HomeMy WebLinkAbout2018 260 CC RESO RESOLUTION NO. 2018-260
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BALDWIN PARK TO ADOPT THE FISCAL YEAR 2018-19 PROJECT
LIST TO BE FUNDED BY SENATE BILL 1 (SB1) — THE ROAD
REPAIR AND ACCOUNTABILITY ACT
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter
5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017
in order to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB l includes accountability and transparency provisions that will ensure the
residents of our City are aware of the projects proposed for funding in our community and which
projects have been completed each fiscal year; and
WHEREAS, the City must include a list of all projects proposed to receive funding from the
Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the City budget, which
must include a description and the location of each proposed project, a proposed schedule for the
project's completion, and the estimated useful life of the improvement; and
WHEREAS, the City, will receive and estimated $1,364,067 in RMRA funding in Fiscal
Year 2018-19 from SB 1; and
WHEREAS, the City has undergone a robust public process to ensure public input into our
community's transportation priorities (the project list); and
WHEREAS,the City used a Pavement Management System to develop the SB 1 project list
to ensure revenues are being used on the most high-priority and cost-effective projects that also meet
the communities' priorities for transportation investment; and
WHEREAS,the 2016 California Statewide Local Streets and Roads Needs Assessment
found that the City's streets and roads are in an good condition and this revenue will help us increase
the overall quality of our road system and over the next decade will bring our streets and roads into a
"excellent"condition; and
WHEREAS, cities and counties own and operate more than 81 percent of streets and roads in
California, and from the moment we open our front door to drive to work, bike to school, or walk to
the bus station,people are dependent upon a safe, reliable local transportation network; and
WHEREAS,modernizing the local street and road system provides well-paying construction
jobs and boosts local economies; and
WHEREAS, police, fire, and emergency medical services all need safe reliable roads to react
quickly to emergency calls and a few minutes of delay can be a matter of life and death; and
Resolution No.2018-260
SB 1 —Road Repair and Accountability Act
FY 2018-19 Project List
Page 2
WHEREAS, maintaining and preserving the local street and road system in good condition
will reduce drive times and traffic congestion, improve bicycle safety, and make the pedestrian
experience safer and more appealing, which leads to reduce vehicle emissions helping the State
achieve its air quality and greenhouse gas emissions reductions goals; and
WHEREAS,restoring roads before they fail also reduces construction time which results in
less air pollution from heavy equipment and less water pollution from site run-off; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co-benefits statewide.
NOW THEREFORE,IT IS HEREBY RESOLVED AS FOLLOWS:
The City Council of the City of Baldwin Park, California:
SECTION 1. The foregoing recitals are true and correct.
SECTION 2. The City of Baldwin Park is adopting the following list of projects planned to
be funded with Road Maintenance and Rehabilitation Account revenues:
A. Maine Avenue Paving and Street Improvements. This project will consist of
reconstruction of portions of the street structural section including sub-surface
preparation, subgrade and constructing aggregate base and asphalt concrete (AC)
pavement sections. The project also includes upgrade/replacement of accessible
ramps, relocation of water main and major curb and gutter repairs.
B. Entry Monument Signs. Design and construction of eight (8) entry monument
signs to be placed at major entry points to the city. The project includes street
improvements necessary to accommodate the installation including sub-surface
preparation, subgrade and AC overlay, and concrete improvements.
C. Residential Street Rehabilitation. Work includes 2-inch cold-mill of the roadway
and placing new asphalt layer. The project also includes upgrade/replacement of
accessible ramps, minor curb and gutter repairs,traffic signal loop replacement,
and restriping.
SECTION 3. This Resolution shall go into effect immediately upon adoption.
Resolution No.2018-260
SB 1 —Road Repair and Accountability Act
FY 2018-19 Project List
Page 3
PASSED,APPROVED,AND ADOPTED this 2°d day of May 2018.
MAN E ' 0" 7NO
MAYO'
ATTEST:
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES SS:
CITY OF BALDWIN PARK
I, Alejandra Avila, City Clerk of the City of Baldwin Park do hereby certify that the foregoing
Resolution No. 2018-260 was duly adopted by the City Council of the City of Baldwin Park at a
regular meeting thereof held on May 2, 2018 and that the same was adopted by the following vote to
wit:
AYES: COUNCIL MEMBERS:Baca, Garcia, Lozano, Pacheco, Rubio
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN:: COUNC MEMBERS:
ALEJAND' ' AV ILA,
CITY CLERK