HomeMy WebLinkAbout1966 07 01 CC MIN1966 07 01 CC MIN HÄ—@¸— 1 ÂÍ«CITY OF BALDWIN PARK
BID OPENING
Construction of P.C.C. curb, gutter,
sidewalk, etc. of various locations
within the City of Baldwin Park over
a period of six 6) months
July I, 1966 I:00 P.M.
City Hall Council Chambers
Gene Johnson
4535 Bresee Silveri Construction Peak Construction Co.
1241 Lakeview 4506 Shadydale Avenue Paul Gardner Corp. A. F. Wilson
901 S. Sultana 14300 School Street
Baldwin Park, Calif. La Habra, Calif Covina, Calif. Ontario, Calif Baldwin Park, Calif.
Proposal 1 Proposal 1 Proposai I Proposal I Proposal I
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Item A $ 1.00 $ 100.00 $ 1.25 $ 125.00 $ 1.35 $ 135.00 $ 1.30 $ 130.00 $ 1.50 $ 150.00
Item B 1.75 10,500.00 2.50 15,000.00 1.55 9,300.00 1.66 9,960.00 2.10 12,600.00
Item C 35 2,688.00 38 2,918.43 32 2,457.60 29 2,227.20 40 3,072.00
Item D 60 2,592.00 50 2,160.00 50 2,160.00 58 2,505.6o 60 2,592.00
Item E 1.00 1,000.00 1.50 1,500.00 75 750.00 1.20 1,200.00 1.10 1,100.00
Item F 75 150.00 1.25 250.00 60 120.00 70 140.00 85 170.00
TOTAL $17,030-00 $21,953.40 $ 11.,922.60 $16,162.80 $19,6%.00
Proposal II
Unit Price
Amount Proposal II
Unit Price
Amount Proposal II
Unit Price
Amount Proposal II
Unit Price Proposal II
Amount Unit Price
Amount
Item A $ 1.25 $ 125.00 1.35 $ 135.00 $ 1.45 $ 145.00 $ 1.40 $ 140.00 $ 1.70 $ 170.00
Item B 1.95 11,700.00 2.65 15,900.00 1.75 10,500-00 1.78 10,680.00 2.35 14,100.00
Item C 35 2, 688.00 40 3,072.00 35 2,688.00 32 2,457.60 5 3,1.G b.o0
Item D 65 2,808.00 52 2,246.40 60 2,592.00 63 2,721.6o 70 3,024.00
Item E 1.25 1,250.00 1.60 1,600.00 80 800.00 1.30 1'300.00 1.30 1,300.00
Item F 80 16o.oo 1.30 260.00 80 160.00 75 150.00 95 190.00
TOTAL $18,731.00 $23,213.40 $ 16, 885.00 $17,449.20 $22,240.00
BIB]
39576-U01
1966-U02
07-U02
01-U02
CC-U02
MIN-U02
LI1-U03
FO9994-U03
FO116938-U03
DO117003-U03
C4-U03
MINUTES1-U03
5/7/2008-U04
ROBIN-U04
REGULAR-U05
SESSION-U05
CITY-U06
COUNCIL-U06
1966 07 01 CC MIN HÄ—@¸— 1 ÂÍ«Page 2
CITY OF BALDWIN PARK
BID OPENING
Construction of P.C.C. curb, gutter,
sidewalk, etc. of various locations
within the City of Baldwin Park over
a period of six 6) months
July I, 1966 1:00 P.M.
City Hall Council Chambers
W. R. Wilkinson Company Inc.
Post Office Box 369 C. L. Concrete
IC9 N. Soldano J. Rullc Enterprises Alcon Construction
6300 E. Alondra Blvd. 7233 E. Alondra Blvd Sully-Miller
3000 E. South Contracting Co.
St.
Baldwin Park, Calif. Azusa, Calif. Paramount, Calif. Paramount, Ca l i f. Long Beach 5, Calif.
Proposal I
Unit Price
Amount Proposal
Unit Price Proposal i Proposal 1
Amount Unit Price Amount Unit Price
Amount Proposal I
Unit Price
Amount
Item A $ 1.50 $ 150.00 $ 1.65 $ 165.00 $ 1.35 $ 135.00 2.20 $ 220.00 2.50 $ 250.00
Item B 2.50 15,000.00 1.70 10,200.00 1.95 11,700.00 2.20 13,200.00 3.50 21, 000.00
Item C 50 3,840.00 35 2,688.00 40 3,072.00 40 3,072.00 55 L4, 224.00
Item D 65 2,808.00 50 2,160.00 55 2,376.00 54 2,332.80 65 2,808.00
Item E 1.15 1,150.00 75 750.00 1.50 1,500.00 1.30 1,300.00 95 950.00
Item F 1.00 200.00 70 140.00 70 140.00 1.09 218.00 65 130.00
TOTAL $23,148.00 $16,103.00 $18,923.00 $20,342.80 $29, 362.00
Proposal II
Unit Price Proposal II
Amount Unit Price Proposal II
Amount Unit Price Proposal II
Amount Unit Price
Amount Proposal II
Unit Price
Amount
Item A 2.00 $ 200.00 $ 1.85 $ 185.00 $ 3.00 $ 300.00 $ 2.40 $ 240.00 $ 3.00 $ 300.00
Item B 3.00 18, 000.00 1.90 11,400.00 2.50 15, 000.00 2.50 15, 000.00 4.25 25, 500.00
Item C 70 5,376.00 40 3,072.00 45 3,456.00 43 3,302.40 68 5,222.4.0
Item D 80 3,456.00 6o 2,592.00 60 2,592.00 57 2,462.40 78 3,369.6o
Item E 1.35 1,350-00 90 900.00 i.6o i,6oo.oo 1.40 1,400.00 1.25 1,250.00
Item F 1.20 240.00 85 170.00 80 160.00 1.15 230.00 85 170.00
TOTAL $28,622.00 $18,319.00 $23,108.00 $22,634.80 $35,812.00
BIB]
39576-U01
1966-U02
07-U02
01-U02
CC-U02
MIN-U02
LI1-U03
FO9994-U03
FO116938-U03
DO117003-U03
C4-U03
MINUTES1-U03
5/7/2008-U04
ROBIN-U04
REGULAR-U05
SESSION-U05
CITY-U06
COUNCIL-U06
1966 07 01 CC MIN HÄ—@¸— 1 ÂÍ«Page 3
CITY OF BALDWIN PARK
BID OPENING
Construction of P.C.C. curb, gutter,
sidewalk, etc. of various locations
within the City of Baldwin Park over
a period of six 6) months
July I, 1966 1:00 P.M.
City Hall Council Chambers
I, THELMA L. BALKUS, City Clerk of the City of Baldwin Park, do hereby CERTIFY that I opened the foregoing bids in the Council Chambers of the City Hall
at 1:00 p.m., July I, 1966, in the presence of City Engineer French, Assistant City Engineer Fogle and Deputy City Clerk Langseth.
e 74~yc~-J~
THELMA L. BALKUS, CITY CLERK
BIB]
39576-U01
1966-U02
07-U02
01-U02
CC-U02
MIN-U02
LI1-U03
FO9994-U03
FO116938-U03
DO117003-U03
C4-U03
MINUTES1-U03
5/7/2008-U04
ROBIN-U04
REGULAR-U05
SESSION-U05
CITY-U06
COUNCIL-U06
1966 07 01 CC MIN HÄ—@¸— 1 ÂÍ«CITY OF BALDWIN PARK
BID OPENING
For Furnishing Asphalt concrete, Barber Green
and Roller within the City of Baldwin Park
over a period of twelve 12) months
July I, 1966 1:00 P.M.
City Hall Council Chambers
Vernon Asphalt Materials Co. Industrial Asphalt Associated Asphalt Griffith Company
3200 E. Vernon Avenue 4829 Irwindale Ave. Paving Materials 1380 Arrow Hwy.
Los Angeles, Calif. 90058 Irwindale, Calif. 1313 West Gladstone Irwindale, Calif.
Azusa, California
Price Per Price Per Price Per Price Per
300 Ton L't A.C. Mix, 85-100 penetration
Per Month) a. Delivered
b. Picked up by City
3/8" A.C. Mix, 85-I00 penetra-
tion
a. Delivered
b. Picked up by City
Driveway Mix, 85-100 penetra-
tion
a. Delivered
b. Picked up by City
School Mix, 85-100 penetra-
tion
a. Delivered
b. Picked up by City
The 300 tons per month may be
made up of any combination of
the various mixes
300 Gal. Emulsion Asphalt Tack Coat)
Per Month) a. Picked up by City
I Ea. Barber Green with Operator
I Ea. Roller, 8 Ton, without
Operator Quote cost per
ton with material on site)
3.89 Ton
4.23 Ton
4.33 Ton
3.75
3.25 3.60
3.89
it
4.23
4.33
3.75
3.25 it 3.60
3.94
it
4.23
4.33
3.75
3.30 tt 3.60
4.0)4
3.40
n
4.23
3.60
4.33
3.75
No Bid 0.22 gal. 0.25
250.00 day(31.25 per 36.80* hr. 25.00
hr.)
180.00** 22.50 per 40.00 day 50.00
hr.)
** With operator * Includes two Screedmen
Del. Date as ordered Del. Date as required
Net 30 days.
tt
3.99
3.35
3.99
3.35
Ton
it
tt 3.99 n
if 3,35
4.19
3.35
n
gal. 0.20 gal.
hr.(4 hr. 30.00 hr.
min.)
day 50.00 day
Del. Date 48 hr. notice
Net 30 days
BIB]
39576-U01
1966-U02
07-U02
01-U02
CC-U02
MIN-U02
LI1-U03
FO9994-U03
FO116938-U03
DO117003-U03
C4-U03
MINUTES1-U03
5/7/2008-U04
ROBIN-U04
REGULAR-U05
SESSION-U05
CITY-U06
COUNCIL-U06
1966 07 01 CC MIN HÄ—@¸— 1 ÂÍ«Page 2 CITY OF BALDWIN PARK
BID OPENING
For Furnishing Asphalt concrete, Barber Green
and Roller within the City of Baldwin Park
over a period of twelve 12) months
July I, 1966 1:00 P.M.
City Hall Council Chambers
I, THELMA L. BALKUS, City Clerk of the City of Baldwin Park, do hereby CERTIFY that I opened the foregoing bids in the Council Chambers of the City Hall
at 1:00 p.m., July I, 1966, in the presence of City Engineer French, Assistant City Engineer Fogle and Deputy City Clerk Langseth.
THELMA L. BALKUS, CITY CLERK
BIB]
39576-U01
1966-U02
07-U02
01-U02
CC-U02
MIN-U02
LI1-U03
FO9994-U03
FO116938-U03
DO117003-U03
C4-U03
MINUTES1-U03
5/7/2008-U04
ROBIN-U04
REGULAR-U05
SESSION-U05
CITY-U06
COUNCIL-U06
1966 07 01 CC MIN HÄ—@¸— 1 ÂÍ«CITY OF BALDWIN PARK
810 0PE NIG
For Furnishing Rock, Sand and Dumping
within the City of Baldwin Park over
a period of twelve 12) months
July 1, 1966 1:00 P.M.
City Hall Council Chambers
Item I Item 2 Item 3 item 4
Delivered Picked Up Price Per Price Per Price Per Deliver Date
By city
1. Azusa Rock & Sand Co. *1.30-1.37 1.00 ***C 95 fon Concrete) ***I.10 ton 0.70 per Yd. As Required Terms Net
P. 0. Box 575 *Depending on P.U.C. ton Plaster) ***Picked up 5.00 per stump for pay-
Azusa, California Zone by City ment 25th
proximo
2. Livingston-Graham Inc. 1.58 1.20 155 ton 1.83 ton Nio Bid On Request 20~ per
5500 N. Peck Road ton J
El Monte, Ceiifornia days
3 Consolidated Rock Products 1.55 1.20 **l,15 ton **1.30 ton No BI day notice 20' per
P. 0. Box 2950 **FO' Irwindale Plant ton 2~
Los Angeles, California days
I, THELMA L. BALKUS, City Clerk of the City of Baldwin Park, do hereby CERTIFY that I opened the foregoing bt:~ in the Council Chambers of
the City Hall at 1:00 p.m., July I, 1966, In the presence of City Engineer French, Assistant City Engineer Fooie and Deputy City Clerk
Langseth.
THELMA L. BALKUS, CITY CLERK
BIB]
39576-U01
1966-U02
07-U02
01-U02
CC-U02
MIN-U02
LI1-U03
FO9994-U03
FO116938-U03
DO117003-U03
C4-U03
MINUTES1-U03
5/7/2008-U04
ROBIN-U04
REGULAR-U05
SESSION-U05
CITY-U06
COUNCIL-U06