Loading...
HomeMy WebLinkAbout2002 007 CC RESO2002 007 CC RESO;¢f4¤¯&RESOLUTION NO. 2002-007 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK AMENDING RESOLUTION NO. 2001-054 SETTING FEES FOR ISSUANCE. PROCESSING AND FILING OF VARIOUS CITY SERVICES AND PERMITS IN THE CITY. SPECIFICALLY THOSE RELATING TO COMMUNITY CENTER/RECREATION FEES. PLANNING FEES AND SETTING CERTAIN PARKING VIOLATION FINES WHEREAS. Resolution No. 2001-054 generally sets forth the costs for the issuing, processing and filing of various City services and permits; and WHEREAS, the City Council desires to revise the fee schedules relating to Community Center/Recreation fees and Planning fees set forth in Resolution No. 2001-054; and WHEREAS. Resolution No. 91-67 generally sets forth the bail schedule for violations of vehicular regulations of the Baldwin Park Municipal Code; WHEREAS, the City Council desires to revise the bail schedule set forth in Resolution No. 91-67 as to those fines authorized by Ordinance No. 1075. NOW. THEREFORE, THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES HEREBY RESOLVE. DECLARE. DETERMINE AND ORDER AS FOLLOWS: SECTION 1. That the cost of issuing, processing, and filing Planning entitlements, and for obtaining the use of City services and facilities for the Community Center/Recreation Department shall be in accordance with the attached Schedule of Fees and Charges, attached hereto and incorporated herein as Exhibit A." SECTION 2. That the fee schedules set forth in Exhibit A" hereto shall supersede those fee schedules provided in Resolution No. 2001-054 relating to Community Center/Recreation fees and Planning fees. SECTION 3. That. in accordance with Ordinance No. 1075. the civil penalty for parking violations of the following Baldwin Park Municipal Code sections is hereby established to be fifty dollars $50.00) for each violation thereof: a. Section 72.02 b. Section 72.03 c. Sections 72.04 through 72.18 d. Sections 72.37 through 72.38 e. Section 72.21 f. Section 72.50 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&Resolution 2002-007 Page 2 SECTION 4. That alt fines and penalties set forth in Resolution No. 91-67 that are not in conflict with those established by this resolution shall remain in full force and effect. SECTION 5. That the fees. charges and fines established by this resolution shall become effective immediately. SECTION 6. That the City Clerk shall certify as to the adoption of the Resolution and shall cause the same to be processed in the manner required by law. APPROVED AND ADOPTED this 16th day of January 2002. ManuelLozano Mayor ATTEST: STATE OF CALIFORNIA COUNTY OF LOS ANGELES ss CITY OF BALDWIN PARK I, ROSEMARY RAMIREZ, Chief Deputy City Clerk, of the City of Baldwin Park do hereby certrfy that the foregoing resolution was duly and regularly passed and adopted by the City Council of the Crty of Baldwin Park at its regular meeting of the City Council on January 16, 2002 by the following vote: AYES: COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: ABSTAIN: COLWCILMEMBERS: ROSEMAWRAM1REZ. CMC Chief Deputy Ci^Clerk Marion Garcia, Ricardo Pacheco. Mayor Pro Tern Linda Gair and Mayor Manuel Lozano Bill Van Cleave NONE NONE BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&CITY OF BALDWIN PARK EXHIBIT-A" SCHEDULE OF FEES AND CHARGES RESOUjnONWW S~S<y A^oo^f 4^ SPECIAL SERVICES Geo-\\ Government Reports V\ Munfcval Code Complete $75.00 Municipal Code Addendum Subscription 20.00 Zoning Code Complete CQSTTO Zoning Code Add^dumSubscuption DUPLICATE) CityBudget 20,00 General Reports 1st sheet of series 1.00 each additional 15 Pofice Reports 15.00 PoBce Background Investigafion Civil 15.00 hour OtafionVeriftartkw-Equipment Vfote8ons 10.00 AgendaPactet 25.00 General Plan only) 55.00 OR COSTTO DUPLICATE) 2ionkigMap 8<00 GenenJ Plan Map 5.00 Bukfing Plan Records L^tefSize 10sheet OtherSfeess 35shee( Photographs $10.00 Al Sizes MtwBaneous PonnHs Entertainment Penny-Inmal Entertainment Pennit-Renewal Gun PennK AppCcadon Business Alarm Pennits In'rtial Hookup Strong Motion Instrumentation Fee Booking Fees City Jail) Fingerprints Applicant supplies card and forwards to DOJ for clearance Department takes prints and forwards to DOJ for clearance Administrative Fee 250.00 175.00 3.00 25.00 0.007% % of ynstruction cost) 75.00 10.00/set + State Fee 10.00/set + State Fee 9.00/set BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&EXHIBIT A" H^ AW)-77 CHART OF FEES BALDWIN PARK METROLINK STATION MONTHLY PARKING PERMIT RESIDENT NON-RESIDENT General Public $10.00 $20.00 Disabled* $0.00 $0.00 Senior/Student** $0.00 $20.00 *Any individual, whether a resident or not, with a valid California Department of Motor Vehides Disabled Parking placard can obtain a Monthly Parking Permit at no charge. ** Residents age 60 or older with valid identification, and residents with valid student identification can obtain a Monthly Parking Permit at no charge. BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&PAGE SCHEDULE OF FEES A CHARGES Impounds Impound/Stored Vehicles Release Owing Under Influence DlH)/Stored Vehicle Vendor Carts Human lowered) Vendor Merchandise After Court Disposition) Shopping Cart Retrieval per can) Appeals Fifing and Processing Fee Zoning and Subdivision Appeals PubCc Nuisances Abatement Costs Exceeds $1,000 Abatement Costs ess than $1,000 $ 40.00 230.00 10&00 40-00 3.00 S 50.00 ea 300.00 5000 ea 10.00 ea Fireworks Penntt and Processing Pee Compliance Deposit & Inspection Fee Liability Insurance Returned Checks-MSF/etc Bicycle License Annual * Animal Control* OogUcense Parade Permit and/or Demonstrations Refuse Collection and Disposal No Charge Non-Refundable 5000 As Required 2SLOO Fee Set by State FeeSelbyCoonty 25.00 Set by CooncS Resolution Temporary Waste Bins Pubfic RghHrf Way Only 20.00 ea Barricades and f^flective Tape)) two week period Non-Exclusive Franchise Fee Commercial/Industrial 750-00 Business License Transfer to New Location 25.00 ea 5.00 ea Duplicate Certificate Lost or Destroyed Processing and Inspections Fee New License) One Time Fee Commercial license Home Occupation Bankruptcy. Rre and Ctose-Out Sales Ring and Processing Fee 30 Days 60 Days 90 Days Complete Business License Address Computer Print-Out Bingo Permits 75.00 25.00 50-00'ea 100.00 ea 150.00 ea 75.00 ea 50.00 year BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&HEOULE OF FEES ANO CHATI^' AGE 3 Court Referral Program 1 120 HOU.-S 121 Hours Rus Worker's Compensation Fee Oarces Pennit F%ng and Processing Fee Safely Services Handbills Pen^a Filing and Processing, Massage Pariocs Pemift Ring and Processing Fee New Employee Checks Taxfeabs GeriiBcata o( Converdence and Neoesdty Annual Renewal of Corticate LfabB8y Insurance Owiges h Mwc^ Vehkdes, aa Teroporary Use Pennfts FSng and Invesfigadon Fee Attatliment #3 20.00 25-00 20-CO 50.00 jea Sel by P.O. 50.00 ea 250.00 25:00 500LGO 35000 As required As required 115.00 ea Temporary 0«tdwBxhfi>to RHng and Investigation Fee Businesses mKkr 10,000 square feet 50 p/6 onth* Bosincsscsabow 10.000 quflcefixt $150 P/6 onth Street Benches Pennit Fing and Rocessing fee Bench Removals by Cfty Bench Slorage by City max. 60 days Street Banners Pemift Ring and Processing Fee lO.OCVbenctVyr 25.00 ea W.OO/weekfea 50.00 ea Yard Sates Only Allowed Isl weekend of March. June. September and December Motorized Vending Calering/ice Cream/Produce Trucks) Background Check Fingerprints and/or Palm Prints Sellers Permit Owner) Truck'Inspection Reinspection Vendor's Pennit Per Driver) No Fee 100.00 50.00 50.00 35.00 17.00 15.00 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&EXHIBIT A COMMUNITY CENTER/RECREATION Park Facilities and Recreation Activities EQUIPMENT/SUPPLIES TV/VCR & PA System Slide Projector & Screen Coffee 25.00 15.00 10.00 15.00 flat per day flat per day 50 or less) 50 or more) WEIGHTROOM/BOXING GYM Residents Annual 8-17 years 40.00 18yrs&over 100.00 Non-Residents 8-17 years 80.00 18yrs&over 200.00 POOL FEES Admissions Residents Youth-0-17 0.50 Adults-18-54 1.00 Sr. Citizens" 55 and Older 0.00 Swim Classes Youth Registration 20.00 Adult Registration 30.00 AQUATIC FACILITY 1-20 people. 2 lifeguards) 50.00/hr. 20-50 people. 3 lifeguards) 75.00/hr. 51-100 people, 4 lifeguards) 100.00/hr. 101-15050 people. 5 lifeguards) 150.00/hr. COMMUNITY CENTER Meeting Room 15.00/hr. Double Size) 30.00/hr. Cleaning/Damage Security 100.00 Gymnasium Operating Hours) 35.00/hr. Non-Operating Hours) 45.00/hr. Cleaning/Damage Security 150.00 Game Room 25.00/hr. Cleaning/Damage Security 100.00 Monthly 4.00 16.00 8.00 25.00 35.00 50.00 75.00/hr. 150.00/hr. 200.00/hr. 250.00/hr 30.00/hr. 50.00/hr. 100.00 70.00/hr. 80.00/hr. 150.00 50.00/hr. 100.00 Biweekly 3.00 9.00 5.00 15.00 Non-Residents 1.00 2.00 1.00 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&EXHIBIT A SENIOR CENTER Assembly Hall 1-100) 101+) Decorating Fee Cleaning/Damage Security BALLFIELD Softball Field Lighting Cleaning/Damage Security Resident $70.00/hr. 90.00/hr. 30.00/hr. 300.00 30.00/hr. 20.00/hr. 50.00 60.00/hr. 40.00/hr. 50.00 Non-Resident $80.00/hr. 100.00/hr. 30.00/hr. 300.00 FAMILY SERVICE CENTER General Hall/Kitchen Decorating Fee Cleaning/Damage Security PICNIC FACILITIES Shelter 20.00/hr. 20.00/hr. 150.00 25.00 flat fee 30.00/hr. 20.00/hr. 150.00 25.00 flat fee WALNUT CREEK PARK Outdoor Assembly Shelter Cleaning/Damage Security 20.00/hr. 150.00 35.00/hr. 150.00 Cleaning/Damage Fees imposed at the discretion of the Recreation and Community Services Director or his designee BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯ &SCHEDULE OF FEES AND CHARGES PAGE 7 ENGINEERING FEES Encroachment, Moving and Load Regulations Pennit Filing and Processing Fee for Moving Load or Vehicle 15.00 ea Over Width. Height or Weight Per Occurence / Encroachments Gunrte Storage 25.00 ea Gunite Cleanup-Deposit returnable) 20-00 ea Overhead Structures 300.00 ea The fee for other encroachment permits not feted wifl be determined by the Director of Public Works Pavement Restoration Utility Cuts 4.00 s,f, $3.70cX Rsftjndabletfwortcperfonned by permittee) Engineering Fees Expedite Mapmm Check 1 1/2 times the tee * * * ifr For items not covered ft) the Fee schedule a minimum of one 1)hour wM be charged at the minimum hourly rate of $ 5000 Subdivision Filing and Plan Check Fee Tentative Parcel Map 1500.00 Tentative Tract Map 2000.00 First Ten Lots or Units) Parcel Map Final Map) Tract Map Rnal Map) Easement Deed* Easement CheckiiX)' Monument Inspection + 45.0CVLo( or Unft Lots or Units 11-25) + 25-00/Lot or Unit Lots or Units 26-50) 2400-00 + $60/Parcel 2400-00 + $60/Lot 450.00 400.00 425.00 ea Parcel Map 800.00 ea Tract Map Verification hat City Map is consistent wrth conditions of tentative approval 300.00 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯ &PAGE SCHEDULE OF FEES AND CHARGES Verification thai City Grani of Waiver and Certificate of Compliance are consistent with conditions of tentative approval Agreement and/or Improvement Security Extension of Time for Improvement Agreement \ Fourth Submittal.of Originals and/or Prints Sixth Submtttal of Originals and/or Prints Bghth Submftlal of Originals and/or Prints and each Subsequent Submittal Extension of Time for Final Map Six Months One Year 300.00 300.00 ea 250.00 per tetter 450.00 1250.00 1500.00 250.00 500-00 Recordatfon Fees RrstSheet Second Shee( and Al Subsequent Sheets C^rtfficatioo of Conection CocfiScato of Comptance? 100000 Street Vacation- Covenant and Agreement' Lot Line Adjustment MfeooBonoous Documents 96.00 2.00 ea 500.00 100000 60000 150000 60000 The fee for these items includes onty the review of the legal description and the research associated with he particular case. However, ff the City provides the legal description add $150 to the fee indicated. Improvement Plans A fee shall be charged at the time of pten submittal in the amount set forth below. 1. Plan Check: Improvement Valuation S $ S S $ 100.000) $ 0-999 1.000-9.999 10.000-49.999 50.000 99.999 100.000 999.999 1.000.000 and over Fee $ 150.00 $150+ 11%x Valuation 000) $1,140 + 8% x Valuation 10.000) $4.340 + 4% X Valuation 50.000) $6.340 + 2% x Valuation S24.340+ 1.5% x Valuation 1.000.000) BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯ &SCHEDULE. OF FEES AND CHARGES PAGE 2. Inspection: Inspection fee shall be 100% of he plan check fee. Drainage Plans One 1) tot to three(3) lots Four A) lots or more Erosion Plan Inspection Fees Less than One Acre One Acre but Less Than 5 Acres 120.00 500-00 50.00 200.00 GRADING AND EXCAVATION VoNnCYor Fraction of 100 1.000 10.000 10.000 an Check Yardage Base Amount 50 to 100 Sf 140 minimum 101 to 1,OOOCY $ 140<- 60per 001 to 10000CY 9 700^ TOper 001 to 100.000 CY $1.330^ SOper Over 100.000CY $2,050+ 50per t—Jtaa aortr>— * inspccoon j mrilt Issuance Base Amount VollnCYor Fracfionof 100 1.000 10000 10,000 Yanfooe o 100CYS 280mtiimum Otto 1.000CY S 280+ 70 per 000(0 10LOOOCY $ 910«:100per OOOto 100.000CY $ 1.8KX- 200per Ow 100.000CY $8.610<- 100 per Fourth Submittal and each Subsequent Submrttal for Grading, Drainage and Improvement Plan Checks Reproduction Costs Bluefine prints 24" x 18") Blueline prints 24- x 36") Sepia any size) Final Map Bluehne Copy 8 1/2- x ir or 8 1/2* x 14-) Materials Purchase Plain Mylar 24" x 36*') Plan & Profile Mylar 24" x 36') Exceeding CYof 100 1,000 1Q.OOO 10.000 Exceeding CYof 100 1.000 10,000 100.000 25% of original plan check fee 5.00/First & 3.00/each additional print 25 ea 5.00 ea 6.00 ea BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯ 2002 007 CC RESO;¢f4¤¯ &SCHEDULE OF FEES ANO CHARGES PAGE n Sewer Installation: 12'0 V.C.P. 55.00 l.f 8"0 V.C-P- 50.00 U. ero V.C-P. 45.00 i.f. Manhole 2000LOO ea Sawer Saddte 200-00 ea Dye Test permittee tb provide dye)' 15000 ea JTHJTY PERMITS Trench Length Plan Check Fee Issuance and Inspection Fee Upto5(T Mintfmjm$25 Min.$75 CftydoesA.C. hfci.$100 UtiLCo-does A.CL when directed 5rto25(r $25 + $£su> sa $100^ $ jso if. 50" 25rto1(W 50+ $J51A>2501 S2fX>¥ $^OU.>2Sff OvwIOXr $19^ $.05UL> 1000 $400+ fJ90tt> 1000 Up(o200s4.«MackQtiof^^OOsXfc^pavingtobepe^^ \ i» to perkwrn the paving unless olhemise cfti^^ NOTE: Fees applicable to work perfdnned by both open trench and/^ of installation. Non-Trench Work Plan Check Fee Issuance and Inspection Fee Up to 100 s.<- Minimum $25 Min. $75 City does AC. Min. $125 IM Co. does AC. when directed Over 100 s.f, $25+ $ 30 s.f. 100 s.f. $<25+- $1,00 sf> 100 s.<. Storm Drain Construction of New Catch Basin C.B.. Transition Structure, 3500.00 ea or Manhole M.H. Modification of he existing C.B. or M.H- 2500.00 ea Drain Pipe/Roof Drain 20.00 U. Parkway Drain 600.00 ea Slorm Drain Mainline RCP) 130.00 l.f. Storm Drain Lateral RCP) 90.00 U. BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&SCHEDULE OF FEES AND CHARGES Traffic Striping or Lane Line Marking Lettering/Arrow Street Name Signs 2) & Post Tra^c'Regulatory Sign Traffic Signal 2to 4 phase) Traffic Signal 5 to 8 phase) Traffic Signal Modification Street Light Street Tree Installation ea Relnspection Fee 3rd and Each Subsequent Inspection 65.00 Sfte Review Plans Room Addition More than $10000 PAGE 12 0.15 U. 15XX) ea 250-OOea. 17000 ea $70.000,00 90.00000 15.000.00 2,000.00 ea 175.00 25.00 Street Name Change Application Fees 1,000.00 Cost of signs, upon approval of street name change, detennined by the Director of PUbfcWorfcs TEMPORARY USE PUBUC WORKS PERMIT FEES INCLUDES UTILITIES Lane Closure No Street Cuts Per Occurence Monthly Perm ft Annual Perm ft Approved Road Closure If Public Convenience Dictates 100.00 350.00 3,000.00 500.00 day All utility permits for excavation or street cuts in the Crt/s right-of-way or in t^e Chy's future right-of-way as determined by the City's General Plan shall be issued to utility companies. BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&SCHEDULE OF FEES AND CHARGES PAGE 13 PENALTY' WORK COMMENCED PRIOR If any. work is commenced on public right-of-way witftout a permit he Permittee must obtain an after-the-tact permit If 6 is determined thai the work was an emergency m nature and it is approved by the Director of Public Works then the after-the-fact permit fee will be charged as a regular permit fee. Afterthe-Fad Pormft Issuance Double the Total Fees BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&SCHEDULE OF FEES AND CHARGES PLANNING FEES Planning Fees Adminislralrve Adjustment Zone variance or Conditional Use Pennit Zone Variance Single Family Single Lot) Amendmer4 to the Zoning Code or the General Plan Zone Change Onty Development Agreement Development Plan Environmental Review Categorical Exemption Negative Declaration Envfronmental Impact Report review ooty) Environmental Impart Report preparaaon) Incurred Combined Pubfc Hearings PAGE 14 500.00 i.ooaoo 325.00 2.50000 1.800.00 Actual Costs Incurred by Staff. 1,500.00 eaoo leaar moohr1 Actual costs 100% of higher and 50% Q( any additional Rus any reasonabte expenses for staff or consultant sen/ices. Zoning Map Copy General Ran Map Copy Appeals, Zoning To Planning Commission or City CounriQ 300.00 Appeals. Tentative Maps Time Extension Sgn Perm'rt Plan Review/Design Rewew CommerciaI/lndustrial/Office New Construction Square Feet 1- 1.000 1.00-1 3.000 3.001 6.000 6.001 10,000 10.000-15,009^^^^ 15.001 2ft€TO CONTINUED NEXT PAGE) BOOea &00ea 300.00 400.00 50-00 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&SCHEDULE OF FEES AND CHARGES PAGE 15 1.300.00 1.500.00 750:00 2,000.00 2.300.00 2.600.00 3.000.00 The initial plan review/design fee shall cow initial review at the plans phis review of up to wo revised ptans. Rirtherieviewshal be charge at 33^ percent rf rounded to the nearest $5.00) for each revision. Publications Zoning Code Complete Zoning Code addendum Subscription General Plan only) AT DUPLICATION COST BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&EXHIBIT A Design Review Fees New Construction-Square Feet Number of Residential Dwelling Units Maximum Commercial Office/Industrial Remodel Value Proposed Fee 1-1,000 $100,000 $250 1,001-3,000 2-4 $200,000 $400 3,001-6,000 5-6 $400,000 $575 6,001-10,000 7-10 $700,000 $775 10,001-15,000 11-15 $1,000,000 $1,125 15,001-20,000 16-20 $1,500,000 $1,375 20,001-27,000 21-25 Over $1,500,000 $1,625 27,001-35,000 26-35 $1,875 35,001-45,000 3&45 $2,175 45,001-60,000 46-60 $2,500 60,001-100,000 61-100 $2,875 100,001-150;DOO 101-150 $3,250 Over 150.000 Over 150 $3,750 The Initial plan review/design fee shall cover initial review of the plans plus review of up to two revised plans. Further review shall be charged at 33.3 percent of the base fee rounded to the nearest $5.00) for each revision. BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&SCHEDULE OF FEES / D CHARGES BUILDING FEES Building Fees AEIHB & S Occupancies6) 1. Permit Fee: Valuation fees see BUILDING ATTACHMEiTTI)^^ 2. Plan Check Fees: * plan check fee is 85% of the building permit fee. with a minimum t $82.00. * Handicapped plan fee is 5% of the buitding permit fee. PAGE 16 will not be charged for re-roofing or air condftioning when plans are not *J»6r R1. R3 & U Occupancies, use 80% of the fee tabtes above. * Plan check req Building Permits Re-inspection Certificate erf Occupancy Original Certificate of Occupancy-Subsequent Certificate of Occupancy-Temporary Request for Address Change Garage Conversion Valuation 14 Time) Extension of Permit One Time) Special Occupancy FuD House) Occupancy Groups R or U Special Occupancy Inspection Other Than Above Re-inspection For Excessive More Than 3) Plan Checks Building Regulations Variance Filing and Processing Fee $75-00 No Charge 50.00 65.00 750.00 +$3.000 for ea. Time after) 3,000.00 Example: 2nd time $6,000 25.00 120.00 150.00 75.00 $75.00 Energy Conservation Regulation Plan Check and Permit Fee 20% of total of building permit and plan check fee Uniform Plumbing Code For Issuing Each Permit In Addition: For each plumbing fixture or trap or set of fixtures on one trap including water, drainage, piping and backflow protection thereof For each building sewer and each trailer park ewer Rainwater Systems per drain For each sewer connection For each private sewage disposal system For each sewer cap For each water heater and/or vent $35.00 14.40 18.00 14.40 48.00 36.00 14.40 14.40 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&SCHEDULE OF FEES / D CHARGES PAGE 17 Description For each gas piping system of one 1) to five 5) outlets For each gas piping system of six 6) or more. per outlet For each industrial waste pre-treatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps. For installation, alteration or repair of water piping and/or water treating equipment For repair or alteration of drainage or venting piping For each lawn sprinkler system or any one meter including backftow protection devices therefor For vacuum breakers or backflow protective devices on tanks, vats. etc.. or for installation on unprotected plumbing fixtures/including necessary water piping one of five. Over five. each Plumbing Re-inspection Fee Uniform Mechanical Code Heating AppBance Relocate or Replace Vent Contort CooBng Under 10.000 BTU Over 10,000 BTU Compressor or Boiler UnderSH.P. Compressor or Boiler Over3H.P.to15H.P. Over15H.P.to30H.P. Over30H.P.to50H.P. Over 50 H.P. Gas System Vent Fan Hoods Miscellaneous Permit Fee Re-inspection Fee Uniform Swimming Code $14.40 3.60 18.00 18.00 14.40 14.40 18.00 3.60 $75.00 $18.00 14.40 18.00 24.00 18.00 21.60 42.00 74.40 104.00 14.40 18.00 18.00 18.00 35.00 75.00 Fees Per Building Permit Fee BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&SCHEDULE OF FEES A J CHARGES PAGE 18 Electrical Code 30.01 Fees New Construction and Additions Permit Issuance Fee $35.00 + tee for each schedule in Section 30.4 + $.06 per ampere for each service switch 600 vote or less; $.03 per ampere for each additional service switch in excess of 600 vote. In addition the following fees shaU apply to each type of construction: a. Gasoline Service Station Buildings b. Drinking or Dining Establishments c. Power Plants Pumping Plants a. VVcKxiworidng Establishments. Planning MHls b. Steel Mills, Factories c. Manufacturing Plants, Assembly Plants d. Gasofine Service Station Open Canoptes e. Repair Garages, Aircraft Repair Hangar f. Ice Plants, Cold Storage Plants g. Creameries, Bakeries, Food Processing Plants b. Hotel. Motel. Apartment Houses, Lodging Houses L DweHngs j. Dry Cleaning Description a. OfflceBuOding b. Stores. Markets whotesate or retail) c. Hospitals, Sanitariums. Convalescent Hospital d. Nursing Homes. Child Nurseries e. Schools f. Churches. Assembly Buildings g. Amusement Park Structures h. Any Occupancy Not Listed a. Residential Accessory Building. Attached or Detached, Such As Private Garages, Carports. Sheds, etc. b. Hotel. Mote, arid Commercial Parking. Garages and Carports c. Warehouses Up To and Including 5.000 s.f. a. Warehouses That Part Which is Over 5.000 s.f. b. Storage Garages Where Work No Repair is Done c. Aircraft Hangars Where No Repair Work is Done $0.18 s.f. 0.18 s.f. 0.18 s.f- $0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 8,f. 0.09 s.f. $0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s-f. 0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s.f. $ 0.04 s.f. 0.04 s.f. 0.04 s.f. $ 0.03 s.f. 0.03 s.f. 0.03 s.f. BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&SCHEDULE OF FEES t D CHARGES PAGE 19 30.2 Alterations and Additions $6.00 per circuit Where no structural work is being done. or where it is impractical to use the square footage schedule. 30.3 Minimum Total Fee $18.00 minimum For Any Type of Construction or Installation. 30.4 Fees For Fixed Motors. Transformers. Generators. Heating and Cooking Appliance, etc. Converting all units to H.P. horse power). K.W- kilowatt). K.VA. kilovolt ampere) fees shall be determined as follow: 1 $7.20 Over 1. riot over 5 10.80 Over 5. not over 20 13.20 Over 20, not over 50 20.40 Over 50. not over 100 25.20 Over 100, not over 500 38.40 Over 500, not over 1000 54.00 Over 1000. not over... 74.20 30.5 a) Lighting Standards Less than 3 on a ate $12.00 Each additional over 3 on a ste 3.60 Lamphokflng devices, not a part of a lighting standard Festoon Type) Not over 50 14.40 Over 50. no over 100 26.40 Over 100 38.40 30.6 Signs and Outline Lighting One Sign and Gas Tube System $12.00 Each Additional Sign or Gas Tube System 8.40 Each Transformer or Ballast 3.60 Each Motor or Flasher 3.60 Each Lampholding Device in Connection with a Sign From 1 to 20 inclusive. 36 ea. Next 100 18ea. Each additional 10 ea. BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&SCHEDULE OF FEES W CHARGES PAGE 20 30.7 Temporary, Permanent or Construction Poles Temporary. Underground and Work-With Services: Temporary Underground Services Temporary Work-With Service Residential) Temporary Work-With Service Commercial) $35.00 35.00 35.00 30.8 Miscellaneous Any electrical work for which a permit is required, but no fee is herein provided $18.00 30.9 Annual Maintenance Electrician Fee for each annual Maintenance Permit Fees for aH work installed under such permit since date of last previous inspection shaB be paid according to the above schedule at the time the annual permit is issued. Where plans are required and the service is'over 400 amps, a plan check fee equal to 60% of the permit fee shall be paid at the time plans are submitted. Uniform Sign Code Fees Fees per Bidding Permit Fees BUILDING ATTACHMENT I ij> BulMIng Valuation Data SEE FOLLOWING PAGE INSERT Fees as Current BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&RESIDENTIAL VALUATION $0-700.00 $700.00-1,999.00 $2.000.00 $3.000.00 $4.000.00 $5,000.00 $6.000.00 $7,000.00 $8,000.00 $9,000.00 $10.000.00 $11.000.00 $12.000.00 $13.000.00 $14,000.00 $15.000.00 $16.000.00 $17.000.00 $18,000.00 $19,000.00 $20,000.00 $21.000.00 $22,000.00 $23.000.00 $24.000.00 $25.000.00 $26.000.00 $27.000.00 $28,000.00 $29,000.00 $30,000.00 $31,000.00 $32,000.00 $33,000.00 $34,000.00 $35.000.00 $36.000.00 $37.000.00 $38,000.00 $39,000.00 $40,000.00 $41,000.00 $42,000.00 $43.000.00 $44.000.00 $45,000.00 $46.000.00 PLAN CHECK R1. R3, U $24.04 $36.10 $46.39 $56.68 $66.97 $77.26 $87.55 $97.85 $108.13 $118.43 $128.71 $139.01 $149.30 $159.59 $169.88 $180.17 $190.46 $200.76 $211.04 $221.34 $231.62 $241.92 $252^2 $282.50 $272.80 $283.08 $291.23 $299.36 $307.57 $315.65 $323.78 $331.93 $340.07 $348.22 $356.35 $364.49 $372.64 $380.77 $388.92 $397.06 $405.19 $413.34 $421.48 $429.62 $437.76 $445.90 $454.04 BLDG PERMIT R1, R3, U $30.05 $45.12 $57.98 $70.85 $83.71 $96.58 $109.44 $122.30 $135.17 $148.03 $160.90 $173.76 $186.62 $199.49 $212.35 $225.22 $238.08 $250.94 $263.81 $276.67 $289.54 $302.04 $315.26 $323.13. $340.99 $353.86 $364.03 $374.21 $384.38 $394.56 $404.74 $414.91 $425.09 $435.26 $445.44 $455.62 $465.79 $475.97 $486.14 $496.32 $506.50 $516.67 $526.85 $537.02 $547.20 $557.38 $567.55 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&VALUATION $47.000.00 $48.000.00 $49.000.00 $50.000.00 $51,000.00 $52.000.00 $53.000.00 $54,000.00 $55.000.00 $56.000.00 $57.000.00 $58,000.00 $59.000.00 $60,000.00 $61,000.00 $62.000.00 $63.000.00 $64.000.00 $65.000.00 $66.000.00 $67.000.00 $68.000.00 $69,000.06 $70.000.00 $71,000.00 $72.000.00 $73.000.00 $74.000.00 $75,000.00 $76,000.00 $77,000.00 $78,000.00 $79,000.00 $80,000.00 $81,000.00 $82,000.00 $83,000.00 $84,000.00 $85.000.00 $86,000.00 $87,000.00 $88,000.00 $89,000.00 $90,000.00 $91,000.00 $92.000.00 $93,000.00 $94,000.00 $95,000.00 PLAN CHECK R1, R3,U47 $462.18 $470.33 $478.46 $486.60 $492.60 $498.59 $504.58 $510.56 $516.55 $522.55 $528.54 $534.53 $540.52 $546.50 $552.50 $558.49 $564.48 $570.47 $576.46 $582.46 $588.44 $594.43 $600.42 $606.41 612.41 $618.40 $624.38 $630.37 $636.36 $642.36 $648.35 $654.34 $660.32 $665.31 $672.31 $678.30 $684.29 $690.27 $696.26 $702.26 $708.25 $714.24 $720.23 $726.22 $732.22 $738.20 $744.19 $750.18 $756.17 BLDG PERMIT R1,R3,U $577.73 $587.90 $598.08 $608.26 $615.74 $623.23 $630.72 $638.21 $645.70 $653.18 $660.67 $668.16 $675.65 $683.14 $690.14 $698.11 $705.60 $713.08 $720.58 $728.06 $735.55 $743.04 $750.53 $758.02 $765.50 $772.99 $780.48 $787.97 $795.46 $802.94 $810.43 $817.92 $825.41 $832.90 $840.38 $847.87 $855.36 $862.85 $870.34 $877.82 $885.31 $892.80 $900.29 $907.78 $915.26 $922.75 $930.24 $937.73 $945.22 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&VALUATION $96,000.00 $97.000.00 $98.000.00 $99.000.00 $100,000.00 PLAN CHECK R1, R3, U $762.17 $768.16 $774.14 $780.13 $786.12 BLDG PERMIT R1, R3, U $952.70 $960.19 $967.68 $975.17 $982.66 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&State of California Department of Conservation Resources Agency Division of Mines and Geology Fee Schedule Strong-Motion Instrumentation and Seismic Hazard Mapping Fee Category 1 Construction 1 to 3 Story Residential)* Method 1. The fee amount can be calculated from the permh valuation amount using the formula: Valuation Amount) X 0.0001 Fee Amount As an example, the fee for a $128,580 valuation is $128,580 x 0.0001 or $12.86: * Method 2. As an alternative to Method 1, the fee for a given valuation can be calcuteted:us2ng the foflowingacsin table, as. Bustreted below: Vriu. Feel Valu. Fee Valu.'Fee Vata:' Fee'l^.'^Valu: r-^ $0-W) WjOt aoo:/ aoa- *«> OCT 400 A04 BOO^.ftW. too QM 700 OJffT 800 008 900 009 WfWfWfM:. OOQ^ft?Ol iwto^oao.i 4^00.^)0^0- jB^OOlK?OW? 6ju00^0^60 7j000 0.70 8^00 080 9^)00 090 OOdaBt'^JOiK, w^ot^^xi^ 60lOOO.T||^00,-j tfOuOOO^^ftttt 70,000 7j00 80,000 8^)0 90/X)09.00 Oa000^^10UM(J^<1aOOQ^06; AS?abq^oqqlKate(^^ f^eoiMW^tooo 700,000. t 7000' eoo^xx) 80001 900.000 90X0 eoxK>4aa,oQo^^ iOOOl^^'^ yxwjooo;-'1 71 8j000^)00 8QOOO 9,000/)00 900.00T The fee amount can be obtained by breaking the evaluation amount Into parts and using the entries in this table. An example for a permit valuation of $128,580 is shown at the right: 1 i 4100,000 20.000 8,000 500 80 $10.00 2.00 0.80 0.06 0.01 $128.580 $12.86 Fee Amount * Notes: 1) The minimum fee is 50 cents, so the fee for any valuation up to $5.000 is smr.piv $.50. 2) Category 1 construction includes residential buildings 1 to 3 stories in height, except hotels and motels. Single family houses, duplexes and quadrupfexes are in Category 1. Condominiums and apartment buildings are in Category 1 only if they are 3 stories or less in height. 3) A building" is defined as a structure built for the support, shelter or enclosure of people, animals or property. Pg. 1 of 2 9/92 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&COMMERCIAL VALUATION $0-700.00 $701.00-2.000.00 $2.000.00 $3,000.00 $4.000.00 $5,000.00 $6.000.00 $7,000.00 $8.000.00 $9.000.00 $10,000.00 $11.000.00 $12.000.00 $13.000.00 $14,000.00 $15.000.00 $16,000.00 $17.000.00 $18.000.00 $19,000.00 $20.000.00 $21.000.00 $22.000.00 $23.000.00 $24.000.00 $25,000.00 $26.000.00 $27,000.00 $28,000.00 $29,000.00 $30,000.00 $31,000.00 $32,000.00 $33,000.00 $34,000.00 $35,000.00 $36,000.00 $37,000.00 $38,000.00 $39,000.00 $40,000.00 $41,000.00 $42,000.00 $43,000.00 $44.000.00 $45,000.00 $46.000.00 PLAN CHECK AEIHB & S $82.00 $82.00 $61.61 $75.28 $88.94 $102.61 $116.28 $129.95 $143.62 $157.28 $170.95 $184.62 $198.29 $211.96 $225.62 $239.29 $252.96 $266.63 $280.30 $293.96 $307.63 $321.30 $334.97 $348.64 $362.30 $375.97 $386.78 $397.60 $408.41 $419.22 $430.03 $440.84 $451.66 $462.47 $473.28 $484.09 $494.90 $505.72 $516.53 $527.34 $538.15 $548.96 $559.78 $570.59 $581.40 $592.21 $603.21 BLDG PERMIT AEIHB & S $37.56 $56.40 $72.48 $83.56 $104.64 $120.72 $136.80 $152.88 $168.96 $185.04 $201.12 $217.20 $233.28 $249.36 $265.44 $281.52 $297.60 $313.68 $329.76 $345.84 $361.92 $378.00 $394.08 $410.16 $426.24 $442.32 $455.04 $467.76 $480.48 $493.20 $505.92 $518.64 $531.36 $544.08 $556.80 $569.52 $582.24 $594.96 $607.68 $620.40 $633.12 $645.84 $658.56 $671.28 $684.00 $696.72 $709.44 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&VALUATION $47.000.00 $48.000.00 $49.000.00 $50,000.00 $51,000.00 $52.000.00 $53.000.00 $54.000.00 $55.000.00 $56.000.00 $57,000.00 $58,000.00 $59,000.00 $60.000.00 $61.000.00 $62.000.00 $63,000.00 $64.000.00 $65,000.00 $66.000.00 $67.000.00 $68.000.00 $60.000.00 $70.000.00 $71.000.00 $72.000.00 $73,000.00 $74,000.00 $75,000.00 $76.000.00 $77,000.00 $78,000.00 $79,000.00 $80,000.00 $81,000.00 $82,000.00 $83,000.00 $84,000.00 $85,000.00 $86,000.00 $87,000.00 $88,000.00 $89,000.00 $90,000.00 $91,000.00 $92.000.00 $93,000.00 $94,000.00 $95.000.00 PLAN CHECK ABHB & S $613.84 $624.65 $635.46 $646.27 $654.23 $662.18 $670.14 $678.10 $686.05 $694.00 $701.96 $709.92 $717.88 $725.83 $733.79 $741.74 $749.70 $757.66 $765.61 $773.57 $781.52 $789.48 $787.44 $805.39 $813.35 $821.30 $829.26 $837.22 $845.17 $853.13 $861.08 $869.04 $877.00 $884.95 $892.91 $900.86 $908.82 $916.78 $924.73 $932.69 $940.64 $948.60 $956.56 $964.51 $972.47 $980.42 $988.38 $996.34 $1,004.29 BLDG PERMIT AEIHB & S $722.16 $734.88 $747.60 $760.32 $769.68 $779.04 $788.40 $797.76 $807.12 $816.48 $825.84 $835.20 $844.56 $853.92 $863.28 $872.64 $882.02 $891.36 $900.72 $910.08 $919.44 $828.80 $838.16 $847.52 $856.88 $966.24 $875.60 $984.96 $994.32 $1.003.68 $1,013.04 $1,022.40 $1,037.76 $1,041.12 $1,050.48 $1,059.84 $1.069.20 $1,078.56 $1,087.92 $1,097.28 $1,106.64 $1,116.00 $1,125.36 $1,134.72 $1,144.08 $1,153.44 $1.162.80 $1,172.16 $1,181.52 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&VALUATION $96.000.00 $97,000.00 $98.000.00 $99.000.00 $100,000.00 PLAN CHECK BLDG PERMIT AEIHB & S ABHB & S $1.012.25 $1.190.88 $1,020.20 $1,200.24 $1,028.16 $1,209.60 $1.036.12 $1,218.96 $1.044.07 $1,228.32 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&State of California Department of Conservation KJU*\o^^ * t^fwwj uivision of Mines and Geology Fee Schedule Strong-Motion Instrumentation and Seismic Hazard Mapping Fee Category 2 Construction* * Method 1. The fee amount can be calculated from the permit valuation amount using the formula: Valuation Amount) X 0.00021 Fee Amount As an example, the fee for a 1,231,890 valuation is $1.231.890 x 0.00021 or 258.70 Method 2. As on alternative to Method 1, the fee for a given valuation can be calculated using the folawhg table, as illustrated below: Vahi. Foe Vahi- Fee VBhL. Fee Vakk Fee Valu. Fee 0.100 4002200 004--. 900 ooe. 400 006 500 0.11 600 013 700 015 800 0.17 900 019 1«000 021 ZOOO 042 XOOO- OJS3 4,000 084 5,000 1.05 6.000 1.25 7.000 1.47 8,000 1.88 9,000 1.89 * noooo 2.1020000 4^030UOOO 6J30 40000 &40 5<yX)0.'1050 60000 1X60 70.000 14.70 80,000 16.80 90,000 18.90 100000 21j00 200000 42.00 300^000 63JOO 400000 84j00 800000 10&00 800000 12AjOO 700,000 147.00. 800,000 188.00 900,000 189.00 VWOOO- 21000^ zoooooo 42000-WWW: 63000 4^000000 84000 8^000000 1,06000 ejOSWM 1,26000 7,000,000 1,47000 8.000,000 1,88000 9.000,000 1.00.00 The fee amount can be obtained by breaking the evaluatipn amount into parts and using the entries in this table. An example for a permit valuation of $1,231,890 is shown at the right: 1,000,000 210.00 200,000. 42.00 30,000 6.30 1,000 0.21 800 0.17 90 0.02 $1,231,890 $258.70 Fee Amount Notes: 1) The minimum fee is 50 cents, so the fee for any valuation up to $2,381 is simply $.50. 2) Category 2 includes all buildinos not in Category 1. For example. Category 2 includes residential buildings over 3 stories, all office buildings, warehouses, factories and other manufacturing or processing facilities, restaurants, and other non-residential buildings. 3) A building" is defined as a structure built for the support, shefter or enclosure of peopte. animals or property. Pg. 2 of 2 9/92 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯ &BUILD'NG VALUATION DMA At ihe request of numerous building officials. Building Standards'" offers the following buildingvaluation data representing average costs for most building. Because residential buildings are the most common for many cities, two general classes are considered for these, one for average" unstnicbon and the other for good." Adjustments should be made for special architectural or structural features and the location of the project. gher or lower unit costs may often result. The unit costs are intended to comply with the definition of valuation" in Section 223 of the 1997 Uniform Building Code and rnus include architectural, structural, electrical, plumbing and mechanical work. except as specifically listed below. The unit costs also include he contractor's profit, which should not be omitted. The determination of plan check fees for projects reviewed by the International Conference of Building Officials will be based on valuation computed from these figures, which were established in April 2001. Ooc««—cy and Type Cot—rSquw Foot, AvffB OccfMncy and T)rp« Cot p«i SOUTR MMA« Wf9V9^ft Oocu—ney and Typtt C«wt pfSguare Foot,Awraca Occu—ncy W iyp« FoKAWC 1. APARTMENT HOUSES: Type for II F.R*... $8700 Good) $107 10 Type V Masonry or Type 111)..... 71.00 Good) $87.00 Type V—Wood Frame 62.60 Good) $80.40 Type I—Basement Garage 36.70 2. AUDITORIUMS: Type I or II F.R 102.80 Type II—l-Hour........ 74.40 Type" N.......... 70.40 Type 111 1-Houf........ 78.20 Type ill—N....... 74.20 Type V—l-Hour.......... 74.80 TypeV--N....... 6980 3. BANKS: Type lor II F.R.*.......... 145.20 Type II— l-Hour.......... 107.00 TypeH—N.................. 103.50 Type IH—1-Hour......... 118.10 Type IH-N..„.......„„„ 113.80 Type V—l-Hour.......... 107.00 Type V—N.................. 102.50 4. BOWUNG ALLEYS: Type II—I Hour.......... 50.00 Type 11—N.................. 46.70 Type III—l-Hour......... 54.40 Type III—N................. 50.90 Type V--l-Hour.......... 36.70 5. CHURCHES: Type I Of II F.R. 97.30 Type II-l-Hour 7300 Type II—N.. 6940 Type HI—l-Hour...... 79.40 Typelll-N. 75.90 TypeV- l-Hour..... 74 20 TypeV-N... 69.80 6. CONVALESCENT HOSPITALS: Type I or II FR-*. 13650 Type II—l-Hour. 94.70 Type III--1-Hour 97.10 TypeV—1 Hour-. 91.50 7. DWELLINGS: TypeV- Masonry.... $74.20 Good) $95.00 Type V Wood Frame. 66 00 Good) $90.60 Basemenis- Semi-Rr»she<l. 19.70 Good) $22.80 Unfinished. 14.30 Good) $17 40 8. FIRE STATIONS: Type 1 or 11 F.R..... 112.20 Type II- l-Hour......... 73.80 Type 11-N............. 69.60 Type IH—l-Hour......... 80.80 Type Hi—N................. 77.40 Type V—l-Hour.......... 75.80 TypeV—N.................. 71,90 9. HOMES FOR THE ELDERtY: Type I or II F.R........... 101.70 Type B—l-Houf......... 82.60 Type II—N.................. 79.00 Type III—l-Hour......... 86.00 Type lit—N................. 82.50 TypeV—l-Hour........ 83.10 TypeV-N................. 80.20 U>. HOSPfTALS: Type I or 11 F.R.".......... 160.00 Type III—l-Hour......... 132.50 TypeV—1 Hour.......... 12640 11. HOTELS AND MOTELS: Type lor II F.R.*.......... 99.00 Type III l-Hour......... 85.80 Type III- N................ 81.80 Type V—l-Hour.......... 74.70 Type V—N... 73.20 12. INDUSTRIAL PLANTS: Type or tl F.R 55.80 Type 11-l-Hour... 3880 Type II N 35.70 Type 111—l-Hour.. 4280 T)^elll N....... 40.30 TiH-up...... 29.40 TypeV l-Hour 4030 TypeV- N 3690 13. JAILS: Type I or II FR- $15600 Type 111 l-Hour. 142.70 TypeV-l-Hour 107.00 14. LIBRARIES; Type lor II FR. 114 10 Type II l-Hour 83.50 Type II N- 79.40 Type III—1 Hour.. 88.20 Type III—N 83.80 TypeV l-Hour..... 82.90 Type V-N....... 7940 15. MEDtCAL OFFICES: Type I Of II F.R.*...... 117.20 Type H-l-Hour.......... 9040 Type 11—N.................. 85.90 Type 111—l-Hour........ 95.20 Type HI—N................. 91.30 Type V—l-Hour.......... 88.40 TypeV—N 85.30 16. OFFICES**: Type I or 11 F.R.".......... 104.70 Type l-Hour.......... 70.10 Typell—N 66.80 Type III—l-Hour......... 75-70 Type 111-N................. 72.40 Type V—l-Hour.......... 70.90 TypeV-N.................. 66.80 17. PRIVATE GARAGES: Wood Frame............... 23.80 Masoniy..................... 26.90 Open Carpons............ 16.30 18. PUBUC BUILDINGS: Type I or II F.R.*.. 121,00 Type II— 1-Hour........ 98.00 Type 11—N................ 93.70 Type 111- l-Hour 101.80 Type 111—N 98 20 TypeV l-Hour...... 93.10 Type V—N...... 8980 19. PUBUC GARAGES: Type I or HER.*. 48.00 Type I or II Open Parking" 36.00 Type II- N. 27 50 Type III—1 Hour 3630 Type 111 N 32 30 TypeV—1 Hour. 33.00 20. RESTAURANTS: Type 111—l-Hour........ $95.50 Type III—N................ 92.30 TypeV-l-Hour.......... 87.50 TypeV-N.................. 84.00 21. SCHOOLS: Type 1 or II F.R............ 109.00 Type II—l-Hour.......... 74.40 Type HI—l-Hour......... 79.60 Type 111-N................. 76.60 Type V—l-Hour.......... 74.60 Type V—N................. 71.20 22. SERVICE STATIONS: Type II- N 6590 Type HI—1-Hour......... 68.70 Type V-l-Hour.......... 58.50 Canopies................... 27.50 23. STORES: Type f or If F.R.'.......... 80.80 Type 11—l-Hour.......... 49-40 Type 11—N................. 48-30 Type HI—l-Hour......... 60.10 Type 111—N....„...,.,„.. 56,40 TypeV—l-Hour......... 50.60 Type V—N.................. 46.80 24. THEATERS: Type I or 11 F.R............ 107.70 Type III—l-Hour......... 78.40 Type III—N................. 74.70 TypeV—l-Hour.......... 73.80 Type V—N.................. 69.80 25. WAREHOUSES—: Type I or 11 F.R........... 48.40 Type II or V—l-Hour 28.70 TypellorV—N........ 27.00 Type 111-l-Hour......... 32.60 Type 111—N................. 31.00 EQUIPMENT AIR CONDITIONING: Commeraaf............ 4.10 Residential............. 3.40 SPRINKLER SYSTEMS.. 2.60 Add 0.5 percent to total cost for each story over three. Deduct 20 percent for shed-only buildings. Deduct 11 percent for mini-warehouses. REGIONAL MODIFIERS The following modifiers are recommended for use in conjunction with the building valuation data. Additionally, certain local conditions may require further modifications. To use these modifiers, merely multipty Ihe hsted cost per square foot by the appropriate reg»ona) modifier. For exampte, to adjust trie cost of a Type III One-hour hotel building of average construction for the Iowa area, select Regional Modifier 0 80 and unit cost from valuation data. $85.80. 0 80 x 85 80 $68 64 adjusted cost per square foot) Eastern U.S. Mofttfler Eastern U.S. cwrt.) Modfffer Central U.S. coot.)Modmef Western U.S. Modifier Connecticut. 0.95 Pennsylvania Kansas.......... 0.74 Alaska........... 1.30 Delaware. 084 Philadelphia. 0.96 Kentucky... 077 Anzona.......... 0.82 DtStnct of Columbia. 0 87 Other 083 Louisiana. 078 California Ronda. 0 74 Rhode Island 0.94 Michi^n........... 084 LosAngetes...... 100 Georgia 0.68 South Carolina 0.70 Minnesota... 086 San Francisco Bay Area 1 13 Maine 081 Vermont 0.80 Mississippi..... 0.71 Other. 094 Maryfand 0 79 Virginia.. 0.73 Missoun. 0 78 Coforado... 081 Massachusetts 0.94 West Vir^nia 082 Nebraska........ 0.75 Hawan.. 1.14 New Hampshire... 0.82 North Dakota.. 0.80 Idaho 080 New Jersey. 0.91 Central U.S. Ohio 0.80 Montana 0.79 New York Alabama....... 0.72 Oklahoma............. 0.71 Nevada............. 0.89 New York City. 1.16 Arkansas.................. 0.70 South Dakota 0.78 New Mexico..... 0.76 Other. 0.87 Illinois................ 0.87 Tennessee......... 0.72 Oregon 0.83 North Carolina 0.70 Indbna 0.82 Texas. 0.74 Utah 0.75 Iowa 0.80 Wisconsin. 0.85 Washington 0.80 Wyoming..... 0.80 buildings;.inrn'u-. March-Aprif 2001 53 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯!&SCHEDULE OF FEES AND CHARGES PAGc 21 POLICE Processing Time By Section Processinp Tme by Patrol Officer 40 minutes Steps Invoh/ed n Handling CHP 180: Request registration/Stolen Infonnation Via Radio Inventory Vehicle/Complete CHP 180 Report OeCver Report to PQfice Station Log Report Into Report Ledger Attach Computer Printout to Report Processing Time In Communications: 4 minutes Steps involved in Handftig CHP 180: Run a Registrafion/Stoten Check Re^ RegteUaflon Infcxnution to ReM Offlcer Complete Log Card Telephone Tow Agency Complete Tow Ledger Processing Time by Watch Supervisor Sgt): 5 minutes * Steps involved Handftig CHP 180: Rewew Report for Aaiura^Compfeteness Log report as Approved" in report tedger Assist Records/Approve Release of Vehicle Processing Time in Records Section: 46 minutes * Steps Involved in Handling CHP 180: Processing: 5 minutes Accepting Report and Pull Case Folder Run 28/29 to Verify Infonnation Notification: 10 minutes Complete Notrfication Form And Mail to R^O. L/0 and Storage Company RIe Wfth Case Entry of Report: 10 minutes Enter Case and R/0 Into Computer System BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯"&SCHEDULE OF FEES AND CHARGES PAGE 22 Release: 10 minutes Check JDIC or Case- Ledg3r lor Case Number Venfy fVO Information and License Status Get Defective Approwi for Release if Not Indicated by Patrol Complete Form for FVO Signature Make Copy of Release for FVO to Present to Storage Company Directions to Storage Company Refite Report Paperwork Not Current: 3 minutes Send New WO to DMV for Registration Update Send WO to DMV o Piay Expired Registration, Upon Return Perform Release1 Again Phone Contact 5 minutes Obtain License Number From WO Check JDtC or Case Ledger for Case Number Pu|l Case and Oetennhe Cause of Storage OSJ/»oeo<y^foraRecovwedVehtote.forOK(oRetease TeB R^O What is Necessary to Obtain Release RelteCase Notice of Impound Relumed: 3 minutes Pud Case to Detemihe if Vehicle Has Been Released Mark Notifcation Fbnn of Non-Retease and Send Copy to DOJ Attach Returned Envelope to Original Storage Form Refite Case COMPENSATION RATES Position Police Officer Dispatcher Police Sergeant Records Clerk Hourly Rate" S 15.93 11.30 19.38 9.36 Benefits'" $8.44 3.96 10.27 3.28 Total $ 24.37 15.26 29.65 12.64 3rd Step Employee Sworn at 53 %/N on-Sworn at 35% BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯#&SCHEDULE OF PEES AND CHARGES PAGE 23 TIME AND MOTION RATES Position Police Officer Dispatcher Pofce Sergeant Records Clerk Time 40 minutes 4 minutes 5 minutes 46 minutes Pay Rate $ 24.37 15.26 29.65 12.64 Cost $16.40 1.00 2-45 9.66 Total Cost $29.51 BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯$&Staff Report Amendment to Resolution 2000-11 Attachment A" Current Police Reports: $20.00 Includes crime reports, collision reports. clearance letters, repossession forms, SDTs and tog cards) Police Background Investigations-Civil $20.00(hourty) Citation Verification-Equipment Violations $15.00 Fingerprints Applicant supplies cards & forwards to DOJ for clearance Department provided cards and forwards to DOJ for clearance Administrative Fee * Impounds $10.00 + State Fee $15.00 + State Fee $12.00 per set Impound/Stored Vehicles-Release $45.00 $90.00 Impound/Stored Vehicles for 30 days-Release $45.00 $100,00 DUI Stored Vehicle Release $250.00 Vendor Carts Human Powered) $120.00 Vendor Merchandise Post Court Dispo) $45.00 Shopping Cart Retrieval Per Cart) $5.00 * ADJUSTED COMPENSATION RATES Position Hourly Rate** Benefits*** To^pl Police Officer* $39.60 Dispatcher $17.22 Police Sergeant $32.10 Records Specialist $14.27 $18.31 $57.91 $ 5.01 $22.23 $14.18 $46.28 $ 4.67 $18.94 * Calculated 1.5 Police Officers ** Step 5 Employee r** Calculated Hourly Rate for Step 5 Employee BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯%&OFFICIAL POLICE GARAGE RATE INCREASES FOR 1996 rOW RATES Standard vehicles Heavy Duty Tow Heavy Duty Special Equipment) Heavy Duty Hazardous Cargo) STORAGE RATES Standard Vehicles Trucks Over 1 Ton fucks/boats/house trailers under 20 feet) * 4 TfucksffloatsHraUers over20feel) Motorcycles Major Component Parts Bulk Items Additional Personnel Removal of Stolen Vehicle Component Pans CURRENT RATE S71.25 $139.50 $208.75 $313.00 CURRENTRATE $13.20 $15.00 $19.75 $4.25 $3.25 $0.10 per sq. ft:' $30.75 $40.00 per hour PROPOSED RAT^= $77.00 $150.50 $225.00 $337.50 PROPOSED RATE $14.50 $16.00 $21.50 $4.50 $3.50 same S33.00 $43.00 per hour Removal o? Bulk Items S71.25 per hour S77.00 per hour BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 007 CC RESO;¢f4¤¯&&SCHEDULE OP FEES A» HARGF-S PAGE WWK Topic Page General Fees Community Center/Recreation Fees Engineering Fees Planning Fees Building Fees Police Fee^ 1 3 4-6 7-13 14-15 16-20 + attachment A 20- Vf % BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 &PAGE 10 SCHEDULE OF FEES ANu CHARGES Sewer Connection Permit Fee Residential Commercial & Industrial Rectangular lot depth. 100 ft or less Rectangular lot depth« more than 100 ft Irregular lot frontage 60 ft or less Jnegutar tot. frontage greater than 60 ft Each e)&6ig btoial ufflbed by propeity ownei(s) 50.00/per dwelling unil 20.00 dwelling unrt if more than 10 units 100.00 per unit 5000 per unit if more than 10 units 8-00 ft 8.00ft+ 0.01 sA over 100 ft of depth 8.00ft or 0.08 s-i for first 6000 s-f., whichever is greater. + 0.01 sJL for an areas in excess of 6000 &i 8.00ft+ 0.01 sAfofaB areas h excess of 6000 s.f. 175.00 PubHc Works Permit Note; Pennt fees are computed at 5% of the total valuaflon of t^ under the penmiL The unit costs fisted shafl be used to calculating the total work valuation as appropriate, lnnoewn(challthemWrmimpenn»feebetessthan $10000. The cost of removals shatt be calculated at 60% of the construction cost Curt) Only 10.00 Lf- RotI Curb 12.00 Lf. Cross Gutter 16.001.f- Curb and Gutter 16.00 Lf. Parkway Landscaping 2.00 s.f. Sidewalk 4- P.C.C.) 3.50 s.f. Drive Approach 6" P.C.C.) 4.50 s.f- Crushed Aggregate Base 1-25 s.f. AsphaK Pavement: 4-thick 1.50 s.f. 4" hick 2.50 s.f. Wheelchair Ramp 4" P.C.C.) 450.00 ea BIB] 37642-U01 2002-U02 007-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9051-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04