HomeMy WebLinkAbout2006 070 CC RESO2006 070 CC RESO ×P ˜ö RESOLUTION NO. 2006-070
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF BALDWIN PARK SETTING FEES FOR ISSUANCE,
PROCESSING AND FILING OF VARIOUS CITY
SERVICES AND PERMITS IN THE CITY RELATING TO
BUILDING AND PLAN CHECK FEES.
WHEREAS, Resolution No. 2002-020 and Resolution No. 2004-049 generally
set forth the fees for the issuing, processing and filling of various City services and
permits; and
WHEREAS, the City Council desires to supplement the fee schedules relating
to Building and Plan Check Fees set forth therein to assure that those persons
benefiting from such services pay all costs of such service;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BALDWIN PARK
DOES HEREBY RESOLVE AS FOLLOWS:
Section 1. Pursuant to Section 150.003 of the Baldwin Park Municipal Code,
the cost of issuing, processing, filling and obtaining the use of City services set forth in
Exhibit A" attached hereto and incorporated herein by this reference, shall be as set
forth in said Exhibit A".
Section 2. That all fees set forth in Resolution No. 2002-020 and Resolution
No. 2004-049 that are not in conflict with those established by this Resolution shall
remain in full force and effect.
Section 3. It is the intent of the City Council that the fee established by this
Resolution shall not be duplicative of fees or costs otherwise imposed upon
development.
Section 4. These fees shall become effective 60 days after the effective date
of this Resolution.
Section 5. The City Clerk shall certify as to the adoption of this Resolution
and shall cause the same to be processed in the manner required by law.
PASSED AND ADOPTED this 6th day of December 200
L NO, MAYOR
2006 070 CC RESO ×P ˜ö City of Baldwin Park
EXHIBIT A"
SCHEDULE OF FEES AND CHARGES
RESOLUTION 2006-070
Building Permit Fees
No Items Justification Fees
Permit issuance fee covers the cost of $37.50
1 Permit Issuance clerical staff for issuing and processing a Permit issuance fee for
permit. Currently there is no issuance fee for each permit issued.
building permit in the fee schedule and the
issuance fee for Electrical, Mechanical and
Plumbing is only $35.00.
Approximately 4000 permits are issued
annually.
Based on 2 staff at $75,000 including
benefits and overhead) per year, the cost of
permit issuance fee is $37.50 for each
permit, including Building, Electrical,
Mechanical and Plumbing.
Based on 25% of 1-staff at $75,000 per year 3.75% of permit fees
2 Record Keeping to maintain 20,000 records and plans.
Fee is based on percentage of approximately
$500K in permit fees annually collected to
arrive at 3.75% of permit fee
For some projects the existing permit fee $45.00
3 Min Permit Fee based on valuation) is too low and does not Minimum permit fee for
cover the cost of providing at least one each permit if
inspection. The minimum permit fee shall be calculated permit fee is
$45.00, based on the cost to provide at least less than $45.00
one inspection at the rate of 45 minutes.
Annual Pay $75,000
Transportation= $10,000 estimated
15% O/H $12,750
$97,750 / 1600 hr $61.94
$61.94 x.75 $45.82 rounded to establish
min permit fee
The plan check fee is presently a percentage 1-hour based on latest
4 Min Plan Check Fee of the permit fees, again occasionally hourly rate.
resulting in a fee which does not cover the
cost of staff for the actual work. Therefore,
the minimum plan check fee shall be at least
1-hour of staff time or the calculated amount
which ever is more.
5 Alternate Material To allow developers to request approval of 1 % hours based on the
Processing materials that are not listed as approved latest hourly rate.
material.
The processing would require research and
coordination with other agencies such as Fire
Department, Health Department, and
material testing labs. It is estimated that in
excess of 1 % hour staff time would be
required to process and approve Alternate
Material.
2006 070 CC RESO ×P ˜ö Resolution No. 2006-070
Exhibit A"
Page 2
6 Extension of permit To cover the cost of re-issuing the permit Permit issuance fee of
one time) $37.50
If the original permit
has not been expired
7 Permit extension if the The project shall be evaluated for fitness in Based on time required
original permit has order to extend an expired permit. The fee to complete the project
been expired charged to extend a permit shall be adequate based on the latest
to cover the staff time needed to complete hourly rate.
the project as determined by the building
official.
8 Plan check extension if If the plan check has not been expired and a No Fee
plan check has not request for extension is made by the
been expired applicant.
one time)
9 Plan check extension if The application shall be evaluated for fitness Based on time required
original plan check has in order to extend an expired plan check to complete the plan
been expired application. The fee charged to extend a check application based
permit shall be adequate to cover the staff on latest hourly rate, or
time needed to complete the project as / of the original plan
determined by the building official but not check fee which ever is
less than % of the original plan check fee. more.
10 Expedited Plan Check Consultant fee, n order to provide the Double Plan Check Fee
developers with timely expedited plan check to pay for consulting
within 5 working days. This service is firm to provide timely
provided to the developers per their request plan check of 5 working
to complete the plan check application faster days.
than the regular turnaround time.
11 After-Hours Inspection This service is provided to allow developer to At 1.5 Hourly Rate 4-HR
request after-hours inspections. MIN
2006 070 CC RESO ×P ˜ö Resolution No. 2006-070
Page 2
ATTEST:
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES SS.
CITY OF BALDWIN PARK
I, ROSEMARY M. GUTIERREZ, Chief Deputy City Clerk, of the City of Baldwin
Park, do hereby certify that the foregoing Resolution No. 2006-070 was duly and
regularly approved and adopted by the City Council of the City of Baldwin Park at a
regular meeting thereof, held on the 6th day of December, 2006 by the following vote:
AYES: COUNCILMEMBERS: ANTHONY J. BEJARANO, MARLEN
GARCIA, RICARDO PACHECO, DAVID J.
OLIVAS AND MAYOR MANUEL LOZANO
NOES: COUNCILMEMBERS: NONE
ABSENT: COUNCILMEMBERS: NONE
ABSTAIN: COUNC MBERS: NONE
ROSE RREZ
CHIEF DEPUTY CITTY CLERK
BIB]
39064-U01
2006-U02
070-U02
CC-U02
RESO-U02
LI3-U03
FO8417-U03
FO84139-U03
DO97142-U03
C6-U03
RESO-U03
12/12/2006-U04
ROBIN-U04