Loading...
HomeMy WebLinkAbout2000 063 CC RESO2000 063 CC RESO(Ìì¦rRESOLUTION NO. 2000-063 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK AMENDING RESOLUTION NO. 2000-039 SETTING FEES FOR ISSUANCE. PROCESSING AND FILING OF VARIOUS CITY SERVICES AND PERMITS IN THE CITY, SPECIFICALLY THOSE RELATING TO BUILDING FEES THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES RESOLVE AS FOLLOWS: SECTION 1. That Resolution No. 2000-039 and all amendments hereto, in conflict herewith are hereby rescinded. SECTION 2. That the cost of issuing, processing and filing various city services and permits shall be in accordance with the attached Chart of Fees and Charges, marked Exhibit A". specifically those relating to building fees. SECTION 3. That said Chart of Fees shall become effective immediately. SECTION 4. That the City Clerk shall certify as to the adoption of this Resolution and shall cause the same to be processed in the manner required by law. APPROVED AND ADOPTED this 20th day of June. 2000 MANUEL LOZANO, MAYOR BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦rResolution No. 2000-063 Page 2 ATTEST: STATE OF CALIFORNIA COUNTY OF LOS ANGELES ss. CITY OF BALDWIN PARK 1. Rosemary M. Ramirez. Deputy City Clerk of the City of Baldwin Park do hereby certify that the foregoing resolution was duly and regularly passed and adopted by the City Council of the City of Baldwin Park at its regular meeting held June 20. 2000. by the following vote of the Council: AYES COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSTAIN: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: Linda Gair. Marlen Garcia, Bill Van Cleave, Mayor Pro Tern Ricardo Pacheco and Mayor Manuel Lozano None None None Rosema»7 M. Ramirez Deputy City Clerk BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦rEXHIBIT A" ATTACHMENT BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦rSCHEDULE OF FEES AND CHARGES PAGE 16 BUILDING FEES Building Fees AEIHB & S Occupancies*) 1. Permit Fee: Valuation fees see BUILDING ATTACHMENT I) 2. Plan Check Fees: * Plan check fee is 85% of the building permit fee, with a minimum t $82.00. * Handicapped plan check fee is 5% of the building permit fee. * Plan check fees will not be charged for re-roofing or air conditioning when plans are not required. * For R1. R3 & U Occupancies, use 80% of the fee tables above. Building Permits Re-inspection $75.00 Certificate of Occupancy Original No Charge Certificate of Occupancy Subsequent 50.00 Certificate of Occupancy Temporary 65.00 Request for Address Change 750.00 Garage Conversion Valuation 1st Time) + $3,000 for ea. Time after) 3.000.00 Example: 2nd time $6.000 Extension of Permit One Time) 25.00 Special Occupancy Full House) 120.00 Occupancy Groups R or U Special Occupancy Inspection Other Than Above 150.00 Re-inspection For Excessive More Than 3) Plan Checks 75.00 Building Regulations Variance Filing and Processing Fee $75.00 Energy Conservation Regulation Plan Check and Permit Fee 20% of total of building permit and plan check fee Uniform Plumbing Code For Issuing Each Permit $35.00 In Addition: For each plumbing fixture or trap or set of fixtures on one trap 14.40 including water, drainage, piping and backflow protection thereof For each building sewer and each trailer park sewer 18.00 Rainwater Systems per drain 14.40 For each sewer connection 48.00 For each private sewage disposal system 36.00 For each sewer cap 14.40 For each water heater and/or vent 14.40 BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦rSCHEDULE OF FEES AND CHARGES PAGE 17 Description For each gas piping system of one 1) to five 5) outlets For each gas piping system of six 6) or more, per outlet For each industrial waste pre-treatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps. For installation, alteration or repair of water piping and/or water treating equipment For repair or alteration of drainage or venting piping For each lawn sprinkler system or any one meter including backflow protection devices therefor For vacuum breakers or backflow protective devices on tanks, vats. etc., or for installation on unprotected plumbing fixtures including necessary water piping one of five. Over five. each Plumbing Re-inspection Fee Uniform Mechanical Code Heating Appliance Relocate or Replace Vent Contort Cooling Under 10.000 BTU Over 10,000 BTU Compressor or Boiler Under 3 H.P. Compressor or Boiler Over 3 H.P. to 15 H.P. Over 15 H.P. to 30 H.P. Over 30 H.P. to 50 H.P. Over 50 H.P. Gas System Vent Fan Hoods Miscellaneous Permit Fee Re-inspection Fee Uniform Swimming Code $14.40 3.60 18.00 18.00 14.40 14.40 18.00 3.60 $75.00 $18.00 14.40 18.00 24.00 18.00 21.60 42.00 74.40 104.00 14.40 18.00 18.00 18.00 35.00 75.00 Fees Per Building Permit Fee BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦rSCHEDULE OF FEES AND CHARGES PAGE 18 Electrical Code 30.01 Fees New Construction and Additions Permit Issuance Fee $35.00 + fee for each schedule in Section 30.4 + $.06 per ampere for each service switch 600 volts or less; $.03 per ampere for each additional service switch in excess of 600 volts. In addition the following fees shall apply to each type of construction: a. Gasoline Service Station Buildings b. Drinking or Dining Establishments c. Power Plants Pumping Plants a. Woodworking Establishments, Planning Mills b. Steel Mills, Factories c- Manufacturing Plants, Assembly Plants d. Gasoline Service Station Open Canopies e. Repair Garages, Aircraft Repair Hangar f. Ice Plants. Cold Storage Plants g. Creameries. Bakeries, Food Processing Plants h. Hotel, Motel, Apartment Houses. Lodging Houses i. Dwellings j. Dry Cleaning Description a. Office Building b. Stores, Markets wholesale or retail) c. Hospitals, Sanitariums. Convalescent Hospital d. Nursing Homes. Child Nurseries e. Schools f. Churches. Assembly Buildings g. Amusement Park Structures h. Any Occupancy Not Listed a. Residential Accessory Building, Attached or Detached, Such As Private Garages, Carports. Sheds, etc. b. Hotel, Mote, and Commercial Parking. Garages and Carports c. Warehouses Up To and Including 5,000 s.f. a- Warehouses That Part Which is Over 5,000 s.f- b. Storage Garages Where Work No Repair is Done c Aircraft Hangars Where No Repair Work is Done $0.18 s.f. 0.18 s.f. 0.18 s.f. $ 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. $ 0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s.f. $ 0.04 s.f. 0.04 s.f. 0.04 s.f. $ 0.03 s.f. 0.03 s.f. 0.03 s.f. BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦rSCHEDULE OF FEES AND CHARGES PAGE 19 30.2 Alterations and Additions Where no structural work is being done. or where it is impractical to use the square footage schedule. $6.00 per circuit 30.3 Minimum Total Fee $18.00 minimum For Any Type of Construction or Installation. 30.4 Fees For Fixed Motors, Transformers, Generators, Heating and Cooking Appliance, etc. Converting all units to H.P. horse power), K.W. kilowatt), K.V.A. kilovolt ampere) fees shall be determined as follow 1 Over 1, not over 5 Over 5, not over 20 Over 20. not over 50 Over 50.not over 100 Over 100,not over 500 Over 500, not over 1000 Over 1000, not over... 30.5 a) Lighting Standards Less than 3 on a site Each additional over 3 on a site Lampholding devices, not a part of a lighting standard Festoon Type) Not over 50 Over 50. no over 100 Over 100 30.6 Signs and Outline Lighting One Sign and Gas Tube System Each Additional Sign or Gas Tube System Each Transformer or Ballast Each Motor or Flasher Each Lampholding Device in Connection with a Sign From 1 to 20 inclusive. Next 100 Each additional $7.20 10.80 13.20 20.40 25.20 38.40 54.00 74.20 $12.00 3.60 14.40 26.40 38.40 $12.00 8.40 3.60 3.60 36 ea. 18ea. 10ea. BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦rSCHEDULE OF FEES AND CHARGES PAGE 20 30.7 Temporary, Permanent or Construction Poles Temporary, Underground and Work-With Services: Temporary Underground Services Temporary Work-With Service Residential) Temporary Work-With Service Commercial) $35.00 35.00 35.00 30.8 Miscellaneous Any electrical work for which a permit is required, but no fee is herein provided $18.00 30.9 Annual Maintenance Electrician Fee for each annual Maintenance Permit Fees for all work installed under such permit since date of last previous inspection shall be paid according to the above schedule at the time the annual permit is issued. Where plans are required and the service is over 400 amps, a plan check fee equal to 60% of the permit fee shall be paid at the time plans are submitted. Uniform Sign Code Fees Fees per Building Permit Fees Building Valuation Data Fees as Current BUILDING ATTACHMENT I SEE FOLLOWING PAGE INSERT BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦r VALUATION $0 700.00 $700.00-1.999.00 $2,000.00 $3,000.00 $4.000.00 $5,000.00 $6,000.00 $7.000.00 $8.000.00 $9.000.00 $10,000.00 $11.000.00 $12.000.00 $13,000.00 $14,000.00 $15,000.00 $16,000.00 $17.000.00 $18,000.00 $19,000.00 $20.000.00 $21.000.00 $22.000.00 $23.000.00 $24.000.00 $25,000.00 $26.000.00 $27.000.00 $28.000.00 $29,000.00 $30.000.00 $31,000.00 $32,000.00 $33,000.00 $34,000.00 $35.000.00 $36.000.00 $37.000.00 $38,000.00 $39,000.00 $40,000.00 $41.000.00 $42.000.00 $43.000.00 $44.000.00 $45,000.00 $46,000.00 RESIDENTIAL PLAN CHECK R1,R3,U $24.04 $36.10 $46.39 $56.68 $66.97 $77.26 $87.55 $97.85 $108.13 $118.43 $128.71 $139.01 $149.30 $159.59 $169.88 $180.17 $190.46 $200.76 $211.04 $221.34 $231.62 $241.92 $252.22 $262.50 $272.80 $283.08 $291.23 $299.36 $307.57 $315.65 $323.78 $331.93 $340.07 $348.22 $356.35 $364.49 $372.64 $380.77 $388.92 $397.06 $405.19 $413.34 $421.48 $429.62 $437.76 $445.90 $454.04 BLDG PERMIT R1,R3,U $30.05 $45.12 $57.98 $70.85 $83.71 $96.58 $109.44 $122.30 $135.17 $148.03 $160.90 $173.76 $186.62 $199.49 $212.35 $225.22 $238.08 $250.94 $263.81 $276.67 $289.54 $302.04 $315.26 $323.13 $340.99 $353.86 $364.03 $374.21 $384.38 $394.56 $404.74 $414.91 $425.09 $435.26 $445.44 $455.62 $465.79 $475.97 $486.14 $496.32 $506.50 $516.67 $526.85 $537.02 $547.20 $557.38 $567.55 BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦r VALUATION $47.000.00 $48,000.00 $49.000.00 $50,000.00 $51.000.00 $52,000.00 $53.000.00 $54.000.00 $55.000.00 $56.000.00 $57,000.00 $58.000.00 $59.000.00 $60.000.00 $61,000.00 $62,000.00 $63,000.00 $64,000.00 $65.000.00 $66.000.00 $67,000.00 $68.000.00 $69.000.00 $70,000.00 $71.000.00 $72.000.00 $73.000.00 $74.000.00 $75,000.00 $76.000.00 $77,000.00 $78.000.00 $79,000.00 $80,000.00 $81.000.00 $82.000.00 $83.000.00 $84.000.00 $85,000.00 $86.000.00 $87.000.00 $88,000.00 $89.000.00 $90,000.00 $91.000.00 $92.000.00 $93.000.00 $94.000.00 $95.000.00 PLAN CHECK R1.R3.U47 $462.18 $470.33 $478.46 $486.60 $492.60 $498.59 $504.58 $510.56 $516.55 $522.55 $528.54 $534.53 $540.52 $546.50 $552.50 $558.49 $564.48 $570.47 $576.46 $582.46 $588.44 $594.43 $600.42 $606.41 $612.41 $618.40 $624.38 $630.37 $636.36 $642.36 $648.35 $654.34 $660.32 $665.31 $672.31 $678.30 $684.29 $690.27 $696.26 $702.26 $708.25 $714.24 $720.23 $726.22 $732.22 $738.20 $744.19 $750.18 $756.17 BLDG PERMIT R1,R3,U $577.73 $587.90 $598.08 $608.26 $615.74 $623.23 $630.72 $638.21 $645.70 $653.18 $660.67 $668.16 $675.65 $683.14 $690.14 $698.11 $705.60 $713.08 $720.58 $728.06 $735.55 $743.04 $750.53 $758.02 $765.50 $772.99 $780,48 $787.97 $795.46 $802.94 $810.43 $817.92 $825.41 $832.90 $840.38 $847.87 $855.36 $862.85 $870.34 $877.82 $885.31 $892.80 $900.29 $907.78 $915.26 $922.75 $930.24 $937.73 $945.22 BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦r VALUATION $96.000.00 $97.000.00 $98.000.00 $99.000.00 $100,000.00 PLAN CHECK R1,R3,U $762.17 $768.16 $774.14 $780.13 $786.12 BLDG PERMIT R1,R3,U $952.70 $960.19 $967.68 $975.17 $982.66 BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦r 2000 063 CC RESO(Ìì¦r VALUATION $0-700.00 $701.00-2,000.00 $2,000.00 $3.000.00 $4.000.00 $5.000.00 $6.000.00 $7.000.00 $8.000.00 $9.000.00 $10,000.00 $11.000.00 $12,000.00 $13.000.00 $14.000.00 $15.000.00 $16.000.00 $17.000.00 $18,000.00 $19.000.00 $20.000.00 $21.000.00 $22.000.00 $23.000.00 $24.000.00 $25,000.00 $26.000.00 $27,000.00 $28,000.00 $29,000.00 $30.000.00 $31.000.00 $32,000.00 $33,000.00 $34.000.00 $35.000.00 $36,000.00 $37.000.00 $38.000.00 $39,000.00 $40.000.00 $41,000.00 $42,000.00 $43.000.00 $44.000.00 $45,000.00 $46,000.00 COMMERCIAL PLAN CHECK AEIHB & S $82.00 $82.00 $61.61 $75.28 $88.94 $102.61 $116.28 $129.95 $143.62 $157.28 $170.95 $184.62 $198.29 $211.96 $225.62 $239.29 $252.96 $266.63 $280.30 $293.96 $307.63 $321.30 $334.97 $348.64 $362.30 $375.97 $386.78 $397.60 $408.41 $419.22 $430.03 $440.84 $451.66 $462.47 $473.28 $484.09 $494.90 $505.72 $516.53 $527.34 $538.15 $548.96 $559.78 $570.59 $581.40 $592.21 $603.21 BLDG PERMIT AEIHB & S $37.56 $56.40 $72.48 $88.56 $104.64 $120.72 $136.80 $152.88 $168.96 $185.04 $201.12 $217.20 $233.28 $249.36 $265.44 $281.52 $297.60 $313.68 $329.76 $345.84 $361.92 $378.00 $394.08 $410.16 $426.24 $442.32 $455'.04 $467.76 $480.48 $493.20 $505.92 $518.64 $531.36 $544.08 $556.80 $569.52 $582.24 $594.96 $607.68 $620.40 $633.12 $645.84 $658.56 $671.28 $684.00 $696.72 $709.44 BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦rVALUATION $47,000.00 $48.000.00 $49.000.00 $50.000.00 $51,000.00 $52.000.00 $53.000.00 $54.000.00 $55,000.00 $56,000.00 $57.000.00 $58.000.00 $59.000.00 $60.000.00 $61.000.00 $62.000.00 $63.000.00 $64.000.00 $65.000.00 $66,000.00 $67,000.00 $68.000.00 $69.000.00 $70.000.00 $71.000.00 $72,000.00 $73,000.00 $74.000.00 $75.000.00 $76.000.00 $77.000.00 $78.000.00 $79.000.00 $80,000.00 $81.000.00 $82,000.00 $83,000.00 $84.000.00 $85.000.00 $86.000.00 $87.000.00 $88.000.00 $89.000.00 $90,000.00 $91,000.00 $92.000,00 $93.000.00 $94.000.00 $95.000.00 PLAN CHECK AEIHB & S $613.84 $624.65 $635.46 $646.27 $654.23 $662.18 $670.14 $678.10 $686.05 $694.00 $701.96 $709.92 $717.88 $725.83 $733.79 $741.74 $749.70 $757.66 $765.61 $773.57 $781.52 $789.48 $797.44 $805.39 $813.35 $821.30 $829.26 $837.22 $845.17 $853.13 $861.08 $869.04 $877.00 $884.95 $892.91 $900.86 $908.82 $916.78 $924.73 $932.69 $940.64 $948.60 $956.56 $964.51 $972.47 $980.42 $988.38 $996.34 $1.004.29 BLDG PERMIT AEIHB & S $722.16 $734.88 $747.60 $760.32 $769.68 $779.04 $788.40 $797.76 $807.12 $816.48 $825.84 $835.20 $844.56 $853.92 $863.28 $872.64 $882.02 $891.36 $900.72 $910.08 $919.44 $928.80 $938.16 $947.52 $956.88 $966.24 $975.60 $984.96 $994:32 $1.003.68 $1.013.04 $1.022.40 $1.037.76 $1.041.12 $1,050.48 $1,059.84 $1.069.20 $1.078.56 $1.087.92 $1.097.28 $1,106.64 $1,116.00 $1,125.36 $1.134.72 $1.144.08 $1.153.44 $1,162.80 $1.172.16 $1.181.52 BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦rVALUATION $96.000.00 $97.000.00 $98.000.00 $99.000.00 $100,000.00 PLAN CHECK AEIHB & S $1,012.25 $1,020.20 $1,028.16 $1,036.12 $1,044.07 BLDG PERMIT AEIHB & S $1.190.88 $1.200.24 $1.209.60 $1.218.96 $1.228.32 BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦rState of California Department of Conservation Resources Agency Division of Mines and Geology Fee Schedule Strong-Motion Instrumentation and Seismic Hazard Mapping Fee Category 2 Construction* Method 1. The fee amount can be calculated from the permit valuation amount using the formula: Valuation Amount) X 0.00021 Fee Amount As an example, the fee for a $1,231,890 valuation is $1,231.890 x 0.00021 or $258.70 Method 2. As an alternative to Method 1, the fee for a given valuation can be calculated using the following table, as illustrated below: Valu. Fee Valu. Fee Valu. Fee Valu. Fee Valu. Fee $0-100 $0.02 $1,000 $0.21 $10.000 $2.10 $100.000 $21.00 $1.000.000 $210.00 200 0.04 2.000 0.42 20.000 4.20 200.000 42.00 2.000.000 420.00 300 0.06 3.000 0.63 30.000 6.30 300.000 63.00 3.000.000 630.00 400 0.08 4.000 0.84 40.000 8.40 400.000 84.00 4.000.000 840.00 500 0.11 5,000 1.05 50.000 10.50 500.000 105.00 5.000.000 1.050.00 600 0.13 6.000 1.26 60.000 12.60 600.000 126.00 6.000.000 1.260.00 700 0.15 7.000 1.47 70.000 14.70 700,000 147.00 7.000.000 1.470.00 800 0.17 8.000 1.68 80.000 16.80 800.000 168.00 8.000.000 1.680.00 900 0.19 9.000 1.89 90.000 18.90 900.000 189.00 9.000.000 1.890.00 The fee amount can be obtained by breaking the evaluation amount into parts and using the entries in this table. An example for a permit valuation of $1.231.890 is shown at the right: $1.000.000 $210.00 200.000 42.00 30.000 6.30 1.000 0.21 800 0.17 90 0.02 $1.231.890 $258.70 Fee Amount Notes: 1) The minimum fee is 50 cents, so the fee for any valuation up to $2,381 is simply $.50. 2) Category 2 includes all buildings not in Category 1. For example. Category 2 includes residential buildings over 3 stories, all office buildings, warehouses, factories and other manufacturing or processing facilities, restaurants, and other non-residential buildings. 3) A building" is defined as a structure built for the support, shelter or enclosure of people, animals or property. Pg. 2 of 2 9/92 BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 2000 063 CC RESO(Ìì¦rBUILDING VALUATION DATA me request of numerous building officials, Building Standards'" offers the following building valuation data representing average costs for uuddin^. Because residential buildings drc the most common for many cities, two general classes are considered for these, one for average" onstruction and the other for good Adjustments should be made for special architectural or structural features and the location of the project. Higher or lower unit costs may often result. The unit costs are intended to comply with the definition of valuation" in Section 223 of the 1997 Uniform Building Code'" and thus include architectural, structural, electrical, plumbing and mechanical work, except as specifically listed below The unit costs also include the contractor's profil, which should not be omitted The determination of plan check fees for projects reviewed by the International Conference of Building Officials will be based on valuation computed from these figures, which were established in April 2000. Cost per Square Foot, Average Occupancy and Type 1 APARTMENT HOUSES: Type I or 11 F.R.*.......... S83 00 Good) $102.00 Type V—Masonry or Type 1H)......... 67.80 Good) $82.90 Type V—Wood Frame. 59 60 Good) $76.60 Type Basement Garage 35 00 2. AUDITORIUMS: Type! or II F.R. 9790 Type lf—1-Hour. 70.90 Type II—N.................. 67 10 Type 111—1-Hour. 74 50 Type 111—N 70.70 TypeV 1-Hour.......... 7130 TypeV—N 66.50 3. BANKS: Type I or 11 F.R.*.......... 13826 Type 11—1-Hour.......... 10190 Type 11—N.................. 98.60 Type III—1-Hour......... 11250 Type 111—N 10840 Type V—1-Hour.. 101.90 Type V—N.................. 97.60 4. BOWLING ALLEYS: Type II—1-Hour.......... 47.60 Type II—N........... 44.50 Type III—1-Hour......... 51.80 Type 111—N................. 48.50 TypeV—1-Hour..-....- 35.00 5.CHURCHES: Type I or 11 F.R............ 92.70 Type II—1-Hour.......... 69.50 Type 11—N 66.10 Type HI—1-Hour..... 75.60 Type IH—N................. 7230 Type V—1-Hour.......... 70.70 Type v—N.................. 66.50 6. CONVALESCENT HOSPITALS: Type I or II F.R.*.... 130.00 Type II—1-Hour.......... 90 20 Type 111—1-Hour......... 92 50 Type V—1-Hour..... 87 20 Cost per Square Foot, Average Occupancy and Type 7. DWELLINGS: TypeV- Masonry S70 70 Good) $90.50 Type V—Wood Frame 62.90 Good) S86.30 Basements— Semi-Finished 38.80 Good) S21.70 Unfinished 13 60 Good) 16 60 8. FIRE STATIONS: Type I or 11 F.R. 10690 Type 11—1-Hour.. 7030 Type II N. 6630 Type 111- 1-Hour.. 7700 Type 111—N 73.70 TypeV-1-Hour 7220 lype V N 68.50 9. HOMES FOR THE ELDERLY: Type I or II F.R 96 90 Type 11 1-Hour.. 78.70 Type li—N. 75.30 Type III—1-Hour 81.90 Type 111—N....... 78.60 Type V—1-Hour...... 79.20 Type V—N.... 76.40 10. HOSPITALS: Type I or 11 FR *. 152.50 Type III—1-Hour....... 126.20 TypeV—1-Hour........ 120.40 11. HOTELS AND MOTELS: Type I or II F.R *....... 94.40 Type 111-1-Hour. 81.70 Type 111—N............... 77.90 TypeV—1-Hour.......... 7120 TypeV- N...... 69.70 12. INDUSTRIAL PLANTS: Type I or II F.R.... 53.20 Type II—1-Hour... 3700 Type 11--N 3400 Type 111-1-Hour.. 40.80 Type III N...... 38.40 Tilt-up 2800 Type V-1-Hour 3840 Type V—N 35 20 Cost per Square Occupancy and Type Foot. Average 13. JAILS: Type I or II F.R $148.60 Type 111 1-Hour..... 135.90 Type V—1-Hour.... 101.90 14. LIBRARIES: Type lor II FR 108 70 Type II—1-Hour........ 79 50 Type II—N. 75.60 Type 111-1-Hour 8400 Type lll—N 79.80 TypeV'-l-Hour 79.00 Type V—N. 7560 15. MEDICAL OFFICES: Type I or II F.R.*.. 111.60 Type 11—1-Hour 86 10 Type 11---N........ 81.80 Type III-1-Hour. 90.70 Type III—N 87.00 Type V—1-Hour. 8420 TypeV-N.... 81.30 16. OFFICES**: Type I or 11 F.R."... 99.70 Type II—1-Hour...... 66.80 Type II—N............... 63.60 Type III—1-Hour......... 72.10 Typelll—N... 69.00 Type V—1-Hour....... 67.50 Type V—N................ 6360 17. PRIVATE GARAGES: Wood Frame............ 22.70 Masonry.......... 2560 Open Carports........ 15.50 18. PUBLIC BUILDINGS: Type lor II F.R.*..... 115.20 Type II—1-Hour.......... 93.30 Type 11—N........ 89.20 TypelH—1-Hour 97.00 Typelll—N..... 9350 Type V—1-Hour... 88 70 Type V—N......... 85.50 19. PUBLIC GARAGES: Type I or II F.R.* 45 70 Type I or 11 Open Parking* 34 30 Type II—N... 26.20 lype III-1-Hour 34.60 Type II—N 30.80 Type V-1-Hour 31 50 Cost per Square Foot, Average Occupancy and Type 20. RESTAURANTS: Type 111—1-Hour. $9100 Type 111—N............... 87.90 Type V—1-Hour......... 83 30 Type V—N. 8000 21. SCHOOLS: Type I or 11 F.R.. 103.90 Type 11 1-Hour 70.90 Type IH—1-Hour. 7580 Type 111 N 73.00 Type V—1-Hour 71 10 TypeV—N 6780 22- SERVICE STATIONS: Type II—N........ 62.80 Type III—1-Hour 65 40 TypeV 1-Hour 55.70 Canopies..... 26.20 23. STORES: Type I or II FR 77.00 Type II- 1-Hour 47 10 Type 11—N....... 46.00 Type III—1-Hour..... 5730 Type 111—N 53 70 Type V—1-Hour.......... 48.20 Type V—N......... 44.60 24. THEATERS: Type I or 11 F.R.. 102.60 Type 111—1-Hour..... 74.70 Type 111—N... 71.20 Type V 1-Hour 70.30 TypeV—N.......... 66.50 25. WAREHOUSES***: Type I or 11 F.R.. 46 10 Type llorV—1-Hour.. 27.40 Type II or V—N.. 25.80 Type 111—1-Hour.. 31.10 Type Itl—N 29.60 EQUIPMENT AIR CONDITIONING- Commercial... 3.90 Residential. 3.30 SPRINKLER SYSTFMS. 2.45 Add 0 5 percent to total cost for eacr" story over three **Deduci 20 percent for shell-only buildings Deduct 11 percent for m'ni-warer'ouses REGIONAL MODIFIERS The following modifiers are recommended for use in conjunction with the building valuation data. Additionally, certain local conditions may require further modifications To use these modifiers, merely multiply the listed cost per square foot by the appropriate regional modifier. For example, to adjust the cos' of a Type III One-hour hotel building of average construction for the fowa area. select Regional Modifier 0.80 and unit cost from valuation data. S81 70 0.80 x 81 70 S6b 36 adjusted cost per square foot) Eastern U.S. Modifier Eastern U.S. cont.) Modifier Central U.S. cont.) Modifier Western U.S. Modifier Connecticut. 095 Pennsylvania Kansas 0 74 Alaska 1.30 Delaware. 084 Philadelphia 096 Kentucky... 0 77 Arizona 082 District of Columbia..... 0.87 Other. 083 louisiana 0./8 California flondd 0 74 Rhode Ibldnd 094 Michigan 0.84 Los Angeles 3.00 Georgia 068 South Carolir'.d 0 /O Minnesota 086 S()n fr^ncisro Dr,v Area 1 13 Maine 081 Vermoi'i 080 Mississippi 0 /-I Other 0.94 Maryland 0 7^ Virginia 0 73 Missouri 0 /8 Colorado 081 \'1dssachusetlb 094 West Virginia 082 Nebojskd 0 Hdwan 1 14 New Hampshire 08? Nonh Ddkota 080 Idaho.. 080 fw jersey. 091 Central U.S. Ohio 080 Montana 0 79 w York Alabama 0 7? Oklahoma 0./1 Nevada. 089 New York City.... 1 16 Arhdnsas 0 /O South Ddkota 0 78 New Mexico 076 Other 087 Illinois 08/ Tennessee.... 072 Oregon 0.83 Nonh Carolina 070 Indiana 082 Texd-s 0 74 Utah 0 75 low.) 080 Wisconsin 085 Washington 088 Wyoming 080 BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04 State of California Department of Conservation Resources Agency r:''."1 Division of Mines and Geology Fee Schedule Strong-Motion Instrumentation and Seismic Hazard Mapping Fee Category 1 Construction 1 to 3 Story Residential)* Method 1. The fee amount can be calculated from the permit valuation amount using the formula: Valuation Amount) X 0.0001 Fee Amount As an example, the fee for a $128,580 valuation is $128,580 x 0.0001 or $12.86 Method 2. As an alternative to Method 1, the fee for a given valuation can be calculated using the following i; sine. table, as illustrated below: Valu. Fee Valu. Fee Valu. Fee Valu. Fee /Valu. Fee /siu; $0-100 $0.01 200 0.02 300 0.03 400 0.04 600 0.05 600 0.06 700 0.07 800 0.08 900 0.09 $1.000 / $0.10 2.000 0.20 3.000 0.30 4,000 0.40 6.000 0.60 6,000 0.60 7.000 0.70 8.000 0.80 9.000 0.90 $10.000. $1.00 20,000/, 2.00; 30.000. 3.00; 40,000 4.00 60,000 6.00 60.000 6.00 70.000 7.00 80.000 8.00 90.000 9.00 $100.000 2=;'$10.00 200.000 2.C20.00 f 300,000 7.C30.00 400.000 40.00 600.000 \: 60.00 600.000 60.00 700.000 70.00 800.000 80.00 900.000 90.00 T $1,000,000 i $100.005 2:; 2.000,000-5:*^ 200.00) 3.000.000 2: 300.00^ 4,000.000-^.: 400.00:. l6.000.000 600.003 6,000,000 600.00 7.000.000 700.00 8.000,000 800.00 9.000.000 900.00 i; *. r..'* 3 The fee amount can be obtained by breaking the evaluation amount into parts and using the entries in this table. An example for a permit valuation of $128,580 is shown at the right: $100,000 $10.00 20,000 2.00 8.000 0.80 600 0.05 80 0.01 $128,580 $12.86 Fee Amount Notes: 1) The minimum fee is 50 cents, so the fee for any valuation up to $5,000 is simply $.50. 2) Category 1 construction includes residential buildings 1 to 3 stories in height, except hotels and motels. Single family houses, duplexes and quadruplexes are in Category 1. Condominiums and apartment buildings are in Category 1 only if they are 3 stories or less in height. 3) A building" is-defined as a structure built for the support, shelter or enclosure of people, animals or property. Pg. 1 of 2 9/92 BIB] 37642-U01 2000-U02 063-U02 CC-U02 RESO-U02 LI3-U03 FO1126-U03 FO2358-U03 DO8967-U03 C6-U03 RESO-U03 1/16/2003-U04 ROBIN-U04