Loading...
HomeMy WebLinkAbout2018 260 CC RESO RESOLUTION NO. 2018-260 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK TO ADOPT THE FISCAL YEAR 2018-19 PROJECT LIST TO BE FUNDED BY SENATE BILL 1 (SB1) — THE ROAD REPAIR AND ACCOUNTABILITY ACT WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 in order to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB l includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must include a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the City budget, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive and estimated $1,364,067 in RMRA funding in Fiscal Year 2018-19 from SB 1; and WHEREAS, the City has undergone a robust public process to ensure public input into our community's transportation priorities (the project list); and WHEREAS,the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities' priorities for transportation investment; and WHEREAS,the 2016 California Statewide Local Streets and Roads Needs Assessment found that the City's streets and roads are in an good condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a "excellent"condition; and WHEREAS, cities and counties own and operate more than 81 percent of streets and roads in California, and from the moment we open our front door to drive to work, bike to school, or walk to the bus station,people are dependent upon a safe, reliable local transportation network; and WHEREAS,modernizing the local street and road system provides well-paying construction jobs and boosts local economies; and WHEREAS, police, fire, and emergency medical services all need safe reliable roads to react quickly to emergency calls and a few minutes of delay can be a matter of life and death; and Resolution No.2018-260 SB 1 —Road Repair and Accountability Act FY 2018-19 Project List Page 2 WHEREAS, maintaining and preserving the local street and road system in good condition will reduce drive times and traffic congestion, improve bicycle safety, and make the pedestrian experience safer and more appealing, which leads to reduce vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals; and WHEREAS,restoring roads before they fail also reduces construction time which results in less air pollution from heavy equipment and less water pollution from site run-off; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide. NOW THEREFORE,IT IS HEREBY RESOLVED AS FOLLOWS: The City Council of the City of Baldwin Park, California: SECTION 1. The foregoing recitals are true and correct. SECTION 2. The City of Baldwin Park is adopting the following list of projects planned to be funded with Road Maintenance and Rehabilitation Account revenues: A. Maine Avenue Paving and Street Improvements. This project will consist of reconstruction of portions of the street structural section including sub-surface preparation, subgrade and constructing aggregate base and asphalt concrete (AC) pavement sections. The project also includes upgrade/replacement of accessible ramps, relocation of water main and major curb and gutter repairs. B. Entry Monument Signs. Design and construction of eight (8) entry monument signs to be placed at major entry points to the city. The project includes street improvements necessary to accommodate the installation including sub-surface preparation, subgrade and AC overlay, and concrete improvements. C. Residential Street Rehabilitation. Work includes 2-inch cold-mill of the roadway and placing new asphalt layer. The project also includes upgrade/replacement of accessible ramps, minor curb and gutter repairs,traffic signal loop replacement, and restriping. SECTION 3. This Resolution shall go into effect immediately upon adoption. Resolution No.2018-260 SB 1 —Road Repair and Accountability Act FY 2018-19 Project List Page 3 PASSED,APPROVED,AND ADOPTED this 2°d day of May 2018. MAN E ' 0" 7NO MAYO' ATTEST: STATE OF CALIFORNIA COUNTY OF LOS ANGELES SS: CITY OF BALDWIN PARK I, Alejandra Avila, City Clerk of the City of Baldwin Park do hereby certify that the foregoing Resolution No. 2018-260 was duly adopted by the City Council of the City of Baldwin Park at a regular meeting thereof held on May 2, 2018 and that the same was adopted by the following vote to wit: AYES: COUNCIL MEMBERS:Baca, Garcia, Lozano, Pacheco, Rubio NOES: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: ABSTAIN:: COUNC MEMBERS: ALEJAND' ' AV ILA, CITY CLERK