HomeMy WebLinkAbout2017 203 CC RESO RESOLUTION NO. 2017-203
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BALDWIN PARK AMENDING THE CAPITAL IMPROVEMENT
PROGRAM (CIP) BUDGET TO INCORPORATE A PROJECT
IMPROVEMENTS LIST IN CONFORMANCE WITH SENATE
BILL 1 (SB1) — THE ROAD REPAIR AND ACCOUNTABILITY
ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter
5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017
in order to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of our City are aware of the projects proposed for funding in our community and which
projects have been completed each fiscal year; and
WHEREAS, the City must include a list of all projects proposed to receive funding from the
Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the City budget, which
must include a description and the location of each proposed project, a proposed schedule for the
project's completion, and the estimated useful life of the improvement; and
WHEREAS, the City, will receive and estimated $425,961 in RMRA funding in Fiscal Year
2017-18 from SB 1; and
WHEREAS, the City has undergone a robust public process to ensure public input into our
community's transportation priorities (the project list); and
WHEREAS,the City used a Pavement Management System to develop the SB 1 project list
to ensure revenues are being used on the most high-priority and cost-effective projects that also meet
the communities priorities for transportation investment; and
WHEREAS,the 2016 California Statewide Local Streets and Roads Needs Assessment
found t at the City's streets and roads are in an good condition and this revenue will help us increase
the ove 11 quality of our road system and over the next decade will bring our streets and roads into a
"excell t" condition; and
HEREAS, cities and counties own and operate more than 81 percent of streets and roads in
Califo ia, and from the moment we open our front door to drive to work, bike to school, or walk to
the bus station,people are dependent upon a safe, reliable local transportation network; and
WHEREAS,modernizing the local street and road system provides well-paying construction
jobs and boosts local economies; and
WHEREAS, police, fire, and emergency medical services all need safe reliable roads to react
Resolution No.2017-203
SB 1 —Road Repair And Accountability Act of 2017
Page 2
quickly to emergency calls and a few minutes of delay can be a matter of life and death; and
WHEREAS, maintaining and preserving the local street and road system in good condition
will reduce drive times and traffic congestion, improve bicycle safety, and make the pedestrian
experience safer and more appealing, which leads to reduce vehicle emissions helping the State
achieve its air quality and greenhouse gas emissions reductions goals; and
WHEREAS,restoring roads before they fail also reduces construction time which results in
less air pollution from heavy equipment and less water pollution from site run-off; and
NOW THEREFORE, IT IS HEREBY RESOLVED AS FOLLOWS:
The City Council of the City of Baldwin Park, California:
1. The foregoing recitals are true and correct.
•2. The CIP budget for FY 2017-18 is amended to incorporate the following list of
projects planned to be funded with Road Maintenance and Rehabilitation Account
revenues:
1. Brooks Drive and Spring Street Reconstruction. This project will consist of
reconstruction of portions of the street structural section including removal of
22-inches of the existing roadway and constructing new roadway section
including sub-surface preparation, subgrade and constructing aggregate base
• and asphalt concrete (AC)pavement sections. The project also includes
upgrade/replacement of accessible ramps and major curb and gutter repairs.
2. Street Rehabilitation Project. Project consists of 2-inch cold-mill of the
roadway and placing new asphalt layer. The project also includes
upgrade/replacement of accessible ramps, minor curb and gutter repairs,traffic
signal loop replacement, and restriping.
•3. The Capital Budget for fiscal year 2017-18 is amended as follows: •
a. Appropriate $425,961 in RMRA funding for Brooks Drive and Spring Street
Reconstruction and the Street Rehabilitation Projects.
PASSED,APPROVED, AND ADOPTED this 4th ay of October 2017.
•
MAULLO
MAYOR
Resolution No.2017-203
SB 1 —Road Repair And Accountability Act of 2017
Page 3
ATTEST:
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES SS:
CITY OF BALDWIN PARK
I, Alejandra Avila, City Clerk of the City of Baldwin Park do hereby certify that the foregoing
Resolution No. 2017-203 was duly adopted by the City Council of the City of Baldwin Park at a
regular meeting thereof held on October 4, 2017 and that the same was adopted by the following vote
to wit:
AYES: COUNCIL MEMBERS: Baca, Garcia, Lozano, Pacheco
NOES: COUNCIL MEMBERS: None
ABSENT: C a CIL EMBERS: Rubio
ABS A : / CO C MEMBERS: None
ALEJAND' AVILA,
CITY CLERK
SB 1 —Road Repair and Accountability Act of 2017
Project Improvements List
Brooks Drive and Spring Street Reconstruction
9 River rade Rd End of Street Reconstrction
777 A
ging St Littlejohn St End of Street Reconstrction
Residential Street Rehabilitation Project
„. „
Herr St '; Judith St End of Street 2"Coldmill and AC Overlay
Amur Rd Frazier St End of Street 2"Coldmill and AC Overlay
Phalan Ave Los Angeles St Olive St 2"Coldmill and AC Overlay
N+ 4,m Ledford St Dalewood St 2"Coldmill and AC Overlay
Ledford St Frazier St Nolina St 2"Coldmill and AC Overlay