Loading...
HomeMy WebLinkAbout2006 070 CC RESO2006 070 CC RESO ×P ˜ö RESOLUTION NO. 2006-070 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK SETTING FEES FOR ISSUANCE, PROCESSING AND FILING OF VARIOUS CITY SERVICES AND PERMITS IN THE CITY RELATING TO BUILDING AND PLAN CHECK FEES. WHEREAS, Resolution No. 2002-020 and Resolution No. 2004-049 generally set forth the fees for the issuing, processing and filling of various City services and permits; and WHEREAS, the City Council desires to supplement the fee schedules relating to Building and Plan Check Fees set forth therein to assure that those persons benefiting from such services pay all costs of such service; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES HEREBY RESOLVE AS FOLLOWS: Section 1. Pursuant to Section 150.003 of the Baldwin Park Municipal Code, the cost of issuing, processing, filling and obtaining the use of City services set forth in Exhibit A" attached hereto and incorporated herein by this reference, shall be as set forth in said Exhibit A". Section 2. That all fees set forth in Resolution No. 2002-020 and Resolution No. 2004-049 that are not in conflict with those established by this Resolution shall remain in full force and effect. Section 3. It is the intent of the City Council that the fee established by this Resolution shall not be duplicative of fees or costs otherwise imposed upon development. Section 4. These fees shall become effective 60 days after the effective date of this Resolution. Section 5. The City Clerk shall certify as to the adoption of this Resolution and shall cause the same to be processed in the manner required by law. PASSED AND ADOPTED this 6th day of December 200 L NO, MAYOR 2006 070 CC RESO ×P ˜ö City of Baldwin Park EXHIBIT A" SCHEDULE OF FEES AND CHARGES RESOLUTION 2006-070 Building Permit Fees No Items Justification Fees Permit issuance fee covers the cost of $37.50 1 Permit Issuance clerical staff for issuing and processing a Permit issuance fee for permit. Currently there is no issuance fee for each permit issued. building permit in the fee schedule and the issuance fee for Electrical, Mechanical and Plumbing is only $35.00. Approximately 4000 permits are issued annually. Based on 2 staff at $75,000 including benefits and overhead) per year, the cost of permit issuance fee is $37.50 for each permit, including Building, Electrical, Mechanical and Plumbing. Based on 25% of 1-staff at $75,000 per year 3.75% of permit fees 2 Record Keeping to maintain 20,000 records and plans. Fee is based on percentage of approximately $500K in permit fees annually collected to arrive at 3.75% of permit fee For some projects the existing permit fee $45.00 3 Min Permit Fee based on valuation) is too low and does not Minimum permit fee for cover the cost of providing at least one each permit if inspection. The minimum permit fee shall be calculated permit fee is $45.00, based on the cost to provide at least less than $45.00 one inspection at the rate of 45 minutes. Annual Pay $75,000 Transportation= $10,000 estimated 15% O/H $12,750 $97,750 / 1600 hr $61.94 $61.94 x.75 $45.82 rounded to establish min permit fee The plan check fee is presently a percentage 1-hour based on latest 4 Min Plan Check Fee of the permit fees, again occasionally hourly rate. resulting in a fee which does not cover the cost of staff for the actual work. Therefore, the minimum plan check fee shall be at least 1-hour of staff time or the calculated amount which ever is more. 5 Alternate Material To allow developers to request approval of 1 % hours based on the Processing materials that are not listed as approved latest hourly rate. material. The processing would require research and coordination with other agencies such as Fire Department, Health Department, and material testing labs. It is estimated that in excess of 1 % hour staff time would be required to process and approve Alternate Material. 2006 070 CC RESO ×P ˜ö Resolution No. 2006-070 Exhibit A" Page 2 6 Extension of permit To cover the cost of re-issuing the permit Permit issuance fee of one time) $37.50 If the original permit has not been expired 7 Permit extension if the The project shall be evaluated for fitness in Based on time required original permit has order to extend an expired permit. The fee to complete the project been expired charged to extend a permit shall be adequate based on the latest to cover the staff time needed to complete hourly rate. the project as determined by the building official. 8 Plan check extension if If the plan check has not been expired and a No Fee plan check has not request for extension is made by the been expired applicant. one time) 9 Plan check extension if The application shall be evaluated for fitness Based on time required original plan check has in order to extend an expired plan check to complete the plan been expired application. The fee charged to extend a check application based permit shall be adequate to cover the staff on latest hourly rate, or time needed to complete the project as / of the original plan determined by the building official but not check fee which ever is less than % of the original plan check fee. more. 10 Expedited Plan Check Consultant fee, n order to provide the Double Plan Check Fee developers with timely expedited plan check to pay for consulting within 5 working days. This service is firm to provide timely provided to the developers per their request plan check of 5 working to complete the plan check application faster days. than the regular turnaround time. 11 After-Hours Inspection This service is provided to allow developer to At 1.5 Hourly Rate 4-HR request after-hours inspections. MIN 2006 070 CC RESO ×P ˜ö Resolution No. 2006-070 Page 2 ATTEST: STATE OF CALIFORNIA COUNTY OF LOS ANGELES SS. CITY OF BALDWIN PARK I, ROSEMARY M. GUTIERREZ, Chief Deputy City Clerk, of the City of Baldwin Park, do hereby certify that the foregoing Resolution No. 2006-070 was duly and regularly approved and adopted by the City Council of the City of Baldwin Park at a regular meeting thereof, held on the 6th day of December, 2006 by the following vote: AYES: COUNCILMEMBERS: ANTHONY J. BEJARANO, MARLEN GARCIA, RICARDO PACHECO, DAVID J. OLIVAS AND MAYOR MANUEL LOZANO NOES: COUNCILMEMBERS: NONE ABSENT: COUNCILMEMBERS: NONE ABSTAIN: COUNC MBERS: NONE ROSE RREZ CHIEF DEPUTY CITTY CLERK BIB] 39064-U01 2006-U02 070-U02 CC-U02 RESO-U02 LI3-U03 FO8417-U03 FO84139-U03 DO97142-U03 C6-U03 RESO-U03 12/12/2006-U04 ROBIN-U04