HomeMy WebLinkAbout1998 075 CC RESO1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8 RESOLUTION NO.98-75
A RESOLUTION OF ThE CITY COUNCIL OF THE CITY
OF BALDWIN PARK AMENDING RESOLUTION NO.96-
rs 8ETTING FEES AND CHARGES FOR ISSUANCE1
PROCESSING AND RuNG OF VARIOUS SERVICES AND
PERMITS IN THE CITY
THE CITY COUNCIL OF ThE CEW OF BALDWIN PARK DOES RESOLVE AS FOLLOWS:
SECTION 1. Resolution No. Z76 Is hereby amanded by adding thou fees us sat forth In the
attached Chart of Fees and Charges1 marked Exhibit K'
SECTION 2. That said Chart of Fees and Charges shall become effective Immediately.
SECTIONS. That the Deputy City Clerk shall certdZ' as totne adoption of this Resolution and shall
cause the same to be processed in the manner required by law.
APPROVED AND ADOPTED this 10th day of SepteZr,199,8,Z>
MAYOR
AflEST:
ELLEN PARKS, DEPUTY CITY CLERK
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES) 55.
CITY OF BALDWIN PARK
I, ELLEN PARKS, Deputy City Clerk of the City of Baldwin Park do hereby certifZ that the foregoing
resolution was duly and regularly passed and adopted by the City council of the city of Baldwin Park at Its
regular meeting of the City Council September 10,1998 by the following vote:
AYES WZMIO, MUSE, VAN CLEAVE, PACIECO, AND MAYOR BWflEflE IWES
NOES NONE
ABSENT: spun
ABSTAIN: winy
Ellen Parks, Deputy City Clerk
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8 Gin OF BALDWIN PARK
EXHIBIT A"
SCHEDULE OF FEES AND CHARGES
RESOLUTION 98-76
SPECIAL SERVICES
Government Reports
Municipal Code Complete $ 75.00
Municipal Code Addendum Subscription 20.00
Zoning Code Complete COST TO
Zoning Code Addendum Subscription DUPLICATE)
City Budget 20.00
General Reports 1st sheet of series 1.00
each additional 15
Police Reports 15.00
Police Background Investigation Civil 15.00 hour
Citation Verification Equipment Violations 10.00
Agenda Packet 25.00
General Plan only) 55.00
OR COST TO DUPLICATE)
Zoning Map 8.00
General Plan Map 5.00
Building Plan Records Letter Size 10 sheet
Other Size 35 sheet
Photographs $10.00 All Sizes
Miscellaneous Permits
Entertainment Permit Initial 250.00
Entertainment Permit Renewal 175.00
Gun Permit Application 3.00
Business Alarm Permits Initial Hookup 25.00
Strong Motion Instrumentation Fee 0.007%
% of construction cost)
Booking Fees City Jail) 75.00
Fingerprints
Applicant supplies card and forwards to DOJ for 10.00/set +
clearance State Fee
Department takes prints and forwards to DOJ for 10.00/set +
clearance State Fee
Administrative Fee 9.00/set
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8 * SCHEDULE OF FEES AND CHARGES PAGE 2
Impounds
Impound/Stored Vehicles Release $ 40.00
Driving Under Influence DUI)/Stored Vehicle 230.00
Vendor Carts human Dowered) 108.00
Vendor Merchandise After Court Disposition) 40.00
Shopping Cart Retrieval par can) 3.00
Appeals
Filing and Processing Fee $ 50.00ea
Zoning and Subdivision Appeals 300.00
Public Nuisances Abatement Costs Exceeds $1,000 50.00 ca
Abatement Costs less than $1¶,000 10.00 ea
Fireworks
Permit and Processing Fee No Charge
Compliance Deposit & Inspection Fee Non-Refundable 50.00
Liability Insurance As Required
Returned Checks NSF/etc 25.00
Bicycle License Annual Fee Set by State
Animal Control Dog License Fee Set by County
Parade Permit and/or Demonstrations 25.00
Refuse Collection and Disposal Set by Council Resolution
Temporary Waste Bins Public Right-of Way Only 20.00 ea
Barricades and Reflective Tape)) two week period
Non-Exclusive Franchise Fee Commercial/Industrial 750.00
Business License
Transfer to New Location 25.00 ea
Duplicate Certificate Lost or Destroyed 5.00ea
Processing and Inspections Fee New License) One Time Fee
Commercial License 75.00
Home Occupation 25.00
Bankruptcy. Fire and Close-out Sales
Filing and Processing Fee 30 Days 50.00& ea
60 Days 100.00 ea
90 Days 150.00 ea
Complete Business License Address Computer Print-out 75.00 ea
Bingo Permits 50.00 year
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8 * SCHEDULE OF FEES AND CHARGES PAGE 3
Court Referral Program
1 120 Hours 20.00
121 Hours Plus Fee
Worker's Compensation
Dances
Permit Filing and Processing Fee 50.00ea
Safety Services Set by P.D.
Handbills
Permit Filing and Processing 50.00ea
Massage Parlors
Permit Filing and Processing Fee 250.00
New Employee Checks 25.00
Taxicabs
Certificate of Convenience and Necessity 500.00
Annual Renewal of Certificate 350.00
Liability Insurance As required
Changes in Drivers. Vehicles, Etc. As required
Temporary Use Permits
Filing and Investigation Fee 115.00ea
Street Benches
Permit Filing and Processing fee 10.00/bench/yr
Bench Removals by City 25.00 ea
Bench Storage by City max 60 days 10.00/week/ea
Street Banners
Permit Filing and Processing Fee 50.00 ea
Yard Sales
Only Allowed 1st weekend of March, June, September and No Fee
December
Motorized Vending Catering/Ice Cream/Produce Trucks)
Background Check 100.00
Fingerprints and/or Palm Prints 50.00
Sellers Permit Owner) 50.00
Truck Inspection 35.00
Reinspection 17.00
Vendor's Permit Per Driver) 15.00
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8 * SCHEDULE OF FEES AND CHARGES I PAGE 4
COMMUNITY CENTER/RECREATION
Park Facilities and Recreation Activities
Facility Building) Fees
Fees/ per hour/rate) Less than 100 More than 100
Res. Non-Res. Res. Non-Res.
Assembly Hall $10.00 $15.00 $15.00 $20.00
Meeting Room Craft Room 7.00 12.50
Kitchen/Serving equipment 7.50 15.00 15.00 25.00
Kitchen Deposit 50.00 flat per day
Gymnasium 25.00 35.00 50.00 75.00
Equipment/Supplies
TV/VCR & P.A System 25.00 flat per day
Slide Projector & Screen 15.00 flat per day
Tablecloth 2.50 pe: tablecloth
Coffee 10.00 50 or less)
15.00 50 or more)
Tables Deposit 50.00 flat
per table 2.00
per chair 25
Weightroom/Boxing Gym
RESIDENTS ANNUAL MONTHLY DAY
8-17 Years $ 30.00 $ 3.00 $ 25
*18 yrs&over $100.00 $10.00 $2.00
NON-RESIDENTS 8-17 Years $ 60.00 $ 6.00 $ 50
18 yrs & over $200.00 $20.00 $ 4.00
Pool Fees
Rental Residential) $ 80.00 1-99/2 hrs/ 1 guard
$160.00 100-199/2 hrs/2 guards
Admissions RESIDENTS NON-RESIDENTS
Youth 0-17 25 1.00
Adults 18-54 * 50 1.50
Sr. Citizens 55 and Older Free 50
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 5
Pool Fees con't)
Swim Classes RESIDENTS NON-RESIDENTS
Youth Registration 5.00 20.00
Adult Registration 10.00 25 00
Recreational Activities RESIDENTS N ON-RESIDENTS
Youth 5.00 20.00
Adult 7.50 25.00
Non-Resident Application In Addition to Use Charges)
Processing Fee 10.00
Special Facilities 10.00 hour
Facilities Not &scheduled to be Open 7.50 hour
Sports Field RESIDENTS NON-RESIDENTS
25.00 hour 35.00 hour
Lighting
Sports Lighting Maximum 2 1/2 hours 16.00 game
8.00 per
team
Reservation of Covered picnic Areas 7.50 per hour
COMMUNITY CENTER RESIDENTS NON-RESIDENT
Meeting Room $ 10.00/hr. $ 15.00/hr
Double Size) 20.00/hr 30.00/hr
Cleaning/Dam age Security 50.00 50.00
Gymnasium 25.00/hr 35.00/hr
Security 15.00/hr 15.00/hr
Cleaning/Damage Security 150.00 150.00
Game Room 20.00/hr 25.00/hr
Cleaning/Damage Security 100.00 100.00
AQUATIC FACILITY
Pool 1 50) 35.00/hr 50.00/hr
51 100) 42.00/hr 62.00/hr
101 150) 52.00/hr 80.00/hr
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 6
SENIOR CITIZENS CENTER RESIDENTS NON-RESIDENTS
Assembly Hall 1 100) $ 60.00/hr $ 70.00/hr
101+) 80.00/hr 90.00/hr
Decorating Fee 20.00/hr 20.00/hr
Security 1 100) 15.00/hr 15.00/hr
101+) 30.00/hr 30.00/hr
Cleaning/Damage Security 250.00 250.00
Classroom No Kitchen) 20.00/hr 30.00/hr
Decorating Fee 20.00/hr 20.00/hr
Security 15.00/hr 15.00/hr
Cleaning/Damage Security 150.00 150.00
BALLFIELD
Softball Field 25.00/hr 35.00/hr
Cleaning/Damage Security 50.00 50.00
ANNEX BUILDING
General Hall/Kitchen 20.00/hr 30.00/hr
Decorating Fee 20.00/hr 20.00/hr
Security 15.00/hr 15.00/hr
Cleaning/Damage Security 150.00 150.00
PICNIC FACILITIES
Shelter 20.00 20.00
flat fee flat fee
WALNUT CREEK PARK
Outdoor Assembly Shelter 20.00/hr 35.00/hr
Security 15.00/hr 15.00/hr
Cleaning/Damage Security 150.00 150.00
Security and Cleaning/Damage Fees Imposed at the discretion of the
Recreation and Community Services Director or his designee
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE
ENGINEERING FEES
Encroachment Moving and Load Regulations
Permit Filing and Processing Fee for Moving Load or Vehicle 15.00 ea
Over width, Height or Weight Per Occurrence
Encroachments
Gunite Storage 25.00 ea
Gunite Cleanup-Deposit returnable) 20.00 ea
Overhead Structures 300.00 ea
The tee for other encroachment permits not listed will be determined by the Director
of Public Works
Pavement Restoration
Utility Cuts 4.00 s.f.
$3.70 s.f. Refundable if work performed by permittee)
Engineering Fees
Expedite Map/Plan Check 11/2 times the fee
For items not covered in the Fee schedule a minimum of one 1) hour will be charged
at the minimum hourly rate of $ 50.00
Subdivision Filing and Plan Check Fee
Tentative Parcel Map 1500.00
Tentative Tract Map 2000.00
First Ten Lots or Units)
+ 45.00/Lot or Unit
Lots or Units 11-25)
+ 25.00/Lot or Unit
Lots or Units 26-50)
Parcel Map Final Map) 2400.00 + $60/Parcel
Tract Map Final Map) 2400.00 + $60/Lot
Easement Deed' 450.00
Easement Checking 400.00
Monument Inspection 425.00 ea Parcel Map
800.00 ea Tract Map
Verification that City Map is consistent with conditions
of tentative approval 300.00
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g 8 SCHEDULE OF FEES AND CHARGES PAGE 8
Verification that City Grant of Waiver and Certificate of
Compliance are consistent with conditions of tentative approval 300.00
Agreement and/or Improvement Security 300.00 ea
Extension of Time for Improvement Agreement 250.00 per
letter
Fourth Submittal of Originals and/or Prints 450.00
Sixth Submittal of Originals and/or Prints 1250.00
Eighth Submittal of Originals and/or Prints and each Subsequent
Submittal 1500.00
Extension of Time for Final Map
Six Months 250.00
One Year 500.00
Recordation Fees
First Sheet 06.00
Second Sheet and All Subsequent Sheets 2.00 ea
Certification of Correction 500.00
Certificate of Compliance'
1000.00
Street Vacation' 1000.00
Covenant and Agreement 600.00
Lot Line Adjustment 1500.00
Miscellaneous Documents 600.00
The fee for these items includes only the review of the legal description and the
research associated with the particular case. However, if the City provides the legal
description add $150 to the fee indicated.
Improvement Plans
A fee shall be charged at the time of plan submittal in the amount set forth below.
1. Plan Check:
Improvement Valuation Fee
$ 0-999 $150.00
$ 1,000-9,999 $ 150+ 11%x Valuation 1,000)
$ 10,000 49,999 $1,140 + 8% x Valuation 10,000)
$ 50,000 99,999 $4,340 + 4% X Valuation 50,000)
$ 100,000-999,999 $6,340 + 2% x Valuation
100,000)
$ 1,000,000 and over $24,340 + 1.5% x Valuation 1,000,000)
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú
RESO 98-75 SEP 16 1998H0g
8 SCHEDULE OF FEES AND CHARGES PAGE 9
2. Inspection: Inspection fee shall be 100% of the plan check tee.
Drainage Plans
One 1) lot to three(3) lots 120.00
Four 4) lots or more 500.00
Erosion Plan Inspection Fees
Less than One Acre 50.00
One Acre but Less Than S Acres 200.00
GRADING AND EXCAVATION
Plan Check Yardage Base Amount Vol In CV or Exceeding
Fraction of CV of
50 to 100 CY 140 minimum
101 to 1,000 CY $ 140+ 60 per 100 100
1,001 to 10,000 CY $ 700+ 70 per 1,000 1.000
10,001 to 100,000 CY $ 1330 80 per 10,000 103000
Over 100,000 CY $2,050+ 50 per 10,000 10,000
Inspection
Permit Issuance Base Amount Vol in CY or Exceeding
Yardage Fraction of CV of
0 to 100 CY S 280 minimum
bib 1,000 CY $ 280+ 70 per 100 100
1,000 to 10,000 CY $ 910+ 10 per 1,000 1.000
10,000 to 100,000 CY $ 1,810+ 200 per 10,000 10,000
Over 100,000 CY $ 3,610+ 100 per 10,000 100,000
Fourth Submittal and each Subsequent Submittal for 25% of
Grading, Drainage and Improvement Plan Checks original plan
check fee
Reproduction Costs
Blueline prints 24" x 18") 5.00/ First &
Blueline prints 24" x 36£) 3.00(each
Sepia any size) additional print
Final Map Blueline I
Copy 8 1/2"x 11"or 8 1/2" x 14") 25 ea
Materials Purchase
Plain Mylar 24" x 36") 5.00 ea
Plan & Profile Mylar 24" x 36") 6.00 ea
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 10
Sewer Connection Permit Fee
Residential 50.00/per dwelling unit
20.00 dwelling unit if more
than 10 units
Commercial & Industrial 100,00 per unit
50.00 per unit if more
than 10 units
Rectangular lot depth, 100 ft or less 8.00 ft
Rectangular lot depth, more than 100 ft 8.00 ft +
0.01 s.f. over 100 ft of depth
Irregular lot, frontage 60 ft or less 8.00 ft or
0.08 s.f. for first 6000 s.f.,
whichever is greater. +
0.01 s.f. for all areas in excess
of 6000 s.t
Irregular lot frontage greater than 60 ft 8.00 fl +
0.01 s.f. for all areas in excess
of 6000 s.f.
Each existing lateral utilized by property owner(s) 175.00
Public Works Permit
Note: Permit fees are computed at 5% of the total valuation of the work to be done
under the permit. The unit costs listed shall be used in calculating the total work
valuation as appropriate. In no event shalt the minimum permit fee be less than $100.00.
The cost of removals shall be calculated at 60% of the construction cost.
Curb Only 10.00 1.1.
Roll Curb 12.00 l.f.
Cross Gutter 16.00 1.1.
Curb and Gutter 16.00 l.f.
Parkway Landscaping 2.00 s.f.
Sidewalk 4" RC.C.) 3.50 s.f.
Drive Approach 6' P.C.C.) 4.50 s.f.
Crushed Aggregate IBase 1.25 s.f.
Asphalt Pavement:
4' thick 1.50 s.f.
4' thick 2.50 s.f.
Wheelchair Ramp 4" P.C.C.) 450.00 ea
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú
1998 075 CC RESO¹òw @˜ ’ Ú
RESO 98-75 SEP 16 1998H0g
85CHEDULE OF FEES AND CHARGES
PAGE 12
Traffic
Striping or Lane Line Marking 0.15 If
Lettering/Arrow 15.00 ea
Street Name Signs 2) & Post 250.00 ea
Traffic Regulator; Sign 170.00 ea
Traffic Signal 2 to 4 phase) $70,000.00
Traffic Signal 5 to 8 phase) 90,000.00
Traffic Signal Mod ilication 15,000.00
Street Light 2,000.00 ea
Street Tree Installation 175.00
ea
Reinspection Fee
3rd and Each Subsequent Inspection
65.00
Site Review Plans
Room Addition More than $10,000 25.00
Street Name Change Application Fees 1,000.00
Cost of signs, upon approval of street name change, determined by the Director of
Public Works
TEMPORARY USE PUBLIC WORKS PERMIT FEES
INCLUDES UTILITIES
Lane Closure No Street Cuts
Per Occurrence 100.00
Monthly Permit 350.00
Annual Permit 3,000.00
Approved Road Closure 500.00 day
If Public Convenience Dictates
All utility permits for excavation or street cuts in the City's rightZf-way or in the City's
future right-of-way as determined by the City's General Plan shall be issued to utility
companies.
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 13
PENALTY WORK COMMENCED PRIOR
It any work is commenced on public right-of-way without a permit, the Permittee must
obtain an after-the-fact permit. fl r. Is determined that the work was an emergency in
nature and it is approved by the Director of Public Works then the after-the-fact permit
tee will be charged as a regular permit tee.
After the-Fact Permit Issuance Double the Total Fees
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 14
PLANNING FEES
Planning Fees
Administrative Adjustment 500.00
Zone Variance or Conditional Use Permit 1,000.00
Zone Variance Single Family Single Lot) 325.00
Amendment to the Zoning Code or the General Plan 2,500.00
Zone Change Only 1,800.00
Development Agreement Actual Costs Incurred by Staff
Development Plan 1,500.00
Environmental Review
Categorical Exemption 60.00
Negative Declaration 180.00
Environmental Impact Report review only) 70.00 hr*
Environmental Impact Report preparation) A C t U a I C 0 S t S
incurred
Combined Public Hearings 100% of highest and
50% of any additional
Plus any reasonable expenses for staff or consultant services.
Zoning Map Copy 8.00 ea
General Plan Map Copy 8.00 ea
Appeals, Zoning To Planning Commission or City Council)
300.00
Appeals, Tentative Maps 300.00
Time Extension 400.00
Sign Permit 5000
Plan Review/Design Review
Commercial/lndustrial/office Residential Maximum Commercial
New Construction Dwelling Office/Industrial
Square Feet Units Remodel Value FEE
1 11000 $100,000 $200.00
11001 3,000 2-4 200.000 325.00
3,001 6,000 56 400,000 475.00
6,001 10,000 7-10 700,000 625.00
10,000 15,000 11-15 1,000,000 900.00
15,001 20,000 16-20 1,500,000 1,100,00
CONTINUED NEXT PAGE)
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 15
20,001 27,000 21-25 OVER 1,500.000 1,300.00
27,001 35,000 2835 1,500.00
35,001 45,000 3645 1,750.00
45,001 60,000 46-60 2,000.00
60,001 100,000 61-100 2,300.00
100,00 150,000 101-150 2,600.00
Over 150,000 over 150 3,000.00
The initial plan review/design fee shall cover initial review of the plans plus review of
up to two revised plans. Further review shall be charged at 33.3 percent of the base fee
rounded to the nearest $5.00) for each revision.
Publications
Zoning Code Complete AT
Zoning Code addendum Subscription DUPLICATION
General Plan only) COST
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 16
BUILDING FEES
Building Fees AEIHB & B4 Occupancies')
1. Permit Fee:
Valuation fees see BUILDING ATTACHMENT I)
2. Plan Check Fees:
* Plan check fee is 85% of the building permit fee, with a minimum t $82.00.
* Handicapped plan check fee is 5% of the building permit fee.
* Plan check fees will not be charged for reroofing or air conditioning when plans
are not required.
* For R1, R3 & M Occupancies, use 80% of the fees tables above.
Building Permits
Reinspection Fee 65.00
Certificate of Occupancy Original No Charge
Certificate of Occupancy Subsequent 40.00
Certificate of Occupancy Temporary 57.50
Request for Address Change 750.00
Building Regulations Variance
Filing and Processing Fee 65.00
Energy Conservation Regulation
Plan Check and Permit Fee 20% of total of building permit and
plan check fee
Uniform Plumbing Code
For Issuing Each Permit 28.00
In Addition:
For each plumbing fixture or trap or set of fixtures on one trap 12.00
including water, drainage, piping and backflow protection thereof)
For each building sewer and each trailer park sewer 15.00
Rainwater Systems per drain 12.00
For each sewer connection 40.00
For each private sewage disposal system 30.00
For each sewer cap 12.00
For each water heater and/or vent 12.00
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 17
Description
For each gas piping system of one 1) to five 5) outlets 12.00
For each gas piping system of six 6) or more, per outlet
3.00
For each industrial waste pretreatment interceptor. including 15.00
its trap and vent, excepting kitchen-type grease interceptors
functioning as fixture traps.
For installation, alteration or repair of water piping and/or water 15.00
treating equipment
For repair or alteration of drainage or venting piping 12.00
For each lawn sprinkler system or any one meter including 12.00
backflow protection devices therefor
For vacuum breakers or backflow protective devices on tanks,
15.00
vats, etc., or for Installation on unprotected plumbing fixtures
including necessary water piping one to five
Over five, each 00
Plumbing Reinspection Fee 65.00
Uniform Mechanical Code
Heating Appliance 15.00
Relocate or Replace Vent 12.00
Contort Cooling
Under 104000 BTU 15.00
Over 10,000 BTU 20.00
Compressor or Boiler
Under 3 H.P. 15.00
Compressor or Boiler
Over 3 HR to 15 H.P. 18.00
Over 15 H.P. to 30 H.R 35.00
Over 30 H.R to 50 H.R 62.00
Over 50 H.P. 95.00
Gas System 12.00
Vent Fan 15.00
Hoods 15.00
Miscellaneous 15.00
Permit Fee 28.00
Reinspection Fee 65.00
Uniform Swimming Code Fees Per Building Permit Fee
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8 SCHEDULE OF FEES AND CHARGES PAGE 18
Electrical Code
20.01 Fees New Construction and Additions Permit Issuance Fee $28 + fee for each
scheduled in Section 30.4 + $ 05 per ampere for each service switch 600 volts or less;
$ 02 per ampere for each additional service switch in excess of 600 volts. In addition
the following fees shall apply to each type of construction:
a. Gasoline Service Station Buildings $ 0.15 s.t
b. Drinking or Dining Establishments 15 Si.
c. Power Plants Pumping Plants 15 51
a. Woodworking Establishments, Planning Mills $ 0.07 sI
b. Steel Mills, Factories 07 s.f.
C. Manufacturing Plants, Assembly Plants 07 51
d. Gasoline Service station Open Canopies 07 sI
e. Repair Garages, Aircraft Repair Hangar 07 Si
f. Ice Plants, Cold Storage Plants 07 si.
g. Creameries, Bakeries, Food Processing Plants 07 si.
h. Hotel, Motel, Apartment Houses, Lodging Houses 07 s.f.
I. Dwellings 07 5.1
j. Dry Gleaning 07 si.
Description
a. Office Building $ 0.05 si.
b. Stores, Markets wholesale or retail) 05 Si.
C. Hospitals, Sanitariums, Convalescent Hospital 05 sI
d. Nursing Homes, Child Nurseries 05 si.
e. Schools 05
s.f.
f. Churches, Assembly Buildings 05 s.f.
9. Amusement Park Structures 05 si.
h. Any Occupancy Not Listed 05 5.1
a. Residential Accessory Building, Attached or Detached, Such As $ 0.03 si.
Private Garages, Carports, Sheds, etc.
b. Hotel, Motel, and Commercial Parking, Garages and Carports 03 5.1
C. Warehouses Up To and Including 5,000 si. 03 Si.
a. Warehouses That Part Which is Over 5,000 Si $ 0.02 sI
b. Storage Garages Where Work No Repair is Done 02 si.
C. Aircraft Hangars Where No Repair Work Is Done 02 s.f.
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 19
30.2 Alterations and Additions. $5.00 per clout
Where no structural work is being done, or where it
is impractical to use the square footage schedule.
30.3 Minimum Total Fee. $15.00 minimum
For Any Type of Construction or Installation.
30.4 Fees.
For Fixed Motors, Transformers, Generators, Heating and Cooking Appliances,
etc.
Converting all units to H.P. horse power), K.W. Kilowatt), KV.k Kilovolt ampere) tees
shall be determined as follow:
I $ 6.00
Over 1 not over 5
9.00
Over 5, not over 20 11.00
Over 20, not over 50 17.00
Over 50, not over 100 21.00
Over 100, not over 500 32.00
Over 500, not over 1000 45.00
over 1000, not oven.. 62.00
30.5 a) Lighting Standards
Less than 3 on a site 10.00
Each additional over 3 on a site 3.00
Lampholding devices, not a part of a lighting standard Festoon
Type)
Not over 50 12.00
Over 50, not over 100
22.00
Over 100 32.00
30.6 Signs and Outline Lighting
One Sign and Gas Tube System 10.00
Each Additional Sign or Gas Tube System 7.00
Each Transformer or Ballast 3.00
Each Motor or Flasher 3.00
Each Lampholding Device in Connection with a Sign
from 1 to 20 inclusive, 30 ea
next 100 15 ea
each additional 08 ea
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 20
30.7 Temporary, Permanent or Construction Poles
Temporary, Underground and Work-With Services:
Temporary Underground Services 28.00
Temporary Work-With Service Residential) 16.00
Temporary Work-With Service Commercial) 28.00
30.8 Miscellaneous
My electrical work for which a permit is required, but no fee is 15.00
herein provided
30.9 Annual Maintenance Electrician
Fee for each annual Maintenance Permit. Fees for all work installed under such permit
since date of last previous inspection shall be paid according to the above schedule at
the time the annual permit is issued. Where plans are required and the service is over
400 amps, a plan check fee equal to 50% of the permit fee shall be paid at the time
plans are submitted.
Uniform Sign Code Fees
Fees per Building Permit Fees
BUILDING ATTACHMENT I
Building Valuation Data SEE FOLLOWING PAGE INSERT
Fees as Current
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8 SCHEDULE OF FEES AND CHARGES PAGE 21
POLICE
Processing Time By Section
Processing T:m e by Patrol Officer: 40 minutes
Steps Involved in Handling CHP 180:
Request registration/Stolen Information via Radio
Inventory Vehicle/Complete CHP 180 Report
Deliver Report to Police Station
Log Report Into Report Ledger
Attach Computer Printout to Report
Processing Time In Communications: 4 minutes
Steps Involved in Handling CHP 180:
Run a Registration/Stolen Check
Relay Registration Information to Field Officer
Complete Log Card
Telephone Tow Agency
Complete Tow Ledger
Processing Time by Watch Supervisor Sgt.): 5 minutes
Steps Involved in Handling CHP 180:
Review Report for Accuracy/Completeness
Log report as Approved" in report ledger
Assist Records/Approve Release of Vehicle
Processing Time in Records Section: 46 minutes
Steps Involved in Handling CHP 180:
Processing: 5 minutes
Accepting Report and Pull Case Folder
Run 28/29 to Verify Information
Notification: 10 minutes
Complete Notification Form And Mail to R/O, L/O and Storage Company
File With Case
Entry of Report: 10 minutes
Enter Case and RIO Into Computer System
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8 * SCHEDULE OF FEES AND CHARGES PAGE 22
Release: 10 minutes
* Check JDIC or Case Ledger tor Case Number
Verify RIO Information and License Status
Get Detective Approve! for Release if Not Indicated by Patrol
Complete Form for RIO Signature
Make Copy of Release for RIO to Present to St&age Company
Directions to Storage Company
Refile Report
Paperwork Not Current: 3 minutes
Send New RIO to DMV for Registration Update
Send RIO to DMV to Pay Expired Registration, Upon Return Perform Release"
Again
Phone Contact: 5 minutes
Obtain License Number From RIO
Check JDIC or Case Ledger for Case Number
Pull Case and Determine Cause of Storage
Call OSJ Agency, for a Recovered Vehicle, for OK to Release
Tell RIO What is Necessay to Obtain Release
Refile Case
Notice of Impound Returned: 3 minutes
Pull Case to Determine if Vehicle Has Been Released
Mark Notification Form of Non-Release and Send Copy to DOJ
Attach Returned Envelope to Original Storage Form
Refile Case
COMPENSATION RATES
Position Hourly Rate Benefits Total
Police Officer $ 15.93 $ 8.44 $ 24.37
Dispatcher 11.30 3.96 15.26
Police Sergeant 19.38 10.27 29.65
Records Clerk 9.36 3.28 12.64
3rd Step Employee
Sworn at 53%lNon-Sworn at 35%
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 23
TIME AND MOTION RATES
Position Time Pay Rate Cost
Police officer 40 minutes $ 24.37 $ 16.40
Dispatcher 4 minutes 15.26 1.00
Police Sergeant 5 minutes 29.65 2.45
Records Clerk 46 minutes 12.64 9.66
Total Cost $ 29.51
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8SCHEDULE OF FEES AND CHARGES PAGE 24
Topic Page
General Fees 1-3
Community Center/Recreation Fees 4-6
Engineering Fees 7-13
Planning Fees 14-15
Building Fees 16 20
+ attachment
Police Fees 20 23
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
1998 075 CC RESO¹òw @˜ ’ Ú RESO 98-75 SEP 16 1998H0g8 OFFICIAL POLICE GARAGE RATE INCREASES FOR 1996
TOW RATES CURRENT RATE PROPOSED RATE
Standard vehicles $71.25 $77.00
Heavy Duty Tow $139.50 $150.50
Heavy Duty $208.75 $225.00
Special Equipment)
Heavy Duty $313.00 $337.50
Hazardous Cargo)
STORAGE RATES CURRENT RA TE PROPOSED RATE
Standard Vehicles $13.20 $14.50
Trucks Over 1 Ton $15.00 $16.00
trucks/boats/house trailers
under 20 feet)
Trucks/boats/Trailers $19.75 $21.50
over 20 feet)
Motorcycles $4.25 $4.50
Major Component Parts $3.25 $3.50
Bulk Items $0.10 per sq. ft. same
Additional Personnel $30.75 $33.00
Removal of Stolen $40.00 per hour $43.00 per hour
Vehicle Component
Pans
Removal of Bulk Items $71.25 per hour $77.00 per hour
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
RESO 98-75 SEP 16 1998H0g
8SCHEDULE OF FEES AND CHARGES PAGE ii
Sewer Installation:
12" 0 V.C.R 55.00 1.1
8"0 VC.R 50.00 l.t.
6.'0 V.C.P. 45.00 I.f.
Manhole 2000.00 ea
Sewer Saddle 200.00 ea
Dye Test permittee to provide dye) 150.00 ea
UTILITY PERMITS
Trench Length Plan Check Fee Issuance and Inspection
Fee
Up to 50' Minimum $25 Mm. $75 City does AC.
Mm. $ 100 Util. Co. does
AC. when directed
51' to 250' $25 + $ 25 If> 50' $100+ $ 50 It SO'
251' to 1000. $50 + $ 15 It> 250' $200+ $ 40 1.£> 250'
Over 10)0' $165+ $ 05 If.> 1000 $400+ $ 30 If.> 1000
Up to 200 s.f. add additional $4.00 s.f. for paving to be performed by the City.
City to perform the paving unless otherwise directed by the Director of Public Works.
NOTE: Fees applicable 10 work performed by both open trench and/or boring methods
of installation.
Non-Trench Work Plan Check Fee Issuance and Inspection
Fee
Up to 100 s.f. Minimum $25 Mm. $75 City does AC.
Mm. $125 Util. Co. does AC.
when directed
Over 100 s.f. $25+ $ 30 s.f.> 100 s.f. $125+ $1.00s.t> 100
Sf
Storm Drain
Construction of New Catch Basin C.B., Transition Structure, 3500.00 ea
or Manhole M.H.
Modification of the existing CO. or M.H. 2500.00 ea
Drain Pipe/Roof Drain 20.00 1.1.
Parkway Drain 600.00 ea
Storm Drain Mainline RCP) 130.00 If.
Storm Drain Lateral RCP) 90.00 1.1.
BIB]
37175-U01
RESO-U02
98-75-U02
SEP-U02
16-U02
1998-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
FO2255-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05
BIB]
37426-U01
1998-U02
075-U02
CC-U02
RESO-U02
LG1-U03
LI3-U03
FO1126-U03
FO1153-U03
DO2260-U03
C6-U03
RESO-U03
10/10/2001-U04
ADMIN-U04
RESO-U05
98-75-U05
SEP-U05
16-U05
1998-U05