Loading...
HomeMy WebLinkAbout2011 019 CC RESO RESOLUTION NO. 2011-019 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK, CALIFORNIA, APPROVING THE ENGINEER'S REPORT FOR THE CITYWIDE PARK MAINTENANCE ASSESSMENT DISTRICT FOR FY 2011-2012, DECLARING THE INTENT TO LEVY AND COLLECT ASSESSMENTS, AND SETTING A TIME AND PLACE FOR A PUBLIC HEARING WHEREAS, pursuant to the Provisions of Division 15, Part 2 of the Streets and Highways Code of the State of California, being known as the "Landscaping and Lighting Act of 1972" and Article XIIID of the State Constitution an Engineer's Report has been prepared consisting of plans and specifications, an estimate of the cost, a diagram of the Maintenance District and an assessment relating to what is now designated as: CITY OF BALDWIN PARK CITYWIDE PARK MAINTENANCE ASSESSMENT DISTRICT (Hereinafter referred to as "District"); and WHEREAS, there now has been presented to this City Council, the Report as required by Division 15 of the Streets and Highways Code and Article XIIID of the State Constitution; and WHEREAS, this City Council has now carefully examined and reviewed the Report as presented and is satisfied with each and all of the items and documents as set forth therein and is satisfied that the assessments, on a preliminary basis, have been spread in accordance with the benefits received from the maintenance to be performed as set forth in said Report. NOW THEREFORE, IT IS HEREBY RESOLVED AS FOLLOWS: SECTION 1. That the above recitals are all true and correct. SECTION 2. That the Report as presented, consisting of the following: a. Plans and Specifications b. Estimate of the Cost c. Diagram of the Maintenance District d. Assessment of the Estimated Cost is hereby approved and is ordered to be filed in the office of the City Engineer as a permanent record and to remain open for public inspection. Resolution No. 2011-019 Page 2 SECTION 3. That it is the intention of the City Council, consistent with the public interest and convenience, to levy and collect annual assessments for FY 2011-2012 for the construction and continued maintenance of certain public facilities within the Citywide Park Maintenance Assessment District, all to serve and benefit said District as said area is shown and delineated on a map shown in the Engineer's Report on file in the office of the City Engineer, open for public inspection, and herein so referenced and made a part hereof. SECTION 4. That a public hearing shall be held before this City Council, in the Council Chambers, 14403 E. Pacific Avenue, Baldwin Park, on Wednesday, June 15, 2011, at the hour of 7:00 p.m. pursuant to the "Landscaping and Lighting Act of 1972" and Article XIIID of the State Constitution, for the purposes of hearing protests, comments, or objections in reference to the annual levy of assessments and the extent of the works and maintenance of improvements, and this Council's determination whether the public interest, convenience, and necessity require the improvements. SECTION 5. That the City Clerk is hereby authorized and directed to publish a copy of this Resolution in the San Gabriel Valley Tribune, a newspaper of general circulation in said City; said publication shall not be less than ten (10) days before the date of said Public Hearing. SECTION 6. For any and all information relating to the procedures, protest procedure, documentation and/or information of a procedural or technical nature, the public's attention is directed to the office listed below as designated: Edwin "William" Galvez, Director of Public Works / City Engineer City of Baldwin Park (626) 813-5255 SECTION 7. That the City Clerk shall certify to the passage and adoption of the Resolution and the Minutes of the meeting shall so reflect the presentation of the Engineer's Report. PASSED, APPROVED, AND ADOPTED this 18th day of M 011.I i A 11 OZA '1O MAYOR Resolution No. 2011-019 Page 3 ATTEST: STATE OF CALIFORNIA COUNTY OF LOS ANGELES — SS: CITY OF BALDWIN PARK I, LAURA M. NIETO, Deputy City Clerk of the City of Baldwin Park do hereby certify that the foregoing Resolution No. 2011-019 was duly adopted by the City Council of the City of Baldwin Park at a regular meeting thereof held on May 18, 2011 and that the same was adopted by the following vote to wit: AYES: COUNCIL MEMBERS: Monica Garcia, Ricardo Pacheco, Susan Rubio, Mayor Pro Tern Marlen Garcia and Mayor Manuel Lozano NOES: COUNCIL MEMBERS: NONE ABSENT: COUNCIL MEMBERS: NONE ABSTAIN: COUNCIL MEMBERS: NONE 1/ a D/!. The , AURA M. NIETO, CMC DEPUTY CITY CLERK