HomeMy WebLinkAbout2020 012 CC RESO RESOLUTION NO. 2020-012
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN
PARK TO ADOPT THE FISCAL YEAR 2020-21 PROJECT LIST TO BE
FUNDED BY SENATE BILL 1 (SB1) — THE ROAD REPAIR AND
ACCOUNTABILITY ACT
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the
Governor in April 2017 in order to address the significant multi-modal transportation funding
shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will
ensure the residents of our City are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
WHEREAS, the City must include a list of all projects proposed to receive funding
from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the
City budget, which must include a description and the location of each proposed project, a
proposed schedule for the project's completion, and the estimated useful life of the
improvement; and
WHEREAS, the City, will receive and estimated $1,459,688 in RMRA funding in
Fiscal Year 2020-21 from SB 1; and
WHEREAS, the City has undergone a robust public process to ensure public input
into our community's transportation priorities (the project list); and
WHEREAS, the City used a Pavement Management System to develop the SB 1
project list to ensure revenues are being used on the most high-priority and cost-effective
projects that also meet the communities' priorities for transportation investment; and
WHEREAS, the 2016 California Statewide Local Streets and Roads Needs
Assessment found that the City's streets and roads are in a good condition and this revenue
will help us increase the overall quality of our road system and over the next decade will
bring our streets and roads into an "excellent" condition; and
WHEREAS, cities and counties own and operate more than 81 percent of streets and
roads in California, and from the moment we open our front door to drive to work, bike to
school, or walk to the bus station, people are dependent upon a safe, reliable local
transportation network; and
WHEREAS, modernizing the local street and road system provides well-paying
construction jobs and boosts local economies; and
WHEREAS, police, fire, and emergency medical services all need safe reliable roads
to react quickly to emergency calls and a few minutes of delay can be a matter of life and
death; and
Resolution No.2020-012
SB1 —Road Repair and Accountability Act
FY 2020-21 Project List
Page 2
WHEREAS, maintaining and preserving the local street and road system in good
condition will reduce drive times and traffic congestion, improve bicycle safety, and make
the pedestrian experience safer and more appealing, which leads to reduce vehicle
emissions helping the State achieve its air quality and greenhouse gas emissions
reductions goals; and
WHEREAS, restoring roads before they fail also reduces construction time which
results in less air pollution from heavy equipment and less water pollution from site run-off;
and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have
significant positive co-benefits statewide.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BALDWIN PARK
HEREBY RESOLVES AS FOLLOWS:
The City Council of the City of Baldwin Park, California:
Section 1. The foregoing recitals are true and correct.
Section 2. The City of Baldwin Park is adopting the following list of projects
planned to be funded with Road Maintenance and Rehabilitation Account revenues:
1. Foster Avenue Drainage Improvements. Work includes preparation of plans,
specifications and estimates for the construction of drainage improvements along
Foster Avenue at the Metrolink rail crossing, including installation of new storm
drain mainline, catch basins and connections.
■The estimated useful life is 50 years and construction will start in Fall 2022.
2. Maine Avenue and Olive Avenue Intersection Improvements. This project will
consist of complete street improvements at the intersection of Maine Avenue and
Olive Street. The improvements include construction of bulb-outs, catch basin
relocations, reconstruction of portions of the street structural section including sub-
surface preparation, subgrade and constructing aggregate base and asphalt
concrete (AC) pavement sections, construction of sidewalk, construction of
accessible pedestrian ramps and major curb/gutter repairs. The project also
includes installation of new traffic signal.
• The estimated useful life is 25 years and construction will start in Fall 2020.
3. Downtown Beautification Improvements. First Mile/Last Mile safety
improvements and connections to the City of Baldwin Park Transit Center.
Improvements include installation of high-visible crosswalks, accessible curb
ramps, bike lanes, traffic signal improvements, wayfinding signage and site
furniture.
• The estimated useful life is 20 years and construction will start in Spring 2021.
Resolution No.2020-012
SB1 —Road Repair and Accountability Act
FY 2020-21 Project List
Page 3
PASSED, APPROVED, AND ADOPTED this 15th day of April 2020.
MA EL'LOZANO
MAYOR
ATTEST:
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES SS:
CITY OF BALDWIN PARK
I, JEAN M. AYALA, City Clerk of the City of Baldwin Park do hereby certify that the foregoing
Resolution No. 2020-012 was duly adopted by the City Council of the City of Baldwin Park at
a regular meeting thereof held on April 15, 2020 and that the same was adopted by the
following vote to wit:
AYES: COUNCIL MEMBERS: Avila, Garcia, Hernandez, Lozano, Pacheco
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
J N . AYALA
CITY CLERK
Resolution No. 2020-012
SB1 —Road Repair and Accountability Act
FY 2020-21 Project List
Page 4
SB1 — Road Repair and Accountability Act
Fiscal Year 2020-21 Project List
No. Project Description Location Construction Useful
Schedule Life
1 Foster Avenue Drainage Improvements. Work
includes preparation of plans, specifications and Foster Avenue
estimates for the construction of drainage Between Metrolink
improvements along Foster Avenue at the Rail Crossing and August 2022 50 yrs.
Metrolink rail crossing, including installation of Baldwin Park Blvd.
new storm drain mainline, catch basins and
connections.
2 Maine Avenue and Olive Street Intersection
improvements. This project will consist of
complete street improvements at the
intersection of Maine Avenue and Olive Street.
The improvements include construction of bulb-
outs, catch basin relocations, reconstruction of
portions of the street structural section including
sub-surface preparation, subgrade and Maine Avenue at July 2020 25 yrs.
constructing aggregate base and asphalt Olive Street
concrete(AC) pavement sections, construction
of sidewalk, construction of accessible
pedestrian ramps and major curb/gutter repairs.
The project also includes installation of new
traffic signal.
3 Downtown Beautification Improvements.
First Mile/Last Mile safety improvements and City of Baldwin
connections to the City of Baldwin Park Transit Park Downtown
Center. Improvements include installation of Specific Area—
high-visible crosswalks, accessible curb ramps, Ramona Avenue, January 2021 20 yrs.
bike lanes, traffic signal improvements, Bogart Avenue,
wayfinding signage and site furniture. Maine Avenue and
Downing Avenue