Loading...
HomeMy WebLinkAbout2020 012 CC RESO RESOLUTION NO. 2020-012 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK TO ADOPT THE FISCAL YEAR 2020-21 PROJECT LIST TO BE FUNDED BY SENATE BILL 1 (SB1) — THE ROAD REPAIR AND ACCOUNTABILITY ACT WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 in order to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must include a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the City budget, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive and estimated $1,459,688 in RMRA funding in Fiscal Year 2020-21 from SB 1; and WHEREAS, the City has undergone a robust public process to ensure public input into our community's transportation priorities (the project list); and WHEREAS, the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities' priorities for transportation investment; and WHEREAS, the 2016 California Statewide Local Streets and Roads Needs Assessment found that the City's streets and roads are in a good condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into an "excellent" condition; and WHEREAS, cities and counties own and operate more than 81 percent of streets and roads in California, and from the moment we open our front door to drive to work, bike to school, or walk to the bus station, people are dependent upon a safe, reliable local transportation network; and WHEREAS, modernizing the local street and road system provides well-paying construction jobs and boosts local economies; and WHEREAS, police, fire, and emergency medical services all need safe reliable roads to react quickly to emergency calls and a few minutes of delay can be a matter of life and death; and Resolution No.2020-012 SB1 —Road Repair and Accountability Act FY 2020-21 Project List Page 2 WHEREAS, maintaining and preserving the local street and road system in good condition will reduce drive times and traffic congestion, improve bicycle safety, and make the pedestrian experience safer and more appealing, which leads to reduce vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals; and WHEREAS, restoring roads before they fail also reduces construction time which results in less air pollution from heavy equipment and less water pollution from site run-off; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide. NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BALDWIN PARK HEREBY RESOLVES AS FOLLOWS: The City Council of the City of Baldwin Park, California: Section 1. The foregoing recitals are true and correct. Section 2. The City of Baldwin Park is adopting the following list of projects planned to be funded with Road Maintenance and Rehabilitation Account revenues: 1. Foster Avenue Drainage Improvements. Work includes preparation of plans, specifications and estimates for the construction of drainage improvements along Foster Avenue at the Metrolink rail crossing, including installation of new storm drain mainline, catch basins and connections. ■The estimated useful life is 50 years and construction will start in Fall 2022. 2. Maine Avenue and Olive Avenue Intersection Improvements. This project will consist of complete street improvements at the intersection of Maine Avenue and Olive Street. The improvements include construction of bulb-outs, catch basin relocations, reconstruction of portions of the street structural section including sub- surface preparation, subgrade and constructing aggregate base and asphalt concrete (AC) pavement sections, construction of sidewalk, construction of accessible pedestrian ramps and major curb/gutter repairs. The project also includes installation of new traffic signal. • The estimated useful life is 25 years and construction will start in Fall 2020. 3. Downtown Beautification Improvements. First Mile/Last Mile safety improvements and connections to the City of Baldwin Park Transit Center. Improvements include installation of high-visible crosswalks, accessible curb ramps, bike lanes, traffic signal improvements, wayfinding signage and site furniture. • The estimated useful life is 20 years and construction will start in Spring 2021. Resolution No.2020-012 SB1 —Road Repair and Accountability Act FY 2020-21 Project List Page 3 PASSED, APPROVED, AND ADOPTED this 15th day of April 2020. MA EL'LOZANO MAYOR ATTEST: STATE OF CALIFORNIA COUNTY OF LOS ANGELES SS: CITY OF BALDWIN PARK I, JEAN M. AYALA, City Clerk of the City of Baldwin Park do hereby certify that the foregoing Resolution No. 2020-012 was duly adopted by the City Council of the City of Baldwin Park at a regular meeting thereof held on April 15, 2020 and that the same was adopted by the following vote to wit: AYES: COUNCIL MEMBERS: Avila, Garcia, Hernandez, Lozano, Pacheco NOES: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: J N . AYALA CITY CLERK Resolution No. 2020-012 SB1 —Road Repair and Accountability Act FY 2020-21 Project List Page 4 SB1 — Road Repair and Accountability Act Fiscal Year 2020-21 Project List No. Project Description Location Construction Useful Schedule Life 1 Foster Avenue Drainage Improvements. Work includes preparation of plans, specifications and Foster Avenue estimates for the construction of drainage Between Metrolink improvements along Foster Avenue at the Rail Crossing and August 2022 50 yrs. Metrolink rail crossing, including installation of Baldwin Park Blvd. new storm drain mainline, catch basins and connections. 2 Maine Avenue and Olive Street Intersection improvements. This project will consist of complete street improvements at the intersection of Maine Avenue and Olive Street. The improvements include construction of bulb- outs, catch basin relocations, reconstruction of portions of the street structural section including sub-surface preparation, subgrade and Maine Avenue at July 2020 25 yrs. constructing aggregate base and asphalt Olive Street concrete(AC) pavement sections, construction of sidewalk, construction of accessible pedestrian ramps and major curb/gutter repairs. The project also includes installation of new traffic signal. 3 Downtown Beautification Improvements. First Mile/Last Mile safety improvements and City of Baldwin connections to the City of Baldwin Park Transit Park Downtown Center. Improvements include installation of Specific Area— high-visible crosswalks, accessible curb ramps, Ramona Avenue, January 2021 20 yrs. bike lanes, traffic signal improvements, Bogart Avenue, wayfinding signage and site furniture. Maine Avenue and Downing Avenue