Loading...
HomeMy WebLinkAbout2002 020 CC RESO2002 020 CC RESO;¢f4¤‡'RESOLUTION NO. 2002-020 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK AMENDING RESOLUTION NO. 2002- 007 SETTING FEES FOR ISSUANCE, PROCESSING AND FILING OF VARIOUS CITY SERVICES AND PERMITS IN THE CITY, SPECIFICALLY THOSE RELATING TO BUILDING AND PLAN CHECK FEES WHEREAS. Resolution No. 2002-007 generally sets forth the costs for the issuing, processing and filing of various City services and permits; and WHEREAS, the City Council desires to revise the fee schedules relating to Building and Plan Check Fees set forth in Resolution No. 2002-007. NOW, THEREFORE. THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES HEREBY RESOLVE. DECLARE, DETERMINE AND ORDER AS FOLLOWS: SECTION 1. That pursuant to Section 150.003 of the Baldwin Park Municipal Code, the cost of issuing, processing, and filing Planning entitlements, and for obtaining the use of City services and facilities for the City Council shall be in accordance with the attached Building Fees, attached hereto and incorporated herein as Exhibit A". SECTION 2. That the fee schedules set forth in Exhibit A" hereto shall supersede those fee schedules provided in Resolution No. 2002-007 relating to Building and Plan Check Fees. SECTION 3. That all fees set forth in Resolution No. 91-67 that are not in conflict with those established by this Resolution shall remain in full force and effect. SECTION 4. That the fees established by this resolution shall become effective immediately. SECTION 5. That the City Clerk shall certify as to the adoption of the Resolution and shall cause the same to be processed in the manner required by law. APPROVED AND ADOPTED on this 20th day of February 2002. Mayor BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'Resolution 2002-020 Page 2 ATTEST: STATE OF CALIFORNIA COUNTY OF LOS ANGELES CITY OF BALDWIN PARK ss. I, ROSEMARY RAMIREZ, Chief Deputy City Clerk, of the City of Baldwin Park do hereby certify that the foregoing Resolution was duty and regularly passed and adopted by the City Council of the City of Baldwin Park at its regular meeting of the City Council on February 20. 2002, by the following vote: AYES: COUNCILMEMBERS: Marten Garcia, Mayor Pro Tem Gair and Mayor Lozano NOES: COUNCILMEMBERS: Ricardo Pacheco ABSENT: COUNCILMEMBERS: Bill Van Cleave ABSTAIN: COUNCILMEMBERS: None Rosemar^aaBfooz, CMC Chief Deputy City Clerk BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'CITY OF BALDWIN PARK EXHIBIT A" SCHEDULE OF FEES AND CHARGES RESOLUTIONW-W S^B^r 00^1 \^0 QCt^\\ SPECIAL SERVICES Government Reports o^>^ Municipal Code Complete $75.00 Municipal Code Addendum Subscription 20.00 Zoning Code Complete COSTTO Zoning Code Addendum Subscription DUPLICATE) City Budget 20.00 General Reports 1st sheet of seriess= 1.00 each additional 15 PoBce Reports 15.00 Police Background Investigation Civil 15.00 hour a(atJonVenficatk>n-Equ4)mentViotat^ 10.00 Agenda Packet 25.00 General Plan only) 55.00 OR COSTTO DUPLICATE 2dnJogMap 8.00 General Plan Map 5.00 BUBdk«PIanRecofds Letter Size 10sheet OtherSfce Ssheet Photographs $10.00 A« Sizes Miscellaneous Permits Entertainment PennR Initial Entertainment Permit Renewal Gun PennB Application Business Alarm Pennte Inftral Hookup Strong Motion Instrumentation Fee Booking Fees C?ty Jail) Fingerprints Applicant supplies card and forwards to DOJ for clearance Department takes prints and forwards to DOJ for clearance Administrative Fee 250.00 175.00 3.00 25.00 0.007% % of construction cost) 75.00 10.00/set + State Fee 10.00/set + State Fee 9.00/set BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'EXHIBIT A" KiSo AW)-77 CHART OF FEES BALDWIN PARK METROLINK STATION MONTHLY PARKING PERMIT RESIDENT NON-RESIDENT General Public $10.00 $20.00 Disabled* $0.00 $0.00 Senior/Student** $0.00 $20.00 *Any individual, whether a resident or not. with a valid California Department of Motor Vehicles Disabled Parking placard can obtain a Monthly Parking Permit at no charge. ** Residents age 60 or older with valid identification, and residents with valid student identification can obtain a Monthly Parking Permit at no charge. BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'PAGE SCHEDULE OF FEES A CHARGES Impounds Impound/Stored Vehicles Release Driving Under Influence DUI)/Stored Vehicle Vendor Cans human Powered) Vendor Merchandise After Court Disposition) Shopping Cart Retrieval par can) Appeals Fifing and Processing Fee Zoning and Subdivision Appeals Public Nuisances Abatement Costs Exceeds $1.000 Abatement Costs less than $1,000 $ 40.00 230.00 108.00 40.00 3.00 $ 50.00 ea 300.00 5000 ea 10.00 ea Rreworks Pennfl and Processing Fee Compliance Deposit & Inspection Fee Uabaity Insurance Returned Checks NSF/etc Bicycte License Annual Animal Control OogUcense Parade Permit and/or Demonstrations Refuse Collection and Disposal No Charge Non-Refundabte 50.00 As Required 25.00 * Fee Set by State Fee Set by County 25.00- * Set by Councfl Resolution Temporary Waste Bins Public Rght-of Way Only 20.00 ea Barricades and Reftective Tape}) two week period Non-Exclusive Franchise Fee Commercial/Industrial 750.00 Business License Transfer to New Location 25.00 ea Duplicate Certificate Lost or Destroyed 5.00 ea Processing and Inspections Fee New Ucense) One Time Fee Commercial License 75.00 Home Occupation 25.00 Bankruptcy. Fire and Ctose-Out Sales Ring and Processing Fee 30 Days 50.00' ea 60 Days 100.00 ea 90 Days 150.00 ea Complete Business License Address Computer Print-Out 75.00 ea Bingo Penmils 50.00 year BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'HEOULG Ol7 FEES AND CHATI^- AGE 3 Court Referral Program 1 120 Hour's 121 Hours Rus Worker's Compensation Fee Dance's PennM Fifing and Processing Fee Safety Sen/ices Handbills Pemi'rt Filing and Processing/ Massage Parlors Penn'rt Ring and Processing Fee New Employee Checks Taxfcabs CertiEtete of Conventenro and Necessity Annual Renewal oCCertfficate UabBay Insufanoe Changes in Drivecs, Vehfctes, 00. Temporary Use Pennfts Fi&TO and Investigation Fee Attat1iment#3 20.00 25.00 20.CO 50.00 jea Sd by P.O- 50.00 ea 250.00 25.00 500.00 35000 As required As required 115.00 ea l:««apofMyO«Ido^r Exhibits filing awi Investigation Fee Businesses under 10,000 square fe« $50 p/6 aonth- Businesses above 10,000 cquace feet $150 P/6 month Street Benches Pennft Fi6ng and Processing fee Bench Removals by C8y Bench Storage by City max. 60 days Street Banners Pennft RCing and Processing Fee lOXXYbench/yr 25.00 ea lO.OC/weeR/ea 50.00 ea Yard Sates Only Allowed 1st weekend of March. June, September and December Motorized Vending Catering/Ice Cream/Produce Trucks) Background Check Fingerprints and/or Palm Prints s Sellers Penn'rt Owner) Truck Inspection inspection Vendor's Penmit Per Driver) No Fee 100.00 50.00 50-00 35.00 17.00 15.00 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'EXHIBIT A COMMUNITY CENTER/RECREATION Park Facilities and Recreation Activities EQUIPMENT/SUPPLIES TV/VCR & P.A. System 25.00 flat per day Slide Projector & Screen 15.00 flat per day Coffee 10.00 50 or less) 15.00 50 or more) WEIGHTROOM/BOXING GYM Residents Annual Monthly 8-17 years 40.00 4.00 18 yrs & over 100.00 16.00 Non-Residents 8-17 years 80.00 8.00 18 yrs & over 200.00 25.00 POOL FEES Admissions Residents Youth-0-17 0.50 Adults-18-54 1.00 Sr Citizens 55 and Older 0.00 Swim Classes Youth Registration 20.00 35.00 Adult Registration 30.00 50.00 AQUATIC FACILITY 1-20 people, 2 lifeguards) 50.00/hr. 75.00/hr 20-50 people. 3 lifeguards) 75.00/hr. 150.00/hr. 51-100 people, 4 lifeguards) 100.00/hr. 200.00/hr. 101-15050 people, 5 lifeguards) 150.00/hr. 250.00/hr. COMMUNITY CENTER Meeting Room 15.00/hr. 30.00/hr. Double Size) 30.00/hr. 50.00/hr. Cleaning/Damage Security 100.00 100.00 Gymnasium Operating Hours) 35.00/hr. 70.00/hr. Non-Operating Hours) 45.00/hr. 80.00/hr. Cleaning/Damage Security 150.00 150.00 Game Room 25.00/hr. 50.00/hr. Cleaning/Damage Security 100.00 100.00 Biweekly 3.00 9.00 5.00 15.00 Non-Residents 1.00 2.00 1.00 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'EXHIBIT A SENIOR CENTER Assembly Hall 1-100) 101+) Decorating Fee Cleaning/Damage Security BALLFIELD Softball Field Lighting *Cleaning/Damage Security Resident $70.00/hr. 90.00/hr. 30.00/hr. 300.00 30.00/hr. 20.00/hr. 50.00 60.00/hr. 40.00/hr. 50.00 Non-Resident $80.00/hr. 100.00/hr. 30.00/hr. 300.00 FAMILY SERVICE CENTER General Hall/Kitchen Decorating Fee Cleaning/Damage Security PICNIC FACILITIES Shelter 20.00/hr. 20.00/hr. 150.00 25.00 flat fee 30.00/hr. 20.00/hr. 150.00 25.00 flat fee WALNUT CREEK PARK Outdoor Assembly Shelter Cleaning/Damage Security 20.00/hr. 150.00 35.00/hr. 150.00 Cleaning/Damage Fees imposed at the discretion of the Recreation and Community Services Director or his designee BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡ 'SCHEDULE OF FEES AND CHARGES PAGE 7 ENGINEERING FEES Encroachment, Moving and Load Regulations Permit Fifing and Processing Fee for Moving Load or Vehicle Over Width, Height or Weight Per Occurance / Encroachments Gunfte Storage Gunite Cleanup-Deposit returnable) Overhead Structures 15.00 ea 25.00 ea 20.00 ea 300.00 ea The fee for other encroachment permits not fisted win be determined by the Director o( Public Works Pavement Restoration UflityCuts 4.00s.f. $3.70 cj. Refundable if work performed by permittee) Engineering Fees Expecfte Map/Plan Check 11/2 times the fee * i* For items not cowced in the Fae schedule a minbnum of at the minimum hourly rate of S 50.00 Subdivision Rflng and Plan Check Fee Tentative Parcel Map 1500.00 Tentative Tract Map 2000.00 Fifsl Ten Lots or Unrts) Parcel Map Final Map) Tract Map F(nal Map) Easement Deed" Easement Checking' Monument Inspection + 45.00/Lot or Unrt Lots or Units 11-25) + 25.0fl/Lot or Unit Lots or Units 26-50) 2400.00 + $60/Rarcel 2400.00 + SCO/Lot 450.00 400.00 425.00 ea Parcel Map 800.00 ea Tract Map Verification that City Map is consistent with conditions of tentative approval 300.00 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡ 'PAGE 8 SCHEDULE OF FEES AND CHARGES Verification thai Crty Grant of Waiver and Certificate of Compliance are consistent with conditions of tentative approval Agreement and/or improvement Security Extension of Time for Improvement Agreement \ Fourth Submittal.of Originals and/or Prints Sixth Submittal of Originals and/or Prints Bghth Submittal of Originate and/or Prints and each Subsequent Submittal Extension of Time for Final Map Sbc Months One Year 300.00 300.00 ea 250.00 pfcr letter 450.00 1250.00 1500.00 250.00 500.00 Recofdatton Fees F«stSheet Second Sheet and AH Subsequent Sheets Cefiaication rf Correction Certificate of CompBance? 100000 Street Vacation- Covenant and Agreement' Lot the Adjustment Mscefeneous Documents 6.00 2.00 ea 500.00 1000.00 60000 150000 600.00 The fee for these terns includes only the cwfew of the legal description and the research associated wfth the particular case. However, rf he Cfty provides the legal description add $150 to the fee indicated. Improvement Plans A fee shall be charged at the time of plan subm'rttal in the amount set forth below. 1-Plan Check: Improvement Valuation S $ S S S 100.000) $ 1.000.000 and over 0-999 1.000-9,999 10.000-49.999 50,000 99,999 100.000 999.999 Fee $ 150.00 $ 150 + 11% x Valuation 1,000) $1,140 + 8% x Valuation 10.000) $4.340 + 4% X Valuation 50.000) $6.340 + 2% x Valuation $24.340 + 1.5% x Valuation 1.000.000) BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡ 'SCHEDULE.OF FEES AND CHARGES PAGE 9 2. Inspection: Inspection fee shall be 100% of he plan check fee. Drainage Pians 120.00 500.00 One 1) ol to three(3) ots Four 4) lots or more Erosion Plan Inspection Fees Less than One Acre 50.00 200.00 One Acre but Less Than 5 Acres GRADING AND EXCAVATION VollnCYor Fraction of 100 1.000 10.000 10.000 an Check Yardage Base Amount 50 to 100 Sf 140 minimum 101 to 1,000 CY $ 1404. 60 per OOlto 10.000 CY $ TOh- 70 per 001 to 100.000 CY $1^30^ 80per Over 100LOOOCY $2.050+ SOper Inspection' 1 ifnUt Issuance Base Amount VollnCYor Fraction of 100 1.000 10000 10.000 Yardage o 100 CYS 280 minimum 01 to 1.000CY S 2801- 70per 00010 lOiOOOCY $ 9104: 100 per 000(0 KXMWCY $ 1.81(h- 200 per Over 100.000 CY $8.610<- 100 per Fourth Submitta! and each Subsequent Submittal for Grading, Drainage and Improvement Plan Checks Reproduction Costs Bluelhe prints 24" x 18*') Btuetine prints 24" x 36") Sepia any size) Final Map Blueline Copy 8 1/2' x 11' or 8 1/2^ x 14-) Materials Purchase Plain Mylar 24" x 36*') Plan & Profile Myfar 24" x 36') Exceeding CYof 100 1.000 10.000 10.000 Exceeding CYof 100 1.000 10.000 100.000 25% of original plan check fee 5.0(V First & S.OVeach additional prini 25 ea 5.00 ea 6.00 ea BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡ 2002 020 CC RESO;¢f4¤‡ 'SCHEDULE OF FEES AND CHARGES PAGE n Sewer Installation: 12-0 V.C.P. 8"0 V.C.P. GTO V.C.P- Manhote Sfwef Saddle Dye Test permittee to provide dye)' 55.00 l.t 50.00 U. 45.00 l.f. 2000:00 ea 200.00ea 15000 ea Trench Length Up to 50' 51' to 250r 25V to lOOT OwrlfrXr UTiLnry PERMITS Plan Check Fee Minimum $ 25 $25 + $.25Lf> 50* $50+ $.15Lt>2501 $16S+ $.05Lt> 1000 Issuance and Inspection Fee Min.$75 City does A.C. Min. $ 100 UtiL Co. does A.C, when directed $100+ $ 0 it 50* $200+ $.40LL>2501 $400+ $J30Lt> 1000 Up o200 s-i add addiCfonal $4.00 s± for pavir^to be peffo^ / i City to perform the paving unless othecwise directed by the Director of Public Works, NOTE: Fees applicable to work performed by both open trench and/or boring methods of installation- Non-Trench Work Up to 100 s.f. Over 100s.f. s.f. Plan Check Fee Minimum $25 $25+ $.30 s.f. 100s.f. Issuance and Inspection Fee Min. $75 Cfty does A.C. Min. $125 M Co. does AC. when directed W25+- $1.00 s.f> 100 Storm Drain Construction of New Catch Basin C.B., Transition Structure. or Manhole M.H. Modification of he existing C.B. or M.H. Drain Pipe/Roof Drain Parkway Drain Storm Drain Mainline RCP) Storm Drain Lateral RCP) 3500.00 ea 2500.00 ea 20.00 1.1. 600.00 ea 130.001.1. 90.00 1-f- BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'SCHEDULE OF FEES AND CHARGES Traffic Striping Of Lane Line Marking LeUering/Anow Street Name Signs 2) & Post Traffic Regulatory Sign Traffic Signal 2 to 4 phase) Traffic Signal 5 to 8 phase) Traffic Signal Modification Street Light Street Tree Installation ea Relnspection Fee 3rd and Each Subsequent Inspection 65-00 Site Review Plans Room Addition More than $10.000 PAGE I? 0.15 U. 15^00 ea 25000 ea. 170.00 ea $70.000.00 90.000.00 15.000.00 2.000.00 ea 175.00 2&00 j> Street Name Change Application Fees t 1,000.00 Cost of signs, upon approval of street name change, determined by the Director of PubfcWorics TEMPORARY USE PUBUC WORKS PERMIT FEES INCLUDES UTILITIES Lane Closure No Street Cuts Per Ocpurance Monthly Permit Annual Permit Approved Road Closure H Public Convenience Dictates 100.00 350.00 3.000.00 500.00 day All utility permits for excavation or street cuts in the Cft/s right-of-way or in the City's future right-of-way as determined by the City's General Ran shaH be issued to utility companies. BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'SCHEDULE OF FEES AND CHARGES u PAGE 13 PENALTY-WORK COMMENCED PRIOR if any-work is commenced on public right-of-way wrUiout a. permit, the Permittee must obtain an after-the-fact permit If it is detennined that the work was an emergency m nature and it is approved by the Director of Pubfc Works then the after-the4act permit fee will be charged as a regular pennrt fee. Afler-the-Fact Pormft Issuance Doubte the Total Fees BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'SCHEDULE OF FEES AND CHARGES PLANNING FEES Planning Fees Administrative Adjustment Zone Variance or Conditional Use Pennit Zone Variance Single Family Single Lot) Amendmer4 to the Zoning Code or he General Plan Zone Change Onty Development AQreement Development Plan Environmental Review Categorical Exemption Negative Declaration Environmental Impact Report review only) Environmental Impact Report preparation) incurred Combined PubGc Hearings PAGE 14 500.00 1.000.00 325.00 2,500.00 1.800.00 Actual Costs Incurred by Staff 1.50000 60.00 180.00* 70.00 hT Actual costs 100% of highest and 50% of any additional Plus any reasonable expenses for staff or consultant services. Zoning Map Copy General Plan Map Copy Appeals, Zoning To Planning Commission or City Council) 300-00 Appeals. Tentative Maps Tkne Extension Sign Permit Plan Review/Design Review CommerciaI/Industrial/Office New Construction Square Feet 1 1.000 1.00-1 3.000 3.001 6,000 6.001 10.000 10.000-15.00^^^^ 15.001 2ft0(5o CONTINUED NEXT PAGE) aOOea 8.00 ea 300.00 400.00 50.00 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'SCHEDULE OF FEES AND CHARGES PAGE 15 1.300.00 1.500-00 i.750.00 2,000.00 2.300.00 2,600.00 3.000.00 The initial plan review/design fee shall cover initial review of the plans plus review of up to two revised ptans. Further review shafl be charged at 33^ pen^nt of tt^ base founded to the nearest $5.00) for each revision. Publications Zoning Code Complete Zoning Code addendum Subscription General Plan only) AT DUPLICATION COST BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'EXHIBIT A Design Review Fees New Construction-Square Feet Number of Residential Dwelling Unite Maximum Commercial Office/Industrial Remodel Value Proposed Fee 1-1,000 $100,000 $250 1,001-3,000 2-4 $200,000 $400 3.001-6.000 5-6 $400,000 $575 6.001-10,000 7-10 $700.000 $775 10.001-15,000 11-15 $1.000.000 $1,125 15,001-20.000 16-20 $1.500,000 $1,375 20.001-27,000 21-25 Over $1.500,000 $1,625 27.001-35.000 26-35 $1,875 35,001-45,000 36-45 $2,175 45.001-60.000 46-60 $2,500 60.001-100,000 61-100 $2,875 100.001-150,000 101-150 $3,250 Over 150.000 Over 150 $3,750 **The Initial plan review/design fee shall cover initial review of the plans plus review of up to two revised plans. Further review shall be charged at 33.3 percent of the base fee rounded to the nearest $5.00) for each revision. BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'EXHIBIT A" SCHEDULE OF FEES AND CHARGES BUILDING FEES Building Fees AEIHB & S Occupancies*) 1. Permit Fee: Valuation fees see BUILDING ATTACHMENT I) 2. Plan Check Fees: a. Plan Check fee is 85% of the building permit fee, with a minimum of $82.00. b. Handicapped plan check fee is 5% of the building permit fee. c. Plan check fees will not be charged for re-roofing or air conditioning when plans are not required. d. For R1. R3 & U Occupancies, use 80% of the fee tables above. 1) Tracts Final tract map subdivisions consisting of five 5) or more parcels prepared in accordance wrth the provisions of Section 152.01, the City's Subdivision Regulations and the Subdivision Map Act, and whereas specific detached dwelling unit floor plans are used more than two 2) times, and are all located on regular shaped lots wrth similar topographic conditions, will be calculated on a lump sum method will be tabulated on the combined total square footage of the detached dwelling unit floor area of the same specific floor plan. BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'SCHEDULE OF FEES / D CHARGES PAGE 16 BUILDING FEES Building Fees AEIHB & S Occupancies*) 1. Permit Fee: Valuation fees see BUILDING ATTACHMENT I) 2. Plan Check Fees: * Plan check fee is 85% of the burtdmg permit fee. with a minimum t $82.00. Handicapped plan fee is 5% of the building permit fee. will not be charged for re-roofing or air conditioning when plans are not fw R1. R3 & U Occupancies, use 80% of the fee tables above. * Plan check requi Building Permits Re-inspection Certificate of Occupancy Original Certificate of Occupancy Subsequent Certificate of Occupancy Temporary Request for Address Change Garage Conversion Valuation I4 Time) Extension of Permit One Time) Special Occupancy Full House) Occupancy Groups R or U Special Occupancy Inspection Other Than Above Re-inspection For Excessive More Than 3) Plan Checks Building Regulations Variance Filing and Processing Fee $75.00 No Charge 50.00 65.00 750.00 + $3.000 for ea. Time after) 3.000.00 Example: 2nd time $6.000 25.00 120.00 150.00 75.00 $75.00 Energy Conservation Regulation Plan Check and Permit Fee 20% of total of building permit and plan check fee Uniform Plumbing Code For Issuing Each Permit In Addition: For each plumbing fixture or trap or set of fixtures on one trap including water, drainage, piping and backflow protection thereof For each building sewer and each trailer park 3ewer Rainwater Systems per drain For each sewer connection For each private sewage disposal system For each sewer cap For each water heater and/or vent $35.00 14.40 18.00 14.40 48.00 36.00 14.40 14.40 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'SCHEDULE OF FEES / D CHARGES PAGE 17 Description For each gas piping system of one 1) to five 5) outlets For each gas piping system of six 6) or more. per outlet For each industrial waste pre-treatment interceptor. including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps. For installation, alteration or repair of water piping and/or water treating equipment For repair or alteration of drainage or venting piping For each lawn sprinkler system or any one meter including backflow protection devices therefor For vacuum breakers or backflow protective devices on tanks, vats. etc.. or for installation on unprotected plumbing fixtures.including necessary water piping one of five. Over five, each Plumbing Re-inspection Fee Uniform Mechanical Code Heating AppBance Relocate or Replace Vent Confort Coding Under 10.000 BTU Over 10.000 BTU Compressor or Boiler Under3H.P. Compressor or Boiler Over3H.P.to15H.P. Over15H.P.to30H.P. Over 30 H.P. to 50 H.P. Over 50 H.P. Gas System Vent Fan Hoods Miscellaneous Permit Fee Re-inspection Fee Uniform Swimming Code $14.40 3.60 18.00 18.00 14.40 14.40 18.00 3.60 $75.00 $18.00 14.40 18.00 24.00 18.00 21.60 42.00 74.40 104.00 14.40 18.00 18.00 18.00 35.00 75.00 Fees Per Building Permit Fee BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'SCHEDULE OF FEES A 3 CHARGES PAGE 18 Electrical Code 30.01 Fees New Construction and Additions Permit Issuance Fee $35.00 + fee for each schedule in Section 30.4 + $.06 per ampere for each service switch 600 volts or less; $.03 per ampere for each additional service switch in excess of 600 volts. In addition the following fees shall apply to each type of construction: a. Gasoline Service Station Buildings b. Drinking or Dining Establishments c. Power Plants Pumping Plants a. Woodworking Establishments, Planning Mills b. Steel Mills, Factories c. Manufacturing Plants. Assembly Plants d. Gasoline Service Station Open Canopies e. Repair Garages. Aircraft Repair Hangar f. Ice Plants, Cold Storage Plants g. Creameries, Bakeries, Food Processing Plants b. Hotel, Motel, Apartment Houses. Lodging Houses i. Dwellings j. Dry Cleaning Description a. Office Building b. Stores, Markets wholesale or retail) c. Hospitals, Sanitariums. Convalescent Hospital d. Nursing Homes. Child Nurseries e. Schools f. Churches, Assembly Buildings g. Amusement Park Structures h. Any Occupancy Not Listed a. Residential Accessory Building, Attached or Detached, Such As Private Garages. Carports. Sheds, etc. b. Hotel. Mote, and Commercial Parking, Garages and Carports c. Warehouses Up To and Including 5.000 s.f. a. Warehouses That Part Which is Over 5,000 s.f. b. Storage Garages Where Work No Repair is Done c. Aircraft Hangars Where No Repair Work is Done $0.18 s.f. 0.18 s.f. 0.18 s.f. $0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. 0.09 s.f. $0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s.f. 0.06 s.f. $ 0.04 s.f. 0.04 s.f. 0.04 s.f. $ 0.03 s.f. 0.03 s.f. 0.03 s.f. BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'SCHEDULE OF FEES t D CHARGES PAGE 19 30.2 Alterations and Additions Where no structural work is being done. or where rt is impractical to use the square footage schedule. $6.00 per circuit 30.3 Minimum Total Fee $18.00 minimum For Any Type of Construction or Installation. 30.4 Fees For Fixed Motors. Transformers. Generators. Heating and Cooking Appliance, etc. Converting all units to H.P. horse power). K.W. kilowatt). K.VA kilovolt ampere) fees shall be determined as follow: 1 Over 1. riot over 5 Over 5. not over 20 Over 20.not over 50 Over 50,not over 100 Over 100, not over 500 Over 500. not over 1000 Over 1000. not over... 30.5 a) Lighting Standards Less than 3 on a site Each additional over3 on a site Lamphotdhg devices, not a part of a lighting standard Festoon Type) Not over 50 Over 50, no over 100 Over 100 30.6 Signs and Outline Lighting One Sign and Gas Tube System Each Additional Sign or Gas Tube System Each Transformer or Batlast Each Motor or Flasher Each Lampholding Device in Connection with a Sign From 1 to 20 inclusive, Next 100 Each additional $7.20 10.80 13.20 20.40 25.20 38.40 54.00 7420 $12.00 3.60 14.40 26.40 38.40 $12.00 8.40 3.60 3.60 36 ea. 18ea. 10ea. BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'SCHEDULE OF FEES D CHARGES PAGE 20 30.7 Temporary, Permanent or Construction Poles Temporary. Underground and Work-Wrth Services: Temporary Underground Services Temporary Work-With Service Residential) Temporary Work-With Service Commercial) $35.00 35.00 35.00 30.8 Miscellaneous Any electrical work for which a permit is required, but no fee is herein provided $18.00 30.9 Annual Maintenance Electrician Fee for each annual Maintenance Permit Fees for all work installed under such permit since date of last previous inspection shall be paid according to the above schedule at the time the annual permit is issued. Where plans are required and the service is'over 400 amps. a plan check fee equal to 60% of the permit fee shall be paid at the time plans are submitted. Uniform Sign Code Fees Fees per Building Permit Fees BUILDING ATTACHMENT I *fr Building Valuation Data SEE FOLLOWING PAGE INSERT Fees as Current BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'RESIDENTIAL VALUATION $0-700.00 $700.00-1.999.00 $2.000.00 $3.000.00 $4.000.00 $5,000.00 $6.000.00 $7,000.00 $8,000.00 $9.000.00 $10.000.00 $11.000.00 $12.000.00 $13,000.00 $14,000.00 $15.000.00 $16.000.00 $17,000.00 $18.000.00 $19,000.00 $20.000.06 $21.000.00 $22.000.00 $23.000.00 $24.000.00 $25,000.00 $26.000.00 $27,000.00 $28,000.00 $29,000.00 $30,000.00 $31,000.00 $32,000.00 $33,000.00 $34,000.00 $35,000.00 $36,000.00 $37,000.00 $38,000.00 $39,000.00 $40,000.00 $41,000.00 $42,000.00 $43,000.00 $44,000.00 $45,000.00 $46.000.00 PLAN CHECK R1, R3, U $24.04 $36.10 $46.39 $56.68 $66.97 $77.26 $87.55 $97.85 $108.13 $118.43 $128.71 $139.01 $149.30 $159.59 $169.88 $180.17 $190.46 $200.76 $211.04 $221.34 $231.62 $241.92 V>wy> $202.50 $272.80 $283.08 $291.23 $299.36 $307.57 $315.65 $323.78 $331.93 $340.07 $348.22 $356.35 $364.49 $372.64 $380.77 $388.92 $397.06 $405.19 $413.34 $421.48 $429.62 $437.76 $445.90 $454.04 BLDG PERMIT R1, R3, U $30.05 $45.12 $57.98 $70.85 $83.71 $96.58 $109.44 $122.30 $135.17 $148.03 $160.90 $173.76 $186.62 $199.49 $212.35 $225.22 $238.08 $250.94 $263.81 $276.67 $289.54 $302.04 $315.26 $323.13. $340.99 $353.86 $364.03 $374.21 $384.38 $394.56 $404.74 $414.91 $425.09 $435.26 $445.44 $455.62 $465.79 $475.97 $486.14 $496.32 $506.50 $516.67 $526.85 $537.02 $547.20 $557.38 $567.55 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'VALUATION $47.000.00 $48.000.00 $49.000.00 $50,000.00 $51.000.00 $52,000.00 $53.000.00 $54,000.00 $55,000.00 $56.000.00 $57.000.00 $58.000.00 $59.000.00 $60.000.00 $61,000.00 $62.000.00 $63,000.00 $64,000.00 $65.000.00 $66,000.00 $67,000.00 $68.000.00 $69.000.06 $70.000.00 $71,000.00 $72,000.00 $73,000.00 $74.000.00 $75.000.00 $76.000.00 $77,000.00 $78,000.00 $79.000.00 $80,000.00 $81,000.00 $82,000.00 $83,000.00 $84,000.00 $85,000.00 $86,000.00 $87,000.00 $88,000.00 $89,000.00 $90,000.00 $91,000.00 $92,000.00 $93,000.00 $94,000.00 $95,000.00 PLAN CHECK R1, R3, U47 $462.18 $470.33 $478.46 $486.60 $492.60 $498.59 $504.58 $510.56 $516.55 $522.55 $528.54 $534.53 $540.52 $546.50 $552.50 $558.49 $564.48 $570.47 $576.46 $582.46 $588.44 $584.43 $600.42 $606.41 $612.41 $618.40 $624.38 $630.37 $636.36 $642.36 $648.35 $654.34 $660.32 $665.31 $672.31 $678.30 $684.29 $690.27 $696.26 $702.26 $708.25 $714.24 $720.23 $726.22 $732.22 $738.20 $744.19 $750.18 $756.17 BLDG PERMIT R1, R3, U $577.73 $587.90 $598.08 $608.26 $615.74 $623.23 $630.72 $638.21 $645.70 $653.18 $660.67 $668.16 $675.65 $683.14 $690.14 $698.11 $705.60 $713.08 $720.58 $728.06 $735.55 $743.04 $750.53 $758.02 $765.50 $772.99 $780.48 $787.97 $795.46 $802.94 $810.43 $817.92 $825.41 $832.90 $840.38 $847.87 $855.36 $862.85 $870.34 $877.82 $885.31 $892.80 $900.29 $907.78 $915.26 $922.75 $930.24 $937.73 $945.22 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'VALUATION $96.000.00 $97.000.00 $98.000.00 $99.000.00 $100.000.00 PLAN CHECK R1, R3. U $762.17 $768.16 $774.14 $780.13 $786.12 BLDG PERMIT R1, R3, U $952.70 $960.19 $967.68 $975.17 $982.66 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'State of California Department of Conservation Resources Agency f^Q Division of Mines and Geology Fee Schedule Strong-Motion Instrumentation and Seismic Hazard Mapping Fee Category 1 Construction 1 to 3 Story Residential)* i;;: Method 1. The fee amount can be calculated from the permit valuation amount using the formula: Valuation Amount) X 0.0001 Fee Amount As an example, the feefora $128,580 valuatiohis $128,580x0,0001 or $12.86: Method2. As an alternative to Method 1, the fee for a given valuation can be calculated:using the foflowing^csin table, as. illustrated below: The fee amount can be obtained by. breaking the evaluation amount into parts and using the entries in this table. An example for a permit valuation of $128,580 is shown at the right: \ i J 100,000 20,000 8,000 500 80 $10.00 2.00 0.80 0.05 0.01 $128,580 $12.86 Fee Amount Notes: 1) The minimum fee is 50 cents, so the fee for any valuation up to $5,000 is simply $.50. 2) Category 1 construction includes residential buildings 1 to 3 stories in height, except hotels and motels. Single family houses, duplexes and quadruplexes are in Category 1. Condominiums and apartment buildings are in Category 1 only if they are 3 stories or less in height. 3) A building" is-defined as a structure built for the support, shelter or enclosure of people, animals or property. Pg. 1 of 2 9/92 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'COMMERCIAL VALUATION $0-700.00 $701.00-2.000.00 $2.000.00 $3,000.00 $4.000.00 $5.000.00 $6.000.00 $7,000.00 $8.000.00 $9,000.00 $10,000.00 $11,000.00 $12.000.00 $13,000.00 $14,000.00 $15,000.00 $16.000.00 $17,000.00 $18,000.00 $19,000.00 $20,000.00 $21.000.00 $22.000.00 $23,000.00 $24,000.00 $25,000.00 $26,000.00 $27,000.00 $28,000.00 $29,000.00 $30,000.00 $31,000.00 $32,000.00 $33,000.00 $34,000.00 $35.000.00 $36,000.00 $37,000.00 $38,000.00 $39.000.00 $40,000.00 $41,000.00 $42,000.00 $43,000.00 $44.000.00 $45.000.00 $46.000.00 PLAN CHECK AEIHB & S $82.00 $82.00 $61.61 $75.28 $88.94 $102.61 $116.28 $129.95 $143.62 $157.28 $170.95 $184.62 $198.29 $211.96 $225.62 $239.29 $252.96 $266.63 $280.30 $293.96 $307.63 $321.30 $334.97 $348.64 $362.30 $375.97 $386.78 $397.60 $408.41 $419.22 $430.03 $440.84 $451.66 $462.47 $473.28 $484.09 $494.90 $505.72 $516.53 $527.34 $538.15 $548.96 $559.78 $570.59 $581.40 $592.21 $603.21 BLDG PERMIT AEIHB & S $37.56 $56.40 $72.48 $83.56 $104.64 $120.72 $136.80 $152.88 $168.96 $185.04 $201.12 $217.20 $233.28 $249.36 $265.44 $281.52 $297.60 $313.68 $329.76 $345.84 $361.92 $378.00 $394.08 $410.16 $426.24 $442.32 $455.04 $467.76 $480.48 $493.20 $505.92 $518.64 $531.36 $544.08 $556.80 $569.52 $582.24 $594.96 $607.68 $620.40 $633.12 $645.84 $658.56 $671.28 $684.00 $696.72 $709.44 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'VALUATION $47.000.00 $48.000.00 $49,000.00 $50,000.00 $51,000.00 $52.000.00 $53,000.00 $54,000.00 $55,000.00 $56.000.00 $57.000.00 $58.000.00 $59.000.00 $60.000.00 $61,000.00 $62.000.00 $63.000.00 $64.000.00 $65,000.00 $66.000.00 $67,000.00 $68.000.00 $69.000.00 $70.000.00 $71,000.00 $72,000.00 $73,000.00 $74.000.00 $75,000.00 $76,000.00 $77,000.00 $78,000.00 $79,000.00 $80,000.00 $81,000.00 $82,000.00 $83,000.00 $84,000.00 $85,000.00 $86,000.00 $87,000.00 $88,000.00 $89,000.00 $90,000.00 $91,000.00 $92,000.00 $93,000.00 $94,000.00 $95,000.00 PLAN CHECK AEIHB & S $613.84 $624.65 $635.46 $646.27 $654.23 $662.18 $670.14 $678.10 $686.05 $694.00 $701.96 $709.92 $717.88 $725.83 $733.79 $741.74 $749.70 $757.66 $765.61 $773.57 $781.52 $789.48 $797.44 $805.39 $813.35 $821.30 $829.26 $837.22 $845.17 $853.13 $861.08 $869.04 $877.00 $884.95 $892.91 $900.86 $908.82 $916.78 $924.73 $932.69 $940.64 $948.60 $956.56 $964.51 $972.47 $980.42 $988.38 $996.34 $1,004.29 BLDG PERMIT AEIHB & S $722.16 $734.88 $747.60 $760.32 $769.68 $779.04 $788.40 $797.76 $807.12 $816.48 $825.84 $835.20 $844.56 $853.92 $863.28 $872.64 $882.02 $891.36 $900.72 $910.08 $919.44 $928.80 $938.16 $947.52 $956.88 $966.24 $975.60 $984.96 $994.32 $1,003.68 $1,013.04 $1,022.40 $1,037.76 $1,041.12 $1,050.48 $1,059.84 $1,069.20 $1,078.56 $1,087.92 $1,097.28 $1,106.64 $1,116.00 $1,125.36 $1.134.72 $1,144.08 $1,153.44 $1.162.80 $1,172.16 $1,181.52 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡'VALUATION $96,000.00 $97,000.00 $98.000.00 $99.000.00 $100.000.00 PLAN CHECK AEIHB & S $1.012.25 $1,020.20 $1,028.16 $1,036.12 $1,044.07 BLDG PERMIT AEIHB & S $1.190.88 $1.200.24 $1,209.60 $1.218.96 $1,228.32 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡ 'State of California Department of Conservation sources Agency Division of Mines and Geology Fee Schedule Strong-Motion Instrumentation and Seismic Hazard Mapping Fee Category 2 Construction* Method 1. The fee amount can be calculated from the permit valuation amount using the formula: Valuation Amount) X 0.00021 Fee Amount As an example, the fee for a $1,231,890 valuation is $1,231,890 x 0.00021 or $258.70 Methbd2. As an alternative to Method 1, the fee for a given valuation can be calculated using the following table, as illustrated below: Valu. Fee VahL Fee Vahf.. Fee Valu. Fee Valu. Fee $0-100 $002 200 004 900 006 400 008 500 011 600 013 700 0.15 800 0.17 900 0.19 1,000 021 2JOW 042 3,000- 0.63 4,000 084 6,000 1.05 6,000 1*26 7,000 1.47 8,000 1.68 9,000 1.89 10,000 2.10 20.000 420 30,000 &30 40000 &40 60.000 10^0 60,000 12^0 70,000 14.70 80,000 16.80 90,000 18.90 lOQ^XX) 21.00 200^000 42*00 300UOOO 63«00 400.000 84JX) 600^000 106^)0 600,000 126.00 700,000 147.00. 800,000 168.00 900,000 189.00 1.000.000- 21000 1: ZOOO.OOO 42000 r3/XWXX) 63000 4^)00,000 84000 G/XXUXX) 1,06000 6,000,000 1,26000 7.000.000 1.47000 8,000,000 1,68000 9,000,000 1,89000 The-fee amount can be obtained by breaking the evaluation amount into parts and using the entries in this table. An example for a permit valuation of $1.231,890 is shown at the right: $1.000,000 $210.00 200,000 42.00 30.000 6.30 1,000 0.21 800 0.17 90 0.02 $1,231.890 $258.70 Fee Amount Notes: 1) The minimum fee is 50 cents, so the fee for any valuation up to $2.381 is simply $.50. 2) Category 2 includes all bdildinos not in Category 1. For example. Category 2 includes residential buildings over 3 stories, all office buildings, warehouses, factories and other manufacturing or processing facilities, restaurants, and other non-residential buildings. 3) A building" is defined as a structure built for the support, shelter or enclosure of people, animals or property. Pg. 2 of 2 9/92 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡!'BUILD'NG VALUATION DMA At the request of numerous building officials. Building Standards"' offers the following building valuation data representing average costs for most buildings. Because residential buildings are the most common for many cities, two general classes arc considered for these, one for average" riinstnjcuon and the other for good." Adjustments should be made for special architectural or structural features and the location of the project. gner or lower unit costs may often result. The unit costs are intended to comply with the definition of valuation" in Section 223 of the 1997 Uniform Building Code" and mus include architectural, structural, electncal. plumbing and mechanical work, except as specifically listed below. The unit costs also include he contractor's profit, which should not be omitted. The determination of plan check fees for projects reviewed by the International Conference of Building Officials will be based on valuation computed from these figures, which were established in April 2001. Cost per Squw Occupancy and Type Foot, A«wa«6 Cort porSquw Occupancy and Type Foot. Average Coctpw Squire OccupMicy and Type Foot Averse CotpwSqum Oca^ancy and Typ«> Foot. Aw<e 1. APARTMENT HOUSES:Type lor It F.R'. $8700 Good) $107 10 Type V Masonry or Type III) 71.00 Good) $87.00 Type v Wood Frame. 62 60 Good) $80.40 Type 1 Basement Garage 36.70 2. AUDITORIUMS: Type lor 11 F.R.. 102.80 Type 11 1-Hour. 74.40 Typell—N. 70.40 Type III-l-Hour... 78.20 Type lit N............... 74.20 7. DWELLINGS:Type V- Masonry. $74 20 Good) $95 00 Type V- Wood Frame 66 00 Good) $90 60 Basements— Semi Finished. 19.70 Good) $22 80 Unfinished..... 14 30 Good) $17.40 8. FIRE STATIONS: Type lor 11 F.R. 112.20 Type 11-1-Hour....... 73.80 Type 11—N.... 69.60 Type III 1-Hour... 80.80 Type III-N........... 77.40 13. JAILS:Typel of 11 F.R....... $156.00 Type III- 1-Hour 142.70 TypeV-1 Hour. 107.00 14. LIBRARIES: Type lor 11 F.R 114.10 Type 11- 1-Hour 83.50 Type 11 N 79.40 Type III—1-Hour. 88.20 Type III-N. 83.80 Type V-1-Hour. 82.90 TypeV N.... 79.40 15. MEDICAL OFFICES: Type lorll F.R.*. 117.20 Type 11- 1-Hour.......... 9040 Typell—N.................. 85.90 20. RESTAURANTS:Type 111—l-Hour $95.50 Type lll-N.... 92.30 TypeV l-Hour.......... 8750 Type V—N 84.0021. SCHOOLS:Type 1 or 11 F.R............ 10900 Type 11 l-Hour.......... 74.40 Type III—l-Hour........ 79.60 Typelll—N 7660 TypeV- l-Hour.......... 74.60 Type V—N. 71.20 22. SERVICE STATIONS: Type ll—N 65.90 Typelll—1-Hour.... 6870 TypeV—l-Hour......... 58.50 Canopies............ 27.50 TypeV—1-Hour...... 7480 TypeV N. 69.80 3. BANKS: Type lor 11 F.R.*.......... 145.20 Type 11 1-Hour.......... 107.00 Typell—N................ 103.50 Type III—1-Hour......... 118.10 Type IH N................ 113.80 Type V—1-Hour........ 75.80 TypeV-^. 71.90 9. HOMES FOR THE ELDERLY:Type lor 11 F.R.......... 101.70 Type 11—1-Hour..... 82 60 Type It—N............... 79.00 Type III—1-Hour..... 95.20 Type 111—N........ 91.30 TypeV—1-Hour...... 88.40 TypeV—N.. 85.30 23. STORES:Typel Of 11 F.R.*... 80.80 Type 11—l-Hour....... 49.40 Type 11--N... 48.30 Type lit—l-Hour......... 60 10 Type'"- N...... 56.40 16. OFFICES-:Typel or 11 F.R.*.......... 104.70 Type It—l-Hour........ 70.10 Type 11-N......... 66.80 Type 111—1-Hour...... 75.70 Type 111—N.............. 72.40 Type V—1-Hour.......... 70.90 TypeV—N................. 66.80 17. PRIVATE GARAGES: Wood Frame............. 23.80 Masonry. 26.90 Type IH— 1-Hour... 86.00 Typelll—N...... 82.50 TypeV—1-Hour.......... 83 10 Type V—N................ 80.20 TypeV—1-Hour......... 107.00 Type V-N.................. 102.50 Type V—1-Hour... 50.60TypeV N................ 46.80 4. BOWUNG ALLEYS:Type 11 1-Hour.......... 50.00 Type 11—N... 46.70 24. THEATERS:Type 1 or 11 F.R............ 107.70 Type III—l-Hour....... 78.40 Type 111—N 74.70 Type V—l-Hour........ 73.80 Type V—N.................. 69.80 25. WAREHOUSES***: Type lor 11 F.R........... 48.40 10. HOSPITALS:Type lor 11 F.R.*.... 160.00 Type 111-1-Hour........ 132.50 TypeV—1-Hour.......... 126.40 11. HOTELS AND MOTELS:Typcl or 11 FR.*...... 99.00 Typelll-1-Hour.. 85.80 Type III- N.... 81.80 TypeV 1-Hour..... 74 70 Type V-N. 73-2012. INDUSTRIAL PLANTS:Type lor 11 F.R..... 55.80 Type 11-1-Hour. 38.80 Type 11 N 35 70 Type III- 1-Hour 42.80 Type III N 40 30 Tilt-up 29.40 TypeV 1-Hour... 40.30 Type V N 36 90 Type III—1-Hour. 54.40 Type 111- N. 5090 TypeV-1-Hour 36.70 5. CHURCHES:Type lor 11 FR 9730 Type 11 1-Hour 73.00 Type 11- N.. 6940 Type ill—1 Hour....... 79.40 Type 111 N. 75.90 TypeV- 1-Hour 7420 Type V-N.... 6980 6. CONVALESCENT HOSPITALS: Typcl or 11 F.R.-. 13650 Type 11—1-Hour 94 70 Type III 1-Hour 97 10 TypcV—1 Hour 91.50 Open Carports.... 16.30 18. PUBLIC BUILDINGS:Type 1 or 11 F.R.* 121.00 Type 11 1-Hour....... 98.00 Type It-N 93.70 Type 11 or V- l-Hour. 28.70 Type HOT V-N..... 27.00 Type III- l-Hour. 3260 Typelll—N 31.00 EQUIPMENT AIR CONDITIONING: Commercial........... 4 10 Residential............ 3.40 Type IH-1-Hour 101.80 Type III- N...... 98.20 TypeV-1-Hour 93.10 TypeV- N.. 89.80 19. PUBLIC GARAGES: Type lor 11 F.R* 4800 Type 1 or 11 Open Parking* 36.00 Type 1 N 27.50 Type III 1 Hour 36.30 Type III N-. 32.30 Type V- 1-Hour 33.00 SPRINKLER SYSTEMS.. 2.60 *Add 0.5 percent to total cost for each story over three Deduct 20 percent for shell-only buildings Deduct 11 percent for mim-warehouses- REGIONAL MODIFIERS The following modifiers are recommended for use in conjunction with the building valuation data Additionally, certain local conditions may require further modifications. To use these modifiers, merely multiply the listed cost per square foot by the appropriate regional modifier. For example, to adjust the cost of a Type 111 One-hour hotel building of average construction for the Iowa area, select Regional Modifier 0.80 and unn cost from valuation data, $85.80- 0 80 x 85.80 $68.64 adjusted cost per square foot) Eastern U.S. Modifier Eastern U.S. cont.) Modifier Central U.S. cont.) Mod tfler Western U.S. Modifier Connecticut 0.95 Pennsylvania Kansas.... 074 Alaska..... 1.30 Delaware 084 Philadelphia 0.96 Kentucky. 077 Arizona... 082 Distnct of Columbia 087 Other 083 Louisiana.. 078 California Florida 0 74 Rhode island 094 Michigan 0.84 Los Angeles 100 Georgid 0.68 South Carolina 0.70 Minnesota 086 San Francisco Bay Area. 1 13 Maine 0.81 Vermont 0.80 Mississippi..... 071 Other 094 Maryljnd 0.79 Virginia 0 73 Missouri. 0.78 Colorado. 081 Massachusetts 0.94 West Virginia 082 Nebraska 075 Hawaii..... 1 14 Now Hampshire... 0.82 North Dakota 080 Idaho 0.80 New Jersey 0.91 Central U.S. Ohio 080 Montana 0 79 New York Alabama 0 72 OMahoma........... 0.71 Nevada 0.89 New York CHy 1.16 Artensas......... 0.70 South Dakota 0.78 New Mexico 076 Other 0.87 Illinois 0.87 Tennessee.... 0.72 Oregon......... 0.83 North Carolina 0.70 Infflana 0.82 Texas. 0 74 Utah 0.75 Iowa 0.80 Wisconsin.. 085 Washington..... 0.88 Wyoming 0.80 buildingst.uK'-mS March-April 2001 63 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡"'SCHEDULE OF FEES AND CHARGES PAGE 21 POLICE Processing Time By Section Processinq TJme by Patrot Officer: 40 minutes Steps Involved n Handling CHP 180: Request registration/Stolen Information Via Radio Inventory Vehicle/Complete CHP 180 Report Denver Report to PoBce Station Log Report Into Report Ledger Attach Computer Printout to Report Processing Time n Communications: 4 minutes Steps Involved in Handfing CHP 180: Run a Registra&xVStoten Check Relay Regbtraaon Infonnatkxi to RekJ OH^ Complete Log Card Telephone Tow A((ency Complete Tow Ledger A Processing Time by Watch Supervisor Sgt): 5 minutes Steps Involved in Handfing CHP ISO: Review Report for AoSuraK^Compteteness Log report as Approved* hi report ledger Assist Records/Approve Release of Vehfcte Processing Time in Records Section: 46 minutes A Steps Involved in Handling CHP 180: n Processing: 5 minutes Accepting Report and Pull Case Folder Run 28/29 to Verify Information Notification: 10 minutes Complete Notification Form And Mail to R/0. L/0 and Storage Company File With Case ntry of Report: 10 minutes Enter Case and FVO Into Computer System BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡#'SCHEDULE OF FEES AND CHARGES PAGE 22 Release: 10 minutes Check JOIC or Case Ledg3r tor Case Number Venfy WO Information and License Status Get Defective Approv?! for Release if Not Indicated by Patrol Compile Form for WO Signature Make Copy of Release for WO to Present to Storage Company Directions to Storage Company Refite Report Paperwork Not Current: 3 minutes Send New WO to DMV for Registration Update Send WO to DMV to Pay Expired Registration. Upon Return Perform Release' Again Phone Contact 5 minutes Obtain License Number Rom WO Check JDtC or Case Ledger for Case Number Pup Case and Detennine Cause of Storage Cal OSJ AQway^tor a Recovered Vehicle, for OK to Release TeB FVOWhat is Necessary to Obtain Release RefiteCase Notice of Impound Returned: 3 minutes PuB Case to D^emihe ff Vehfcte Has Been Reteased Maik Notification Form of Non-Release and Send Copy to DOJ Attach Returned Envelope to Original Storage Form Refite Case COMPENSATION RATES Position Police Officer Dispatcher Police Sergeant Records Clerk Hourly Rate" S 15.93 11.30 19.38 9.36 Benefits" $8.44 3.96 10.27 3.28 Total $ 24.37 15.26 29.65 12.64 3rd Step Employee Sworn at 53%/Non-Sworn at 35% BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡$'SCHEDULE OF FEES AND CHARGES PAGE 23 TIME AND MOTION RATES Position Police Officer Dispatcher Police Sergeant Records Clerk Time 40 minutes 4 minutes 5 minutes 46 minutes Pay Rate $ 24.37 15.26 29.65 12.64 Cost $16.40 1-00 2.45 9.66 Total Cost $29.51 BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡%' Staff Report Amendment to Resolution 2000-11 Attachment A" Current Recommended Police Reports: $20.00 Includes crime reports, collision reports. clearance letters, repossession forms. SDTs and log cards) Police Background Investigations-Civil $20.00(hourty) Citation Verification-Equipment Violations $15.00 Fingerprints Applicant supplies cards & forwards to $10.00 + DOJ for clearance State Fee Department provided cards and forwards $15.00 + to DOJ for clearance State Fee Administrative Fee $12,00 per set Impounds Impound/Stored Vehicles-Release $45.00 $90.00 Impound/Stored Vehicles for 30 days-Release $45.00 $100.00 DUI Stored Vehicle Release $250.00 Vendor Carts Human Powered) $120.00 Vendor Merchandise Post Court Dispo) $45.00 Shopping Cart Retrieval Per Cart) $5.00 ADJUSTED COMPENSATION RATES Position Hourly Rate** Benefits*** Total Police Officer* $39.60 $18.31 $57.91 Dispatcher $17.22 $ 5.01 $22.23 Police Sergeant $32.10 $14.18 $46.28 Records Specialist $14.27 $ 4.67 $18.94 * Calculated 1.5 Police Officers ** Step 5 Employee r** Calculated Hourly Rate for Step 5 Employee BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡&'OFFICIAL POLICE GARAGE R^T^iNCREASES FOR 1996 TOW RATES Standard vehicles Heavy Duty Tow Heavy Duly Special Equipment) Heavy Duty Hazardous Cargo) STORAGE RATES Standard Vehicles Trucks Over 1 Ton trucks/boats/house trailers under 20fee() Tnicksffloatsnraiters over 20 feet) Motorcydes Major Component Parts Bulk Items Additional Personnel Removal of Stolen Vehide Component Pans CURRENT RATE $71.25 $139.50 $208.75 $313.00 CURRENTRATE $13.20 $15.00 $19.75 $4.25 $3.25 $0.10persq.ft;' $30.75 $40.00 per hour PROPOSED RA 7g $77.00 $150.50 $225.00 $337.50 PROPOSED RATE $14.50 $16.00 k $21.50 $4.50 $3.50 same S33.00 $43.00 per hour Removal of Bulk Items S71.25 per hour S7 7.00 per hour BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 2002 020 CC RESO;¢f4¤‡''SCHEDULE OF FCCS A» BARGES PAGE 24 INDEX Topic Page General Fees Community Center/Recreation Fees Engineering Fees Planning Fees Building Fees Police Fee^ 1 3 4-6 7-13 14-15 16-20 + attachment 20- 22-yt BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04 'PAGE 10 SCHEDULE OF FEES ANu CHARGES Sewer Connection Permit Fee Residential Commercia1 & Industrial Rectangular lot depth. 100 ft or less Rectangular of depth, more than 100 ft Irregular tot, frontage 60 ft or less Irregular lot. frontage greater than 60 ft Each existing lateral utilized by property owners) 50.00/per dwelling unil 20.00 dwelling unit if more than 10 units 100.00 per unrt 50.00 per unit if more than 10 unrts 8-00 ft aooft+ 0.01 s.f. over 100 ft of depth 8.00 ft or 0.08 s-i for first 6000 s.f.. whichever is greater, + 001 sX for all areas in excess of6000s.(. &00ft+ 0.01 && for aD areas in excess of 6000 s.f. 175.00 Public Works Permit Note; Pennit fees are computed at 5% of the total valuation of the work to be done under the permit The un'rt costs fisted shafl be used in calculating the total work valuation as appropriate, tn no event shafl the minimum penn» fee be less than $100.00. The cost of removals shall be calculated at 60% of the construction cost Curb Only 10.00 Lf. Ron Curb 12.00 Lf. Cross Gutter 16.001-f. Curb and Gutter 16.00 U. Parkway Landscaping 2.00 s.f. Sktewalk 4- P.C.C.) 3-50 s.f. Drive Approach 6' P.C.C.) 4.50 s.f. Crushed Aggregate Base 1-25 s.f. Asphalt Pavement: 4-thick 1.50 s.f. 4" thick 2.50 s.f. Wheelchair Ramp 4" P.C.C.) 450.00 ea BIB] 37641-U01 2002-U02 020-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO8678-U03 DO9050-U03 C6-U03 RESO-U03 1/20/2003-U04 ROBIN-U04