Loading...
HomeMy WebLinkAbout1972 048 CC RESO1972 048 CC RESO(Ììþ/ÔÏRESOLUTION NO. 72-48 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK SETTING A TIME AND PLACE FOR HEARING REGARDING PROPOSED CHANGES IN THE WORK FOR ASSESSMENT DISTRICT NO. 71-1 RAMONA BOULEVARD. THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That the City Council does hereby find, deter- mine and declare, as follows: a) That the Engineer of Work and City Engineer have recommended that certain changes in the work be made be- cause during construction it was found necessary and in the best interests of the City to expedite under emer- gency conditions certain changes unforeseen on the plans, but encountered during the construction; and b) That said changes are described as follows: 1. Storm Drain Work A) Construct two sto?*m drain Transition Structures #1 per L.A.C.F.C.D. Drawing #2D-235 on Baldwin Park Boulevard, Station 1+42 and 1+90 because of two large interfering water mains. $1,510 each L.S. $3,020 B) Jack 301 of 27" R.C.P. under Bassett line SPRR, in lieu of open trench to clear railroad operation. $99 per lin.ft. excluding pipe) $2,850 C) Contractor's delays encountered at Robin Avenue for storm drain construction due to un- foreseen underground utilities and partial change from 15" RCP to 8" ACP. L.S. $400 D) Extra work due to storm drain connector stub at Baldwin Park Boulevard 45" RCP stub being 0.6' higher in elevation than anticipated relay portion of storm drain. L.S. $300 E) Encased shallow storm drain laterals at Bogart Avenue and Maine Avenue. Seven C.Y. $25/C.Y. L.S. $175 F) Encase storm drain lateral east of Maine with PCC due to shallow depth. 2 C.Y. $25/C.Y. L.S. $50 G) Extra for changes in catch basin depth due to depth adjustments to avoid underground utility conflicts. Total of ten catch basin depth changes L.S. $599.50 BIB] 37691-U01 1972-U02 048-U02 CC-U02 RESO-U02 LI3-U03 FO10488-U03 FO11508-U03 DO11586-U03 C6-U03 RESO-U03 3/10/2003-U04 ROBIN-U04 1972 048 CC RESO(Ììþ/ÔÏ2. Curb and Gutter Sidewalks A) Remove and replace 6" curb with I* gutter east and west of Southern Pacific Bassett Line railroad-realignment. 142 lin.ft. $4.25 L.S. $603.50 B) Remove and replace driveway curb with full height 8" curb and 1' gutter in front of Wimpy's Auto Repair per late.property owner request. 32.5 lin.ft. $4.25 L.S. $138.13 C) Remove and replace curb only west side of Maine at rear of Crocker Bank due to deteriorated condition. 26.1 lin.ft. $4.25 L.S. $110.92 D) Remove 79' of curb only and replace with curb and 2* gutter fronting church on Maine Ave- nue south of Ramona Boulevard. Also remove and replace 90 sq.ft. of sidewalk, all due to deteri- orated condition. 79 l.f. curb only $5.00/1.f. L.S. $395.00 90 s.f. sidewalks $1.35 L.S. $121.50 E) Remove and replace 10' of 8" curb and I* gutter for a driveway X" relocation at Vinney Milliken Lumber Yard to work around telephone vault manhole. 10 l.f. $4.25 L.S. $42.50 F) Extra si.dewalk removals for decorative sidewalk construction on private property, late property owner request. 3,047 s.f. 73/s.f. L.S. $2,224.31 G) Remove 8" curb only and replace with de- pressed driveway curb at the Hat Coffee Stand, Ramona Boulevard at Maine due to a late request by the property owner. 18.8 l.f. $4.25 L.S. $79.90 3. Traffic Signal Work A) Parkway relocation of traffic signal con- trollers at two locations, L.S. $250 B) Place No. 4 wire in lieu of No. 8 wire to traffic signal controller at Ramona-Maine due to excessive voltage drop. L.S. $435.85 C) Rewire far side" traffic signal display at Ramona-Maine Avenue north and southbound so sig nal phasing display coincides with near side" display. L.S. $330.05 2- BIB] 37691-U01 1972-U02 048-U02 CC-U02 RESO-U02 LI3-U03 FO10488-U03 FO11508-U03 DO11586-U03 C6-U03 RESO-U03 3/10/2003-U04 ROBIN-U04 1972 048 CC RESO(Ììþ/ÔÏ4. Miscellaneous Work A) Payment for railroad rail hardware, tie plates, bolts, etc., due to Railroad Coipany re- quirements for salvage and reuse. L.S. $2,340 B) Remove underground reinforced concrete' cul- vert at Bassett Line railroad spur. L.S. 200 C) Extend building roof drain pipes to curb 43 pipes at 28 separate building locations. 43 pipes 0 $25 L.S. $1,075 D) Replace two 3/4" gas lines in front of 14312-14 Ramona Boulevard due to being in sidewalk grade at Tradter Vik's:.. Per Standard Specifications, 2 9 $85 $170 E) Remove 3' cone on sewer manhole at Sterling Way south of Robin Way and replace with 2' cone due to street grade change. Contractor's time and materials ticket 59S2 $240 F) Fill underground tank 19 c.f. of fill front ing Crocker Bank. Contractor's time and materials ticket 5953 and 5954. $38.64 G) Extra painted pavement markings for traffic control added under field operating conditions, stop bars, arrows, etc. L.S. $388.70 H) Removal of aggregate base and asphaltic concrete for temporary detour over Bassett Line Railroad tracks due to delayed Southern Pacific Track crossing work. L.S. $1,021.94 I) Extra work to adjust sprinkler system vacuui breaker heights to meet late County Health Depart- ment safeguards against backflow. 8 locations L.S. $368.00 J) Modifications to fiye decorative water fountains for fuller water flow. L.S. $1411.00 Total Cost of Extra Work $19,379.44 c) That April S. 1972 at 7t30 P.m. in the Council Chamber of the City Hall, 14403 E. Pacific Avenue, Baldwin Park, is designated as the time apd place for the hearing, on whether said changes will be accomplished. SECTION 2. That the City Clerk shall certify to the adopt- ion of this Resolution, and cause a copy hereof to be published pursuant to Section 5232 of the Streets and Highways Code of the State of California. 3- BIB] 37691-U01 1972-U02 048-U02 CC-U02 RESO-U02 LI3-U03 FO10488-U03 FO11508-U03 DO11586-U03 C6-U03 RESO-U03 3/10/2003-U04 ROBIN-U04 1972 048 CC RESO(Ììþ/ÔÏADOPTED and APPROVED this 15th day of March_____^ 1972. f L^^^y ADELINA GREGORY, Mrf^T2— ATTEST: fe^^/^^^^^ TmMA L. bATZUS. CITY CLfcRK STATE OF CALIFORNIA COUNTY OF LOS ANGELES SS: CITY OF BALDWIN PARK I, THELMA A. BALKUS, City Clerk of the City of Baldwin Park, do hereby certify that the foregoing resolution was duly adopted by the City Council of the City o,f Baldwin Park and signed by its Mayor at a regular meeting held on the 15^ day of March_______> 1972, by the following vote: AYES: COUNCILMEN: Hamilton, B1ewett,King> McCaron and Mayor Gregory NOES: COUNCILMEN: ABSENT: COUNCILMEN: J TOELMA L, BALKUS. CITY CLERK A BIB] 37691-U01 1972-U02 048-U02 CC-U02 RESO-U02 LI3-U03 FO10488-U03 FO11508-U03 DO11586-U03 C6-U03 RESO-U03 3/10/2003-U04 ROBIN-U04