Loading...
HomeMy WebLinkAbout1976 069 CC RESO1976 069 CC RESO(Ììøò 1976 069 CC RESO(Ììøò 1976 069 CC RESO(Ììøò 1976 069 CC RESO(Ììøò 1976 069 CC RESO(Ììøò 1976 069 CC RESO(Ììøò 1976 069 CC RESO(Ììøò 1976 069 CC RESO(Ììøò 1976 069 CC RESO(Ììøò 1976 069 CC RESO(Ììøò 1976 069 CC RESO(Ììøò 1976 069 CC RESO(Ììøò Resolution No. 76-69 CODE SECTION t 7501 8012 8013(b) 8015 DESCRIPTION 30.6 Signs and Outline Lighting One sign and gas tube system Each additional sign or gas tube system Each transformer or ballast Each motor or flasher Each lamphotding device in connection with a sign; from 1 to 20 inclusive, each next 100 each each additional 30.7 Temporary, Permanent or Construction Mes————————————————— Temporary, underground and work-with services: Temporary underground service Temporary work-with service residential) Temporary work-with service commercial) 30.8 Miscellaneous Any electrical work for which a permit is required, but no fee is herein provided 30.9 Annual Maintenance Electrician Fee for each annual Maintenance Electrician Permit. Fees for a11 work installed under such permit since date of last previous in- spection shall be paid according to the above schedule at the time the annual permit is issued. Where plans are required and the service is over 400 amps, a plan check fee equal to 50% of the per- mit fee shall be paid at the time plans are submitted Uniform Sign Code Fees Fees Per Section 7000 Btdg. Permit Fees Subdivision Maps Filing and processing fee Parcel Maps Filing and processing fee Boundary Line Adjustments Filing and processing fee AMOUNT 3.00 + 3.00 2.00 0.75 0.75 0.10 0.05 0.03 10.00 5.50 10.00 5.00 10.00 75.00 + 5.00 per lot 50.00 + 5.00 per parcel 25.00 per map 11- BIB] 37686-U01 1976-U02 069-U02 CC-U02 RESO-U02 LI3-U03 FO10488-U03 FO11012-U03 DO11312-U03 C6-U03 RESO-U03 3/5/2003-U04 ROBIN-U04