Hour 78.80 Type 1 or II FR............ 0 Type 1--Basement Garage 34.70 Unfinished.............. 13.50 T~ II"-d.................. 74.90 Type 11-1-our.......... 70 70.220 Good) $16.40 Type 111--l-Hour 83.20 Type 111-14-Hour......... 75.10 2. AUDITORIUMS: Type 111--N................. 79.00 Type 111-N......-.-...----- 72,30 I Type 1 or 11 FR. 97.00 8. FIRE STATIONS: Type V-1-Hour.......... 78.20 Type V-141our.......... 70.40 Type 11-1-Hour.......... 70.20 Type I or 11 FR. 105.90 Type V-N.................. 74.90 Type V-{V.................. 67.20 Type 11-N.................. 66.50 Type 11-1-Hour.......... 69.60 15. MEDICAL. OFFICES.. 22. SERVICE STATIONS: Type 111-1-Hour......... 73.80 Type 11-N.................. 65.70 Type I or II FR.*.......... 110.50 Type................... 62.20 Type 111-N................. 70.00 Type III-i-Hour......... 76.30 Type II-1-Hour.......... 85.30 Type p1-1-Hour......... 64.80 Type V-1-Hour.......... 70.60 Type Ifl-N................. 73.00 Type II-IV.................. 8L00 Type V-1-Holx.......... 55.20 Type V-N.................. 65.90 Type V-1-Hour.......... 7L40 Type III-1-Hour......... 89.80 Canopies...........---..... 25.90 Type V-N.................. 67.90 3. BANKS: Type IIF---IV................. 86.20 23. STORES: Type 1 or If FR.*.......... 136.90 9. HOMES FOR THE ELDERLY Type V-1-Hour.......... 83.40 Type I or N FR.*.......... 76.30. Type 11--l-Hour 100.90 Type 1 or 11 FR. 96.00 Type V-N.................. 80.50 Type d-1-Hotx.......... 46.70 Type 11-N.................. 97.70 Type 11-1-Hour.......... 78.00 Type M-1-Hour 111.40 Type 11-~1.................. 74.60 i~ T tl FR.*.......... 98.70 Ty Type pe 111-1-Hour 56.70 Type III--N................. 107.40 Type 111--l-Hour 8L10 Type II-1-Hour.......... 66.20 Type U.................. 53.20 Type V-1-Hour.......... 100.90 Type III--IV................. 77.90 Type II---N.................. 63.00 Type V-1-Hour.......... 47.80 Type V-N~~* 96.70 Type V-1-Hour.......... 78.50 Type 111-1-Hour......... 7L40 Type V-N.................. 44.20 4. BOWLING Type V-N........................ 75.70 Type N.................. 68.20 24. Ti#JITERS, Type II-1-Hour.......... 47.20 10. HOSPITALS: Type I or b. FR. 1OL60 Type 1................... 44.10 Type I or II FR.*.......... 151.00 Type V-N f 63.00 Type 111--l-Hour......... 5L30 Type III-i-Hour......... 125.00 Type Nl MI--IV 70.40 17. PRIVATE GARAGES. Type 1-~......... 74.00 Type III-N................. 48.10 Type V-1-Hour.......... 119.20 Wood Frame............... 22.50 Type V-1-Hour.......... 69.70 Type V-1-Hour.......... 34.70 11. HOTELS AND MOTELS: Masonry..................... 25.40 Type V-N.... 65.90 5. CHURCHES: Type 1 or 11 FR.*.......... 93.50 Open Carpets............ 15.30 25. WAREHOUSES***- Type I or 11 FR............ 91.80 Type 111-1-Hour......... 80.90 18. pUBW BUILDINGS: Type 1 or I FR............ 45.70 Type 11-1-Hour.......... 68.90 Type 111................. 77.20 Type I or N FR.*.......... 114.10 Type I or V-1-Fiour... 27.10 Type 11-N.................. 65.50 Type V-1-Hour.......... 70.40 Type 11-i-Hour.......... 92.40 Type N or V-N...»...... 25.550. Type Iii-l-Hour..... 74.90 Type V-N.................. 69.00 Type I................... 88.40 Type NF-14iatu......... 30.80 Type III-N................. 71.60 12. INDUSTRIAL PLANTS: Type 111-1-Hour......... 96.00 Type N.................. 29.40 Type V-1-HOW.......... 70.00 Type I or 11 FR. 52.70 T 11............... EQUIPMENT Type V-N.................. 65.90 Type 92.60 AIR CONDITIONING: 6. CONVALESCENT HOSPITALS: Type II-1-Hour.......... 36.70 Type V-i-Hour.......... 87.90 Type 11-N............. 33.70 Type V--aV.................. 84.70 Commercial 3.80 Type I or II FR.*....,..„. 128.70 Type III-1-Hour 40,40 Type 11-1-Hour.......... 89.30 T III-N.........-..... 19. PUBLIC GARAGES: Type 38.00 Type I or 11 FR.*.......... 45.20 SPRINKLER 3.20 Type III-i-Hour......... 91.60 Tilt-up................ 27.60 SYSTEMS.. 2.4 Type I or 11 Open P......g*34,00 Type V-1-Hour 86.40 Type V-1-Hour.......... 38.00 Type 11-N.................. 26.50 Type V-N.................. 34.90 Type 111-1-Hour 34.30 Type 111................. 30.50 Type V-1-Hour......„.. 31.20 Add 0.5 percent to total cost for each story over three. **Deduct 20 percent for shell-only buildings. ***Deduct i1 percent for mini-warehouses. REGIONAL MODIFIERS The following modifiers are recommended for use in conjunction with the building valuation data. Additionally, certain local conditions may require further modifications. To use these modifiers, merely multiply the listed cost per square foot by the appropriate regional modifier. For example, to adjust the cost of a Type III One-hour hotel building of average construction for the Iowa area, select Regional Modifier 0.80 and unit cost from valuation data, $80.90: 0.80 x 80.90 $64.72 adjusted cost per square foot) Eastern U.S. Modifier Eastern U.S. cont.) Modifier Central U.S. cont.) Modifier Western U.S. Mph Connecticut..........„.„,_„„„, 0.95 Pennsylvania Kansas............................... 0.74 Alaska................................ L30 Delaware............................ 0.84 Philadelphia.................... 0.96 Kentucky............................ 0.77 Arizona............................... 0.82 District of Columbia............. 0.87 Other............................. 0.83 Louisiana............................ 0.78 California Florida 0.74 Rhode Island 0.94 Michigan 0.84 Los Angeles.................... 1.00 0.68 South Carolina.................... 0.70 Minnesota.......................... 0.86 San Francisco................. L13 Maine................................ 0.81 Vermont.......................... 0.80 Mississippi.......................... 0.71 Other 1 0.94 Maryland............................ 0.79 Virginia............................... 0.73 Missouri............................. 0.78 Colorado * 0.81 Massachusetts.................... 0.94 West Virgjnia....................... 0.82 Nebraska............................ 0.75 Hawaii.............-.-.--_-„,...„,., L14 New Hampshire 0.82 North Dakota...................... 0.80 Idaho 0.80 New Jersey......................... 0.91 0.80 Montana 0.79 Central U.S. Ohio New York Alabama............................. 0.72 Oklahoma........................... 0.71 Nevada 0.89 New York City.................. 1.16 Arkansas 0.70 South Dakota 0.78 New Mexico........................ 0.76 Other............................. 0.87 Illinois................................ 0.87 Tennessee.......................... 0.72 Oregon............................... 0.83 North Carolina 0.70 Indiana............................... 0.82 Texas 0.74 Utah 0.75 Iowa 0.80 Wisconsin........................... 0.85 Washington 0.88 Wyoming............................ 0.80 BIB] 39038-U01 1999-U02 080-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO1996-U03 DO2338-U03 C6-U03 RESO-U03 10/10/2001-U04 ADMIN-U04 RESO-U05 99-80-U05 OCT-U05 6-U05 1999-U05