Loading...
HomeMy WebLinkAbout1966 07 01 CC MIN1966 07 01 CC MINHÄ—@¸—1ÂÍ«CITY OF BALDWIN PARK BID OPENING Construction of P.C.C. curb, gutter, sidewalk, etc. of various locations within the City of Baldwin Park over a period of six 6) months July I, 1966 I:00 P.M. City Hall Council Chambers Gene Johnson 4535 Bresee Silveri Construction Peak Construction Co. 1241 Lakeview 4506 Shadydale Avenue Paul Gardner Corp. A. F. Wilson 901 S. Sultana 14300 School Street Baldwin Park, Calif. La Habra, Calif Covina, Calif. Ontario, Calif Baldwin Park, Calif. Proposal 1 Proposal 1 Proposai I Proposal I Proposal I Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Item A $ 1.00 $ 100.00 $ 1.25 $ 125.00 $ 1.35 $ 135.00 $ 1.30 $ 130.00 $ 1.50 $ 150.00 Item B 1.75 10,500.00 2.50 15,000.00 1.55 9,300.00 1.66 9,960.00 2.10 12,600.00 Item C 35 2,688.00 38 2,918.43 32 2,457.60 29 2,227.20 40 3,072.00 Item D 60 2,592.00 50 2,160.00 50 2,160.00 58 2,505.6o 60 2,592.00 Item E 1.00 1,000.00 1.50 1,500.00 75 750.00 1.20 1,200.00 1.10 1,100.00 Item F 75 150.00 1.25 250.00 60 120.00 70 140.00 85 170.00 TOTAL $17,030-00 $21,953.40 $ 11.,922.60 $16,162.80 $19,6%.00 Proposal II Unit Price Amount Proposal II Unit Price Amount Proposal II Unit Price Amount Proposal II Unit Price Proposal II Amount Unit Price Amount Item A $ 1.25 $ 125.00 1.35 $ 135.00 $ 1.45 $ 145.00 $ 1.40 $ 140.00 $ 1.70 $ 170.00 Item B 1.95 11,700.00 2.65 15,900.00 1.75 10,500-00 1.78 10,680.00 2.35 14,100.00 Item C 35 2, 688.00 40 3,072.00 35 2,688.00 32 2,457.60 5 3,1.G b.o0 Item D 65 2,808.00 52 2,246.40 60 2,592.00 63 2,721.6o 70 3,024.00 Item E 1.25 1,250.00 1.60 1,600.00 80 800.00 1.30 1'300.00 1.30 1,300.00 Item F 80 16o.oo 1.30 260.00 80 160.00 75 150.00 95 190.00 TOTAL $18,731.00 $23,213.40 $ 16, 885.00 $17,449.20 $22,240.00 BIB] 39576-U01 1966-U02 07-U02 01-U02 CC-U02 MIN-U02 LI1-U03 FO9994-U03 FO116938-U03 DO117003-U03 C4-U03 MINUTES1-U03 5/7/2008-U04 ROBIN-U04 REGULAR-U05 SESSION-U05 CITY-U06 COUNCIL-U06 1966 07 01 CC MINHÄ—@¸—1ÂÍ«Page 2 CITY OF BALDWIN PARK BID OPENING Construction of P.C.C. curb, gutter, sidewalk, etc. of various locations within the City of Baldwin Park over a period of six 6) months July I, 1966 1:00 P.M. City Hall Council Chambers W. R. Wilkinson Company Inc. Post Office Box 369 C. L. Concrete IC9 N. Soldano J. Rullc Enterprises Alcon Construction 6300 E. Alondra Blvd. 7233 E. Alondra Blvd Sully-Miller 3000 E. South Contracting Co. St. Baldwin Park, Calif. Azusa, Calif. Paramount, Calif. Paramount, Ca l i f. Long Beach 5, Calif. Proposal I Unit Price Amount Proposal Unit Price Proposal i Proposal 1 Amount Unit Price Amount Unit Price Amount Proposal I Unit Price Amount Item A $ 1.50 $ 150.00 $ 1.65 $ 165.00 $ 1.35 $ 135.00 2.20 $ 220.00 2.50 $ 250.00 Item B 2.50 15,000.00 1.70 10,200.00 1.95 11,700.00 2.20 13,200.00 3.50 21, 000.00 Item C 50 3,840.00 35 2,688.00 40 3,072.00 40 3,072.00 55 L4, 224.00 Item D 65 2,808.00 50 2,160.00 55 2,376.00 54 2,332.80 65 2,808.00 Item E 1.15 1,150.00 75 750.00 1.50 1,500.00 1.30 1,300.00 95 950.00 Item F 1.00 200.00 70 140.00 70 140.00 1.09 218.00 65 130.00 TOTAL $23,148.00 $16,103.00 $18,923.00 $20,342.80 $29, 362.00 Proposal II Unit Price Proposal II Amount Unit Price Proposal II Amount Unit Price Proposal II Amount Unit Price Amount Proposal II Unit Price Amount Item A 2.00 $ 200.00 $ 1.85 $ 185.00 $ 3.00 $ 300.00 $ 2.40 $ 240.00 $ 3.00 $ 300.00 Item B 3.00 18, 000.00 1.90 11,400.00 2.50 15, 000.00 2.50 15, 000.00 4.25 25, 500.00 Item C 70 5,376.00 40 3,072.00 45 3,456.00 43 3,302.40 68 5,222.4.0 Item D 80 3,456.00 6o 2,592.00 60 2,592.00 57 2,462.40 78 3,369.6o Item E 1.35 1,350-00 90 900.00 i.6o i,6oo.oo 1.40 1,400.00 1.25 1,250.00 Item F 1.20 240.00 85 170.00 80 160.00 1.15 230.00 85 170.00 TOTAL $28,622.00 $18,319.00 $23,108.00 $22,634.80 $35,812.00 BIB] 39576-U01 1966-U02 07-U02 01-U02 CC-U02 MIN-U02 LI1-U03 FO9994-U03 FO116938-U03 DO117003-U03 C4-U03 MINUTES1-U03 5/7/2008-U04 ROBIN-U04 REGULAR-U05 SESSION-U05 CITY-U06 COUNCIL-U06 1966 07 01 CC MINHÄ—@¸—1ÂÍ«Page 3 CITY OF BALDWIN PARK BID OPENING Construction of P.C.C. curb, gutter, sidewalk, etc. of various locations within the City of Baldwin Park over a period of six 6) months July I, 1966 1:00 P.M. City Hall Council Chambers I, THELMA L. BALKUS, City Clerk of the City of Baldwin Park, do hereby CERTIFY that I opened the foregoing bids in the Council Chambers of the City Hall at 1:00 p.m., July I, 1966, in the presence of City Engineer French, Assistant City Engineer Fogle and Deputy City Clerk Langseth. e 74~yc~-J~ THELMA L. BALKUS, CITY CLERK BIB] 39576-U01 1966-U02 07-U02 01-U02 CC-U02 MIN-U02 LI1-U03 FO9994-U03 FO116938-U03 DO117003-U03 C4-U03 MINUTES1-U03 5/7/2008-U04 ROBIN-U04 REGULAR-U05 SESSION-U05 CITY-U06 COUNCIL-U06 1966 07 01 CC MINHÄ—@¸—1ÂÍ«CITY OF BALDWIN PARK BID OPENING For Furnishing Asphalt concrete, Barber Green and Roller within the City of Baldwin Park over a period of twelve 12) months July I, 1966 1:00 P.M. City Hall Council Chambers Vernon Asphalt Materials Co. Industrial Asphalt Associated Asphalt Griffith Company 3200 E. Vernon Avenue 4829 Irwindale Ave. Paving Materials 1380 Arrow Hwy. Los Angeles, Calif. 90058 Irwindale, Calif. 1313 West Gladstone Irwindale, Calif. Azusa, California Price Per Price Per Price Per Price Per 300 Ton L't A.C. Mix, 85-100 penetration Per Month) a. Delivered b. Picked up by City 3/8" A.C. Mix, 85-I00 penetra- tion a. Delivered b. Picked up by City Driveway Mix, 85-100 penetra- tion a. Delivered b. Picked up by City School Mix, 85-100 penetra- tion a. Delivered b. Picked up by City The 300 tons per month may be made up of any combination of the various mixes 300 Gal. Emulsion Asphalt Tack Coat) Per Month) a. Picked up by City I Ea. Barber Green with Operator I Ea. Roller, 8 Ton, without Operator Quote cost per ton with material on site) 3.89 Ton 4.23 Ton 4.33 Ton 3.75 3.25 3.60 3.89 it 4.23 4.33 3.75 3.25 it 3.60 3.94 it 4.23 4.33 3.75 3.30 tt 3.60 4.0)4 3.40 n 4.23 3.60 4.33 3.75 No Bid 0.22 gal. 0.25 250.00 day(31.25 per 36.80* hr. 25.00 hr.) 180.00** 22.50 per 40.00 day 50.00 hr.) ** With operator * Includes two Screedmen Del. Date as ordered Del. Date as required Net 30 days. tt 3.99 3.35 3.99 3.35 Ton it tt 3.99 n if 3,35 4.19 3.35 n gal. 0.20 gal. hr.(4 hr. 30.00 hr. min.) day 50.00 day Del. Date 48 hr. notice Net 30 days BIB] 39576-U01 1966-U02 07-U02 01-U02 CC-U02 MIN-U02 LI1-U03 FO9994-U03 FO116938-U03 DO117003-U03 C4-U03 MINUTES1-U03 5/7/2008-U04 ROBIN-U04 REGULAR-U05 SESSION-U05 CITY-U06 COUNCIL-U06 1966 07 01 CC MINHÄ—@¸—1ÂÍ«Page 2 CITY OF BALDWIN PARK BID OPENING For Furnishing Asphalt concrete, Barber Green and Roller within the City of Baldwin Park over a period of twelve 12) months July I, 1966 1:00 P.M. City Hall Council Chambers I, THELMA L. BALKUS, City Clerk of the City of Baldwin Park, do hereby CERTIFY that I opened the foregoing bids in the Council Chambers of the City Hall at 1:00 p.m., July I, 1966, in the presence of City Engineer French, Assistant City Engineer Fogle and Deputy City Clerk Langseth. THELMA L. BALKUS, CITY CLERK BIB] 39576-U01 1966-U02 07-U02 01-U02 CC-U02 MIN-U02 LI1-U03 FO9994-U03 FO116938-U03 DO117003-U03 C4-U03 MINUTES1-U03 5/7/2008-U04 ROBIN-U04 REGULAR-U05 SESSION-U05 CITY-U06 COUNCIL-U06 1966 07 01 CC MINHÄ—@¸—1ÂÍ«CITY OF BALDWIN PARK 810 0PE NIG For Furnishing Rock, Sand and Dumping within the City of Baldwin Park over a period of twelve 12) months July 1, 1966 1:00 P.M. City Hall Council Chambers Item I Item 2 Item 3 item 4 Delivered Picked Up Price Per Price Per Price Per Deliver Date By city 1. Azusa Rock & Sand Co. *1.30-1.37 1.00 ***C 95 fon Concrete) ***I.10 ton 0.70 per Yd. As Required Terms Net P. 0. Box 575 *Depending on P.U.C. ton Plaster) ***Picked up 5.00 per stump for pay- Azusa, California Zone by City ment 25th proximo 2. Livingston-Graham Inc. 1.58 1.20 155 ton 1.83 ton Nio Bid On Request 20~ per 5500 N. Peck Road ton J El Monte, Ceiifornia days 3 Consolidated Rock Products 1.55 1.20 **l,15 ton **1.30 ton No BI day notice 20' per P. 0. Box 2950 **FO' Irwindale Plant ton 2~ Los Angeles, California days I, THELMA L. BALKUS, City Clerk of the City of Baldwin Park, do hereby CERTIFY that I opened the foregoing bt:~ in the Council Chambers of the City Hall at 1:00 p.m., July I, 1966, In the presence of City Engineer French, Assistant City Engineer Fooie and Deputy City Clerk Langseth. THELMA L. BALKUS, CITY CLERK BIB] 39576-U01 1966-U02 07-U02 01-U02 CC-U02 MIN-U02 LI1-U03 FO9994-U03 FO116938-U03 DO117003-U03 C4-U03 MINUTES1-U03 5/7/2008-U04 ROBIN-U04 REGULAR-U05 SESSION-U05 CITY-U06 COUNCIL-U06